The installed systems will need capped 100mm diameter sampling ports accessible above ground to enable analysis or the performance of the system according to requirements in effect. The installed systems will need Oxygen Demand Vents, as per the Advanced Enviro- septic™ requirements. Oxygen Demand Vents ensure air is drawn completely through the Advanced Enviro-septic™ piping. Our recommendations do not preclude other or additional Land Application Facilities. Wastewater Treatment Systems and Land Application Facilities should be designed to remove as much nitrogen as possible by ammonification, settlement in sludge, denitrification, long residence times or plant uptake. Water conservation implementation will reduce the hydraulic load on the Land Application Facility and subsequently improve its performance and serviceable life. Effluent quality from the treatment plants must comply with the criteria presented in the Queensland Plumbing and Wastewater Code and AS/NZS 1547-2012 On-site Domestic Wastewater Management and be confirmed with the regulatory authority. Unearthed Geotechnical P/L. 7 Design Report 022-003
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.