wastewater design report
Very large file: it may take a few minutes
The original of this document is very large (13.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
5.1 Installation Notes. All installation works, components and fittings must comply with AS/NZS 1547- 2012 On-site Domestic Wastewater Management, and the Queensland Plumbing and Wastewater Code, and the local authority. All installation works, components and fittings must comply with Advanced Enviro- septic™ design & installation manual. The Advanced Enviro-septic™ pipes must be stored and installed adequately to prevent contamination of the fabric. Soils are susceptible to damage during the construction and installation processes. The natural integrity of the existing soil conditions of the Land Application Areas must be preserved at all stages of the proposed development. Damage to the existing soil profile must be avoided. The laying of the system sand and sand bed extension must occur immediately after excavation. The laying of the system sand and particularly the sand bed extension must be performed without compaction by wheeled vehicles or machinery. This facility must not be constructed or installed during or immediately after periods of wet weather and water must not be allowed to enter the excavation during construction. When excavating for the Advanced Enviro-septic™ pipes excavate in small bites using a bucket fitted with ripper teeth to preserve the permeability characteristics of the natural soil. Scarify/rake all smeared excavated surfaces. We recommend ripping the base of the entire excavation, along the contour and parallel to the lay of pipes, to a depth 200mm before backfilling with sand. We recommend the application of dolomite/gypsum at a nominal rate (say 0.5 kg/sqm) when preparing the existing soil. This will assist with both plant growth and pH control (further applications may be required during the serviceable life of the Land Application Areas). Particular care should be taken with the layout and construction of supply line trenching/pipework, as with all drainage, plumbing and electrical trenches to inhibit surface water infiltration along and into the Land Application Areas. If necessary all supply line excavations and trenching shall be backfilled with interceptors. Particular care should also be taken with the layout and construction of the Land Application Area trenching/pipework so that released effluent cannot travel back along trenching causing excessive soil moisture in some areas. As with all effluent disposal in Land Application Areas, the release of effluent along the contours (i.e. level) is both elementary and critical to achieve efficient spread and even disposal. The trenches/beds must be constructed level. Unearthed Geotechnical P/L. 8 Design Report 022-003
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.