                                                                                                                                SEDIMENT AND EROSION
                                                                                                                                   CONTROL DETAILS
                                                    GRATE TO BE GEOFABRIC
                                                    WRAPPED.


                                                                                                                                                                                                                                                                                                                         LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                           LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                                                                                                                                                                            LTD
                                                                  SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES
                                                                                                      1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.                                              OVERLA                            TRAPPED SEDIMENT
                                                                                                      2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                            ND FLO                                                                                                                                               RPEQ 4928
 ROLL OF NETTING FILLED
 WITH 50 TO 70mm GRAVEL.
                                                                                                      3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                             W                        TURF STRIPS                                                        OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118

                                                                                                         WATER FLOW.                                                                                                                                                                                                    THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                      3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.                                                                                                                         LINDSAY CONSULTING PTY LTD AND IS FOR
                     KERB INLET PROTECTION                                                            4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                      5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.                                                                                                                                    THE SOLE USE OF THE CLIENT. NO PART
                                          NTS                                                                                                                                                                                                                                                                           MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                           PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD
                                                                                                                               DIRECTION OF FLOW                                                                                                                                                                        CLIENT AND PROJECT DESCRIPTION

                    OVERLA                TRAPPED SEDIMENT
                                                                                                                                                                                                              TYPICAL GRASS FILTER STRIP DETAIL                                                                           GJ GARDNER NOOSA
                             ND FLO
                                   W              TURF STRIPS                                                                                                     BATTER GRADE                                                                N.T.S.                                                                      PROPOSED RESIDENTIAL
                                                                                                                                                                  1:2 max.                                                                                                                                                DEVELOPMENT
                                                                                                 CHANNEL STABILISATION                                                           UNDISTURBED                                                                                                                              4-6 HAY STREET,
                                                                                                 AS REQUIRED                                                                     AREA                                                                                                                                     TEWANTIN
                                                                                                                           NOTE:-
                                                                                                                           Min. GRADE 0.25%
                                                                                                                           Max. GRADE 0.75%
                                                                                                                           MUST HAVE A STABILISED OUTLET.
            TURF FLARES TO
            RESTRICT SCOURING
                                                                                                                           MAYBE USED AS CONTOUR DRAINS
            ALONG TURF EDGE                                                                                                                                                                                                                                                                                             DRAWING TITLE
                                                                                                                                                                                                                                                                                                                        EROSION CONTROL
              TURF STRIP
              BEHIND KERB                                                                                                                CAN BE CONSTRUCTED WITH                                                                                                                                                        DETAILS CONTINUED
                                                                                                                       GRADIENT OF DRAIN OR WITHOUT CHANNEL
                                                     road surface
                                                                                                                       1% to 5%
                                                                                                                 DIRECTION
                                                                                                                                                        ALL BATTER GRADES
                                                                                                                                                        2(H):1(V) MAX.                                                                                                 SURFACE ROUGHENING
                                                                                                                 OF FLOW
                                                                                                                                                                                                                                                                                                                        SCALES
                                                                                                             150 mm min.                                    300 mm min.
                                                                                                                                                                                                                                                                               150 MM MIN.      SPILLWAY
                                                                                                                                                                                                                                                                                                150 MM MIN.
                      GRASSED     FILTER STRIPS
                            NOT TO REGULAR SCALE
                                                                                                                                      2 metres min.
                                                                                                                         NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                                                                                         WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.

STORMWATER TREATMENT DETAILS                                                                                         EARTH BUND CUT OFF DRAIN                                                                 AGGREGATE OR RECYCLED CONCRETE.                                      ROCK TRENCHED 200 MM INTO GROUND

SEDIMENT FLOCCULATION                                                                                                                                                                                                                                          FLO
The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles                                                                      W
to be drawn together and settle under gravity.

METHOD OF APPLICATION                                                                                                                                                                                                                                                  SPACING OF CHECK DAMS ALONG CENTRELINE
                                                                                                                                                                                                                                                                                                                        SURVEY DATUM
Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment                                                                                       AND SCOUR PROTECTION BELOW EACH CHECK
basin. It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                           DAM TO BE SPECIFIED ON SWMP/ESCP                  .
Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table. The above dosing rate for the site
should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                                                                                                                    ROCK CHECK DAM
The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).                                                       ROCK CHECK DAM CONSTRUCTION NOTES                                                                                    ASSOCIATED CONSULTANTS
                                                                                                                                                                                                   1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
METHOD OF TESTING THE STORMWATER                                                                                                                                                                      MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                      BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.                         REPRODUCED AND
The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
                                                                                                                                                                                                   2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
access so no sediment is resuspended while the testing is being conducted.
The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                    TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.                            UPDATED FROM
                                                                                                                                                                                                   3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.
If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the
                                                                                                                                                                                                      ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
                                                                                                                                                                                                   4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                                                                                                                                                                                          CONTOUR CONSULTING
water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.                                                     DAM.                                                                                                                ENGINEERS APPROVED
METHOD OF DEWATERING                                                                                                                                                                                                                                                                                                      OPW DRAWINGS FOR
The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                          STABILISE STOCKPILE                PROJECT 3045 FOR OPW
                                                                                                                                                                                                                                                                                       SURFACE
                                                                                                                                                                                                                EARTH BANK
                                                                                                                                                                                                                                           E (
                                                                                                                                                                                                                                               MA  X.)                 2:1                                                22/0218 APPROVED 31
                                                                                                                                                                                                                                          P                                  SLO
 STORMWATER DISCHARGE QUALITY CRITERIA
                                                                                                                                                                                                    FLOW
                                                                                                                                                                                                                                 2:1
                                                                                                                                                                                                                                       SLO                                      PE
                                                                                                                                                                                                                                                                                     (MA                                  OCT 2022
                                                                                                                                                                                                                                                                                        X.)
   ACCEPTABLE TSS                     ACCEPTABLE PH             DISSOLVED O2
   50mg/L                               6.5 - 8.5                   > 80%                                                                                                                                                                                                              SEDIMENT FENCE
                                                                                                                                                                                                                                          TOPSOIL STOCKPILE                                                            REVISION LIST
                                                                                                                                                                                                     TOPSOIL STOCKPILE CONSTRUCTION NOTES                                                                              A ORIGINAL ISSUE                                     15/10/24
                                                                                                                                                                                                                                                                                                                       B OVERLAND FLOW PATHS ADDED                          18/12/24
 SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                               1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED
                                                                                                                                                                                                        WATER FLOW, ROADS AND HAZARD AREAS.
 AGENT          INDICATIVE DOSAGE                   COMMENTS                               PRECAUTIONS & CONSTRAINTS                    MIN. REQD. ON SITE                                           2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
                                                                                                                                                                                                     3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                                                                                                                     4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
  GYPSUM        32kg/100cub.m                       LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.      260 kgm                                                          ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                    SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                     5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                        STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
 NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.



                                                                                                                                                                                                                                                                                                                      Computer File
                                                                                                                                                                                                                                                                                                                                                        240608OW.DWG
                                                                                                                                                                                                                                                                                                                      DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                         24-0608-C11      11 B
Log in to download the original file

240608OPW-B.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.