                                                                                         2008/255



10.    Existing trees on the site and within road reserves are to be retained, except where required to
       be removed due to building operations or the conduct of the approved use. In this regard, the
       removal of vegetation shall not extend beyond 3 metres of the building footprint of the
       Detached House.
11.    All other vegetation shall be protected from interference resulting from clearing or construction
       activities by:
       11.1.   Clearly marking vegetation to be retained with flagging tape;
       11.2.   Installing protective fencing around the drip line of the vegetation;
       11.3.   Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
               cause interference with vegetation; and
       11.4.   Low impact construction techniques are used around vegetation to minimise
               interference with the vegetation.
12.    Cleared vegetation is to be suitably processed by one of the following methods and removed
       from the site: -
       12.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
               loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
               minimum of 10 metres between edges of heaps.
       12.2.   Disposal for firewood.
       12.3.   Disposal for landscaping purposes.
       12.4.   Transport to alternative site for breaking down materials provided that all necessary
               permits have been obtained to allow the alternate site to be used for this purpose.
       12.5.   The Applicant is advised that other methods may be considered provided full details of
               the method are submitted.
       12.6.   The applicant is advised that burning off is an unacceptable method of disposal.
13.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
       not constructed under overhead electricity transmission lines, or within any easements.
14.    Sediment and erosion control measures must be in place prior to works commencing. If such
       measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
       can be issued if sediments from the site are found to enter or have the potential to enter
       Council’s stormwater system or natural waterways.
15.    The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines.
       Landscape construction shall be implemented in accordance with the horticultural industry
       best practices.
Currency
16.    The Development Permit for a material change of use lapses if the use has not happened by
       14 August 2012, unless an application to extend the currency is approved by Council.
5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger             Referral Status     Referral Agency          Referral Address

 Nil




                                                                                       Page 3 of 8

Used in these records

About this file

File size
59 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000255.001 [As Published].pdf · 59 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.