07/0773 - Preliminary building work assessable against planning scheme [As Published] · 172007.773

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Contaminated land 17. The application involves: (tick she applicable box/es)

Applications invotving material change of use C1) reconfiguring a tot for which all of part of the premises are -

anal reconfiguring lo ay Wfges iis (2) premises mentioned in the IPA, schedule 8, part 1, table 2 -

For more information refer to Guide 5, « item 5, inctuding the exemption otherwise provided for by paragraph (d);

Unless you answered "none of the above” to » item 6, including the exemption otherwise provided for by paragraph (e); or

17, the apptication requires assessmomt by the « item 7, including the exemption otherwise provided for a mining activity or petroleum
Environmental Protection Agency (EPA). If an activity; or

agency other than EPA is the assessment ‘ . ; ;

manager for the application, EPA will be a * (bo) inan area for which an area management advice has been given for unexploded
Concurrence agency for the application in ordnance - complete Part N of Form 7 :

relation to this matter.

(1 (i) a material change of use-

. (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or .

(b) assessable against the planning scheme and if all or part of the premises is in an area

for which an area management advice has been given for unexploded ordnance -
__ complete Part N of Form 1
wh none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es}
io more information refer to schechte 2of the IP. C1) reconfiguring a tot where any part of the tot is -
Crs you soe ed “none of the above’ to * subject to an easement in favour of a distribution entity or transmission entity under the
18, the application wiggers referral to the Electricity Act 1994 and the easement is for a transmission grid or supply network under
agency to which the easement is aranted in that Act; or
[avout of as advice agency. « situated within 100m of a substation site:

Cl (i) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Evectricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located whoily or partly in the easement;

CI Gi) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;

, CW) operational work that is filling or excavation assessable against the planning scheme,

Not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

mw « the work is focated wholly or partly within 10m of a substation site;

(v) none of the above.
Land designated for community 19. Does the appfication involve development assessable against the planning scheme and on land
infrastructure designated for community infrastructure?
aeaepated fr Sono noes ay (i) intended to be supplied by a public sector entity: and
trigger this referral. (i) on tand not owned by or on behalf of the State; and

For more information refer to schedule 2 of the
Ip lati

Mf you answered “YES” to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.

If anagency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

(ii) other than development -
(2) for the designated purpose; or
(b)’ carried out by, or on behalf of, the designator.
NO

Ol ves

Page 6

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0773 - Preliminary building work assessable against planning scheme [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.