Council archive · source document
07/0773 - Preliminary building work assessable against planning scheme [As Published] · 172007.773
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan .
__ For more information refer to schedule 2 of the
IP Requtation.
Refer to Chapter 2, part SA and schedute 10 of
the | Plannis 7, and schedule
2 of the Reguiatory Provisions for relevant
definitions.
«Unless you answered “none of the above" to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
Fisheries matters
For more information refer to schedule 2of the IP
Requlation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
{(DPI&F),
~ Ifanagency other than DPIGF is the assessment
manager for the application, DPIF is a
Concurrence agency for the application in
relation to items () - (iv) and an advice agency
in relation to item (v).
IDAS Assessment Checklist Version 20, 2 Aprit 2007
20. The application involves (tick applicable box/es) -
0 4) a material change of use of premises —
(a) ina Major Development Area in the Urban Footprint for -
O @) anurban activity-
(Jinan area included in a structure plan where the IPA, section 3.1.6
applies;
C1 inanarea not included in a structure plan where -
+ the IPA, section 3.1.6 applies to the application for the material change
Of use; or
« the premises exceeds 10,000m2:; or
* the gross floor area (GFA) on the premises will exceed 10,000m2: or
+ impact assessment is required under the relevant planning scheme
C @i) intensive animal husbandry, ot
C fii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Areator -
Ol @ an urban activity and not specified in section 2.4(2); or
C1 @i _residentiat development involving a rural residential Purpose and not
specified in section 2.6{2) .
(c) in the Rural Living Areator an urban activity and not specified in section 2.8(2);
{d) in the fnvestigation Area for -
(J (an urban activity and not specified in section 2.10(2);
(1 i) residential development involving a rural residential purpose and not
specified in section 2.12(2): or ,
0 (ii) intensive animal husbandry
U1 @i) reconfiguring a tor-
On land in a Major Development Areain the Urban Footprint that is:
(@) not included in a structure plan; and
{0} not specified in section 3.1(2).
XV ei) none of the above
21. The application involves: (tick tne applicable bowes)
(O@ anassessable material change of use for aquaculture - complete Part 0; of Form 1.
Oi) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form f;
CO ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 7;
CJ () assessable operational work that is the removal, destruction or damage of a marine
Plant - complete Part O2 of Form 1;
C1) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
aw none of the above.
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0773 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.