Council archive · source document
07/0773 - Preliminary building work assessable against planning scheme [As Published] · 172007.773
INTEGRATED PLANNING ACT 1997 Integration of land use and public transport” For more information refer to Guide 23, schedule SA af the IPA. & schedule 2 of the IP Requiation. Unless you answered “none of the above", the application triggers referral to QT as a concurrence agency. 22. . IDAS Assessment Checklist, Version 20, 2 April 2007 The application involves: (tick she appticable boxfes)— C1 (i) a material change of use assessable against the planning scheme for a purpose “mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. (1 (i) reconfiguring a fot— LJ (a@)__ ontand that is completely or partly within a public transport corridor, and the total number of lots increases; (11 (b) on land that is completely or partly within a future public transport corridor or an airport's public safety area; (1 __ ontand thatis within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000mz or greater; C1 @ fora residential purpose within the 25 ANEF contour for an airport; C1 ©) _ fora residential purpose resulting in 100 or more allotments. 1 (iil) operational work assessable against the planning scheme, but not associated with.a material change of use mentioned in (i) above or reconfiguring a fot mentioned in (ii) above, on land that— (C1@ _ iscompletely or partly within a public vanspont corridor or a future public transport corridor; CJ (0) will result in work that encroaches into an airport's operational airspace. [Aiv) none of the above. Railway safety and efficiency For more information refer to Guide 23, schedule 8A of the IPA & schedule 2 of the JP Regulation. Unless you answered "none of the above", the application triggers referral to QT as a concurrence agency. Moonie to Brisbane pipeline For more information refers to schedute Zof the [P Regutation. Uniess you answered "none of the above’, the application wiggers referral to the holder of pipetine ilcence No 1 issued under the Petrofeum| Act 1923, cunrenity Santos QNT Pty Ltd, for advice, 23. 24. The application involves: (tick the applicable box/es)— (1) () a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the IP Regulation and exceeding the thresholds. set by that schedule. O Wi) reconfiguring a tot— C1 (a) ontand that is completely or partly within a future public transport corridor, future railway land of a railway tunnel easement; (1 (>) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m? or greater; (1 (©) ontand that abuts rail corridor tand, commercial corridor land or future Tailway land, and the total number of lots increases; (1) on land that abuts rail corridor land, commercial corridor land or future railway ___ land and an easement abutting the corridor or future railway land is created; (1) ontand that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; » CI() fora residential purpose resulting in 100 or more allotments, O ti) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m’, on land that— Ci (a) is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; C1) (b) is completely or partly within future railway land, or a railway tunnel easement; (J (©) abuts rail corridor land, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. iw) none of the above. The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick she applicable box/es)— (CG) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. C1 (il) reconfiguring a tot CO tii) operational work assessable against the planning scheme, that is filling, excavation, compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the work is located wholly or partly in the easement. an none of the above. Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0773 - Preliminary building work assessable against planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.