Original source · versioned page text
Att5 - Traffic Impact Report
Design Response
Performance outcomes Acceptable Outcomes
AO9.2 Alternate Solution
Attractive and safe pedestrian and Consistent with the camp experience, it is
cycle connections to and through the expected that campers will walk
site are provided with shade trees, throughout the campgrounds utilising
graded walking and cycle paths and unformed paths.
lighting.
AO9.3
Pathways are provided to cater for Alternate Solution
shared use and cater for both See above.
commuting and recreational usage.
AO9.4
Pathways have ramps at all kerbs Alternate Solution
designed for wheelchair and pram See above.
access across roads.
AO9.5 Alternate Solution
Development has convenient and See above.
prominent pedestrian entrances that:
1. are orientated towards the street; and
2. cater for universal access.
AO9.6 Alternate Solution
Pathways are adequately lit and have
See above.
navigational signs.
AO9.7 Alternate Solution
Pedestrian and cycle pathways are See above.
designed and constructed to:
1. provide a stable, smooth surface,
including across driveways, sections and
joins;
2. be easily maintained;
3. have a width and longitudinal gradient to
cater for projected usage;
4. provide clear sight-lines for safe use; and
5. be free of any obstructions such as
fences, signage and bollards
AO9.8 Not Applicable
www.bmctraffic.com.au 19
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.