PO15                                                                          Can Comply with Performance Outcome
Any alterations or repairs to      No acceptable outcome provided             It is recommended that repair of any
infrastructure as a result of the                                             damage to existing infrastructure caused
development are made at no cost to                                            as a result of construction of this project be
Council.                                                                      included as a Condition of Approval.
PO16                                                                          Complies with Performance Outcome
Road infrastructure is proven to be          No acceptable outcome provided   Swept path assessments have
suitable for its use prior to Council                                         demonstrated suitability of the Kabi Road /
accepting the dedicated asset.                                                Cootharaba Road intersection to
                                                                              accommodate the site’s design vehicle.


Staged development Table 9.4.7.3 Criteria for assessable development (part)
                                                                              Design Response
Performance outcomes                         Acceptable Outcomes
Staged development
PO17                               No acceptable outcome                      This development will be conducted in
Staged development is planned,     provided                                   single stage.
designed and constructed to ensure
that—
1.   each stage of the development can
     be constructed without interruption
     to services and utilities provided to
     the previous stages;
2.   the infrastructure provided is
     capable of servicing the entire
     development; and
3.   the materials used are consistent
     throughout the development.




www.bmctraffic.com.au                                                                                                       23
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
Log in to download the original file

Att5 - Traffic Impact Report.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.