Original source · versioned page text
Att5 - Traffic Impact Report
Activity Centres and Community Facilities Table 9.4.7.3 Criteria for assessable development (part)
Design Response
Performance outcomes Acceptable Outcomes
Activity Centres and Community Facilities N/A
Environmental Protection Table 9.4.7.3 Criteria for assessable development (part)
Design Response
Performance outcomes Acceptable Outcomes
Environmental Protection To be addressed by Civil / Environmental Engineer
External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Design Response
External Works and Infrastructure
PO14 AO14 N/A
Development is provided with Where not already existing, the The surrounding infrastructure is consistent
external works— following infrastructure components with the rural zoning of land, including a
1. along the full extent of the frontage are provided at the frontage of the sealed carriageway in Kabi Road between
of the site to an appropriate site— the site access and Cootharaba Road.
standard having regard to the 1. full width sealed road;
specified function of the road; and 2. concrete kerb and channel where
2. provided beyond the site’s frontage appropriate;
if required. 3. forming and grading to footpaths;
4. vehicular kerb and footpath
crossings;
5. a constructed bikeway;
6. a constructed footpath;
7. a constructed carriageway;
8. required alterations to public
utility mains, services or
installations;
9. construction of any required
alterations to public utility mains,
services or installations;
10. stormwater drainage works; and
11. installation of electrical conduits.
www.bmctraffic.com.au 22
BMC22089: 59 Kabi Road, Cootharaba
8 August 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.