Council archive · source document
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463
Plans and drawings: the text below has words only, no drawings.
Very large file (76.1 MB): may take a few minutes to open.
~
~
Pia" b~,ode hee<
-
l i~I !i~ ~]~ ~ flil~lr ~. -
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
.
-
Part J.. Of ~
Isox .[),tJJ J jv J
C:\Documents and Settings\eje\Oes!...1.op\Multi Part Record Cover Sheet NEXT PART (3).doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 42 (of 92)
Page 2
.,
MEMORANDUM
-..
BLIGH TANNER
CONSUL11NG ENGINEERS
To: Fulton Trotter Level 9, 269 Wickham St
PO Box 612 Fortitude Valley
ATT: Mark Kalinowski QLD 4006, Australia
T +61 7 3251 8555
CC: Michael Edrich -
Craven Ovenden F +61 73251 8599
Leon Rowlands -
Sunshine Coast Council [email protected]
www.blightanner.com.au
Date: ast May 2013 ABN 32061 537666
From: Alan Hoban
Pages: 5 in total.
RE: Noosa Flexi Learning Centre -
Stormwater Runoff
SUMMARY
This memo provides further information to support the Site Based Stormwater Management Plan
for the Noosa Flexi Learning Centre (Bligh Tanner ath August 2012). It further describes how the
site minimises ground-level impervious areas and seeks to mimic the pre-development hydrology
of the site. This memo has been prepared for the purposes of:
1. Demonstrating that the site does not need a formalised stormwater connection to the
street.
2. Demonstrating that the site has no effective impervious area for the purposes of
calculating Infrastructure Charges, based on Council’s definition.
APPLICATION STATUS
Please note that there is a current negotiated decision notice lodged in relation to this
development application.
DESCRIPTION OF STRATEGY
In order to avoid affecting the vegetation communities of the Girraween Nature Reserve through
increased wetness, the site seeks to avoid the generation of stormwater runoff by avoiding, to the
extent practicable, any ground level impervious areas. This is consistent with the low-impact
design intent of the site, and also plays a key role in reducing upfront and ongoing costs to the
school, and to Council, associated with the provision of stormwater infrastructure.
The occurrences and magnitude of surface runoff events from the site are reduced as a result of
the proposed strategy due to the detention and reuse of runoff.
In the rare occurrences when surface runoff is generated, it will discharge across the front
boundary of the site via overland flow to the existing kerb and channel, as it currently does,
without causing any nuisance conditions.
An overview of the strategy is presented in Figure 1 below.
Page 3
Bligh Tanner Page 2 of6
Current State
..
Runoff
{.
"
’II.
1.8 MUyr
(270 Us peak)
Noosa Flexi-Learning Centre Development
precipitation
8.9 MUyr
..
Runoff
1.3 MUyr
(220Us peak)
Figure 1: Overview of the low-impact stormwater strategy.
Tf:le site currently has high infiltration rates
Percolation testing on the site was carried out in September 2012 by Soil Surveys. The field test
method employed in this investigation, ie. Constant Head Test, was carried out in accordance
with AS 1547-2000, Appendix 4.1 F. At the test location, a 100mm diameter borehole was drilled to
a depth of 500mm. The test hole was then filled to a depth of 250mm, the well permeameter was
put in place and the test commenced. When the fall became constant, ie. 10% or less change
between successive readings, or flow eased, the test was completed. Readings were taken at 30
second intervals. At four locations across the site, saturated infiltration rates of 4.0, 4.2, 4.6 and
3.9 m/day were recorded, or an average rate of 170 mm/hr.
High infiltration rates are preserved in the design
. For 95% of the site, ground-level permeability is maintained.
. 68% of the site is free of structures, and significant amount of the site will remain
untouched by construction activities.
. 25% of the site is roofs, and most of the buildings are lightweight structures which sit on
raised piers, preserving ground-level permeability beneath them. Buildings are connected
via raised boardwalks rather than concrete pathways;
o 40% of roofs drain to tanks
o 40% of that water is used, primarily for toilet flushing (accounting for about a 0.4
MLlyr reduction in runoff volumes).
o All surplus roof water discharges to infiltration trenches beneath buildings (the
infiltration trenches have a 100 mm extended detention, are filled with clean
washed gravels, and have been incorporated into the structural design of the
building footings)
.
Only 5% of the site consists on slab-on-ground construction. This was necessary to
provide for the Sound building (for acoustics), and part of the Create building sits on a
Page 4
Bligh Tanner Page 30f6
mounded area where it made sense to build directly onto natural surface. Roof runoff
from the roofs of slab-on-ground buildings is directed into infiltration trenches located
beneath adjoining buildings/boardwalks.
. 7% of the site is carpark, and a permeable gravel carpark pavement is proposed using the
Geobrics geoweb product (refer Figure 1 below).
_.J
Figure 2: Sample installation of ’Geoweb’trafficable permeable pavement at Hervey Bay.
High infiltration rates will be preserved post-construction
Construction activities have the potential to impact on the natural permeability of the site soils
through generation and inappropriate disposal of fine materials, silts and slurries, and excessive
compaction of soils. This will be managed on this site as follows:
. Construction drawings require infiltration tests to be conducted before and after
construction (refer drawing C001 and C100).
Construction vehicle access will be limited to defined routes to mini mise compaction,
although the infiltration rate of the site sands is likely to be fairly resilient to moderate
compaction.
The avoidance of slab-on-ground construction will reduce the risks of concrete slurry and
the like being poorly disposed of.
. The contractor is to submit detailed work method statements to the superintendent for
approval that clearly document how the infiltration rate of site soils will be preserved (as
documented on drawing C001 and C100). This is to include details about:
o how the site will be accessed and how potential compaction from vehicle and plant
movement will be managed
o how the infiltration systems beneath buildings will be constructed, and protected
from construction debris
o how liquid, slurry and fine particular materials will be handled
o rectification measures to restore pre-development infiltration rates where
necessary.
ANALYSIS
Conventional hydrologic analysis techniques are not well suited to analysing the hydrologic
performance of the site due to the high infiltration rates of the in-situ soils and the atypical nature
of the development. For example, the commonly used rational method is based on a coefficient of
runoff approach, and so would estimate some runoff would be generated from almost any storm.
26
However the rainfall intensity (11ooyr, min) of 163 mm/hr is less than the infiltration rate of the site
soils, and so no surface runoff is likely to be generated for a 100 yr event across the whole site.
Page 5
Bligh Tanner Page 4 of6
Note that very short times of concentration would lead to some runoff from the front of the site
due to partial area affects.
A continuous simulation over a 10 year period was undertaken with MUSIC (the modelling
approach is described in more detail in the Stormwater Management Plan). This analysis takes
into account baseflows as well as surface runoff, and demonstrates that post-development flows
were never higher than predevelopment flows, as shown in the cumulative frequency graph
shown in Figure 1 below.
A subsequent analysis in MUSIC, using ’secondary links’ to isolate surface runoff from baseflow,
shows that, for the peak surface flow for the period of analysis reduces from about 270 LIs to 220
LIs, a reduction of about 20%. Further results of this analysis are presented in Table 1. It is
important to note that these results are highly conservative (i.e. they overestimate runoff) as they
assume standard rain-fall runoff parameters from the MUSIC modelling guidelines (Water by
Design V1 2010) that were calibrated to streams in catchments with lower infiltration rates than
the sandy soils of this site. Nonetheless, as the same ’forested’ rainfall-runoff parameters have
1
been used for the pre and post development cases they provide a useful guide as to the relative
impacts of the development.
Table 1 Summary of results from MUSIC modelling
Predevelopment Post development
Maximum flow (surface flow and 275 LIs 225 LIs
baseflow)
Maximum flow (surface flow only) 274 LIs 220 LIs
Mean annual flow (surface flow 2.9 ML/yr 2.08 MLlyr
and baseflow)
Mean annual flow (surface flow 1.8 MLlyr 1.3 MLlyr (rainwater
only) tanks account for 0.4
MLlyr)
100
10
-;::
ro
"0
-
’"
1
E
::
..Q
-
>
0.1
-pre
’(ij
0
-post
0.01
0.001
0% 20% 40% 60% 80% 100%
Cumulative frequency
1
The 600 m2 turfed area uses ’Urban’ rainfall runoff parameters to reflect the reduced infiltration rates
associated with turfed area associated with topsoil and compaction resulting from prolonged use.
Page 6
Bligh Tanner Page 50f6
Figure 3 Cumulative frequency graph showing post development runoff rates are expected to be
lower than pre-development rates (note logarithmic axis).
STORMWATER CONNECTION AND LAWFUL POINT OF DISCHARGE
Development Condition #23 requires that ’the site must be provided with a storm water drainage
system connecting to a lawful point of discharge’
According to QUDM (2013Provisional edition) Section 3.4 Lawful point of discharge:
A ’lawful point of discharge’ test has been used by the industry to assess whether
discharge at a particular location is lawful. The test is focused on whether all applicable
regulatory and other legal requirements have been met or consent has been obtained to
allow stormwater to discharge in a particular location.
The term lawful point of discharge has no prescribed legal meaning, but it is commonly
used by the industry to refer to a point where the stormwater flow discharge is ’lawful’.
Ensuring a lawful point of discharge exists will be necessary if stormwater discharge has
changed since the development was initially designed. This may not be the case where
the changes to discharge flows are not significant and happen in the natural and ordinary
use of the upstream property.
Where there is doubt as to whether a lawful point of discharge exists it is recommended
that it be sought (through the undertaking of a due diligence assessment and by obtaining
the required consents, approvals and/or tenure) in order to minimise the risk of legal
disputes arising with affected landowners or the local government.
Based on the analyses presented above, the requirement for a lawful point of discharge is
considered to be met by avoiding any increase in stormwater discharge, and allowing any
overland flows to pass across the allotment frontage as sheet flow into the road reserve as it does
in its current, undeveloped state. No formal connection to the piped drainage system, nor kerb
and channel drainage system, is necessary.
IMPERVIOUS AREAS FOR THE PURPOSES OF INFRASTRUCTURE CHARGES
Sunshine Coast Regional Council levies an infrastructure charge on new development to provide
trunk infrastructure. The stormwater network charge is based on the amount of impervious area
on a site, which ensures that the charge is proportional to the stormwater impact created by that
site.
According to Sunshine Coast Regional Council Adopted Infrastructure Charges Resolution (No.
2) 2011 Dated 7 December 2011:
’impervious area means the area of the premises that is impervious to rainfall or overland
flow that results in the discharge of stormwater from the premises.’ (Page 8).
The above analyses demonstrate that the site is effectively pervious to rainfall and overland flow,
and that the development leads to:
. A net reduction in peak flow rates compared with its current pre-developed state.
. A net reduction in runoff volumes compared with its current pre-developed state.
. A net reduction in pollutants compared with its current pre-developed state.
Therefore, based on Council’s definition, the site has zero impervious area for the purposes of
calculating Infrastructure Charges.
Page 7
Bligh Tanner Page 6 of6 Yours faithfully, Alan Hoban Principal Environmental Engineer BLIGH TANNER PTY LTD
Page 8
,
BUSH FIRE MANAGEMENT PLAN
Noosa Flexible Learning Centre
Lot 3 RP887636 / 2 Girraween Court, Sunshine Beach
Client Reference: 002.04.13
~\)SHFIIj
~~~ED\)(..(c;
Bushfire Risk Reducers
ABN 28 355 366 321 TJ 07 46366367
PO 8ox4645 Toowoomba East 4350
F)0746366383 MJ 0438 994465
Page 9
DISCLAIMER
The following report is made on the basis of the assessment undertaken at this location by Bushfire Risk Reducers
in April 2013.
Whilst Bushfire Risk Reducers uses its best endeavors to ensure that the information contained in this report is
valid and comprehensive, the company makes no representations or warranties about its accuracy, reliability,
completeness or suitability for any particular purpose and disclaims all responsibility and all liability (including
without limitation, liability in negligence) for all expenses, losses, damages (including indirect or consequential
damage) and costs which might be incurred as a result of the data being inaccurate or incomplete in any way and
for any reason.
Should the Client have any concerns arising from this report or its content, they are requested to contact Bushfire
Risk Reducers directly.
REPORT AUTHOR
Alistair Hill
Director -
Bushfire Risk Reducers
BSc, Grad Dip Bushfire Planning and Design
FPAA BPAD-A Certified Practitioner
Certification Number: BPD-PA-19034
COPYRIGHT
@ Bushfire Risk Reducers
All rights are reserved.
~\)SHF/~
~,....
t~~ ~eD\)(..~
@
AUSTRALIA
Code of Practice
Compliant
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 2
Page 10
Contents
1.0 Introduction 4
2.0 Site and Development Description 5
2.1 Property Description 5
2.1 Proposed Development 5
2.3 Site Location and Layout 5
3.0 Bushfire Hazard Assessment 6
3.1 Bushfire Hazard Classification 6
3.3 Vegetation Assessment, Slope and Separation Distances from Proposed Development 7
3.4 Fuel Accumulation Assessment 9
4.0 Site Constraints and Environmental Values which may limit mitigation options 12
4.1 Fire History and Frequency 13
5.0 Specific Risk Factors Associated with the Development Proposal 14
5.1 Nature of activities anticipated on site 14
5.2 Numbers of people likely to be present 14
6.0 Nature and Severity of Potential Attack 15
6.1 Bushfire Season and Weather 15
6.2 Anticipated Direction of Bushfire Attack 15
6.3 Anticipated Severity of Attack 17
7.0 Bushfire Protection Measures in Combination 20
7.1 Building Construction and Design 20
7.2 Asset Protection Zones and Landscaping 21
7.3 Access and Egress Management 22
7.4 Water Supplies and Utilities 23
7.5 Fire Fighting and Emergency Management Arrangements 23
8.0 Assessment of Proposal Against The Noosa Plan (2011) 24
9.0 Recommendations 25
10.0 Summary 26
11.0 References 26
Appendix 1 -
Native Species suitable for revegetation works 27
Appendix 2 -
Fire and Evacuation Plan 39
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 3
Page 11
1.0 Introduction
This report has been commissioned by Fulton Trotter Architects to comply with the Decision Notice (MCU
12/0133) and the Noosa Plan (August 2011) issued by the Sunshine Coast Council. The proposal involves
the construction of a small educational facility, the Noosa Flexible Learning Centre (FLC),with approximately
80 students and 10 teachers.
The subject land is classified "Medium Bushfire Hazard", and therefore as "bushfire prone" by the Sunshine
Coast Regional Council
In designated "bushfire prone areas" the Building Code of Australia (BCA)specifies functional performance
requirements relating to bushfire for Class 1, 2 and 3 buildings, and refers to AS3959 2009 (Construction of
-
buildings in bushfire prone areas) as providing deemed to satisfy building solutions. The Noosa FLC involves
Class 9b buildings, and therefore the bushfire related functional performance requirements of the BCA do
not effectively apply. Nevertheless this Standard can be used to guide the construction of resilient buildings,
as aDuty of Care. In other States buildings such as schools, nursing facilities, old age homes and the like are
regarded as Special Fire Protection Purpose buildings, with specific enhanced levels of protection applied for
occupants and emergency services engaged in fire fighting; and in our view it is appropriate that this BMP
,
reflects similar values. The Nbosa Plan Specific Outcome (Table 13.9) 05c requires Education Type 4 uses to
function effectively during and immediately after bushfire events.
This report objectively determines Bushfire Attack Level (BAL)under both methods permitted in AS3959 -
2009, and the associated building construction level is defined.
In addition, this Plan meets the requirements of a Bushfire Management Plan as specified by the Noosa Plan
Part 13, Division 9. In so doing it specifies other precautionary measures to be taken in bushfire risk
management, in relation to construction and maintenance of asset protection zones and landscaping,
access, water supplies and utilities, and emergency management.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 4
Page 12
2.0 Site and Development Description 2.1 Property Description Site 10: Lot 3 RP887636, Parish of Noosa, County of March. Current address of property: 2 Girraween Court, Sunshine Beach, QLD 4567. Local Government Area: Sunshine Coast Regional Council. Total lot area: O.5744ha. GFA Approx 830m2, Site cover approx 2000m2. Proposed development area: GFA Approx 830m2,Site cover approx 2000m2. Zoning: Community Facilities Zone 2.2 Proposed Development The proposal involves the construction of 7 new buildings (Class 9b School Buildings and Class lOb- Amenity Block), arranged around an oval area and linked by a covered hardwood timber walkway. Proposed buildings are elevated on steel posts, timber framed and clad in FC sheet, with roofing based on composite insulation panels. 2.3 Site Location and Layout Figure 1. Broader Area showing proposed development location on subject lot. Situated immediately south of the Eenie Creek Road/ Ben Lexcen Drive intersection, the site is accessed via Ben Lexcen Drive and Giraween Court. To its immediate west is the Noosa Tennis Centre and Noosa Aquatic Centre, and to its south (on the opposite side of Giraween Ct) is Sunshine Beach High School. The Subject Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 5
Page 13
Lot (Lot 3 RP887636) has been subdivided, with Council retaining and managing the residual lot area to
the
east. Council has placed a high value on the retention of vegetation to the east of the Subject Lot with the
result that buildings will be as close as 4m to intact heath land / scrub vegetation.
The site is within 2km (by road) of the nearest Queensland Fire and Rescue Station (Noosa Heads Fire
Station, Langura Street -
west along Eenie Creek Road).
"1 -"
_
Q; .
Jl ’:".
/J~
u
Mi:...~a’’7:’.1
~
...
..
Figure 2. Subject lot and building locations
3.0 Bushfire Hazard Assessment
3.1 Bushfire hazard classification
The Bushfire Hazard Overlay Mapping which accompanied the Noosa Plan (20in whilst ignoring the intact
vegetation on the lot now managed by Council, identifies a section of the Subject Lot as being of
adjacent
"medium bushfire hazard". The use ofthe term "medium" hazard is included along with "high" in the
designation of land as "bushfire prone".
The legislative significance of this mapping relates to the consequence of designating the area "bushfire
prone", requiring specific development outcomes under this Planning Scheme, and potential consideration
(as a Duty of Care) of the Building Code of Australia (BCAL and the application of AS3959-2009 Construction
of buildings in bushfire prone areas.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 6
Page 14
_’_’,
,ol.~it.__~" .-’::r-
~----- ---:::~=:
I:~ ~~).1~~
--._~, fl._
#- "
Pro~d.".8opment
", t,
,,_
. ,I
r!.~’i .,-,-
’.
i’-J~ _J i
f-+. Ii.’
,-: t I
’. I
~.
_:.. -. . , ,:’
j
~.’ .
! ~___’:"r
: "..
~_~~dJ,:,~ _~_.? ’~’i.~~
"
.~=.,-
_.
’
t. ._~
’
,n~aw.’ ~l! ~
el:1’J1
’~""~’--~’:
’.__. --
_
"
~~’=l:.. ~- _
~__:c~-
-
-
r.... -=
tt-~Q1
.
"
.. ’.
,~.~~ -!~~;:?-~".-?’.j::- ......
~.
’
<
’.
,
. -
-
’.. -
_ -_:..Ii
Figure 3. Natural Hazard Management Area (NHMA)mapping (Source:The Noosa Plan 2011)
The hazard classification is a general one, performed as a guide only, for planning purposes and subject to
ground truthing and validation on the basis of more specific local conditions.
It is noted that the subsequent Sunshine Coast Regional Planning Scheme (Overlay Map OVM23E October
-
2012) does not designate the land as bushfire prone.
3.2 Vegetation Assessment, Slope and Separation Distances from Proposed
Development
In the context of AS3959-2009, the predominant vegetation type is "Scrub", both "closed" and "open", due
to the height of vegetation reaching 3 -
4m.The patches of more open dry heath would qualify as
"shrubland" under AS3959-2009, with generally lower fuel accumulation potential.
Effective slope under the fuel zone is flat, however a 2m bank lies east of the proposed "Create" building,
shown in Figure 4, which provides partial radiant heat shielding opportunities,
There is as little as 4m separation between proposed new buildings and intact vegetation. This assessment
serves to determine the required trade off between separation distance and construction level, with and
without the assistance of radiant heat barriers.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 7
Page 15
Fuel assessments were determined using the Overall Fuel Hazard Assessment -
DSE Victoria (Oct 2010).
Despite a general classification as "scrub" under AS3959-2009, there is some variability in vegetation type
and structure on the adjacent lot, and good reason to compare actual fuel accumulation against values
attributed by this Standard. Assessments were undertaken in vegetation areas shown in Figure 4.
"",j,
-
~-
..-.~ 1,-
-~
,,’ ~~l :
,-’
Figure 4. Slope and Fuel Assessment Locations/Areas
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 8
Page 16
3.3 Fuel Accumulation Assessment -
Location 1
Figure 5. Fuel Accumulation Assessment -
location 1.
Bushfire hazard assessment Assessment according to SPP01/03
QFRS NHMA Methodology
Date: 7th April 2013
Characteristic Description Hazard score
Vegetation Wallum heath 6
Slope Plain (0 -
S%) 1
Aspect < S% slope 0
Total hazard score Medium 7
Fuel hazard estimate Assessment according to Hines et al 2010
Date: 7th April 2013 location 1
layer Rating Description / Comments Equivalent fuel load
t/ha
Surface and near surface V. high High to v.high surface litter bed height 20 (open 14 -
18
areas) SOmm (beneath Banksia and
-
Allocasuarina) > 40% cover of heathland
.
shrubby near surface fuels (v.high).
Elevated Very high to Mainly below O.sm, 20 30 % dead
-
5-6
extreme in places
Bark Moderate Banksia and Allocasuarina 1
Overall rating V High 20 -
2St/ha
Table 1. Fuel Assessment location 1
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 9
Page 17
Table 1 (top part) validates Council’s "medium" bushfire hazard classification.
Fuel has now reaccumulated to very high levels since the last fire, at least 20 years ago. The highest fuel
accumulation occurs with increasingly closed heath, where Banksia aemula predominates; however these
areas are broken up by more open heath and fragmentation provided by pathways.
In order to provide an average available fuel load in the eastern vegetation zone, consideration was also
taken of Allocasuarina dominated areas (Location 2), and open patches of introduced grasses.
3.4 Fuel Accumulation Assessment -
Location 2
Figure 6. Fuel Accumulation Assessment -
Location 2.
Fuel hazard estimate Assessment according to Hines et al 2010
Date: 7th April 2013 location 2
layer Rating Description f Comments Equivalent fuel load
tfha
Surface and near surface High Surface litter bed height to 40mm .
Little near 12 -14
surface fuel.... suppressed by needle layer.
Sphagneticola trilobata (Singapore Daisy) edge
effect -
fire retardant weed.
Elevated Moderate -
High Suppressed recruiters 2
Bark Moderate Allocasuarina sp. 1
Overall rating High 15 -17 tfha
Table 2. Fuel Assessment location 2
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 10
Page 18
Compared to Location 1, less fuel has reaccumulated since the same fire passed through the area, and the
majority of available fuel is on the ground, with fuel arrangement diminishing likely fire behaviour.
3.5 Fuel Accumulation Assessment -
Location 3
Figure 7. Fuel Accumulation Assessment -
Location 3.
A significant proportion of the fuel adjacent to the eastern boundary is open patches of grasses (Panicum
sp, Paspalum sp, Cynodon sp, Chloris sp, Rhyncheletrum sp with patches of Singapore Daisy).
The effect of these areas on overall fire behaviour would depend on grass height and degree of curing, but
with the partial wind sheltering effect of the 3 -
4m vegetation, they would generally be expected to
moderate fire intensity close to the interface with the proposed development.
The grassy area, together with the 2m embankment (dropping down 2m to the east) can be seen as
assisting the exposure of the interface with the proposed development. The addition of a non -
combustible
barrier at the interface would prevent the passage of a fire front, leaving only radiant heat and embers
passing above the radiant heat barrier.
Averaging the effect of fuel accumulation in Locations 1, 2 and 3, it is considered reasonable to use a value
of 20t/ha total fuel availability for intact fuel areas shown in Figure 4 (15t/ha of which is surface/near
surface fuel) for the purposes of fire modelling in Section 6 of this assessment.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 11
Page 19
4.0 Site constraints and environmental values which may limit
mitigation options
"
,
I
~J
Vegetation Management Act Regiona1 Ecosystem and Remnant Map-Version 6.1
c::J RI<""",nt ""II"’.’....,l;~<)ta’"’ng .M.."’l~IM .BaSed on 2.006 landsill 1M .magery
I\."’I’D"" <;I. D~~.,,~"" R<<>"..1>’d !,Iy’ AHllUi’!lUSIIRRfi I,!.I~
c:J Rt.. .""",~!tct,.,tlOO o ..t.JIMII’1 of ~U1 1M"’" Ol.....IJ T’Mo! 1059 U
rC’QIo.~ Q>y.lll...
Centered on lot 011 PI""
L::l FkmI’lilN ""II"Llt_ ’M!’".11~,}<.1 _.<:I:n l’ll’U7 U!
’’’(IIM,..! C<’~,)’;it.:ift
bllf>.’"lf’ ~tll~IMOlirlf’~ft~
"’!’d11l,""tI.;t,iI".!!1 m"J,l’s.;CblJ’I 20AH Dr t.,., vlA.A
c::J N’ "",lJ1<l(
.,
o 1’I."’l.IIOJ; Iil’~’f
Figure 8. Regional Ecosystem (RE)Mapping. Version 6
Whilst the Department of Environment and Heritage Protection (DEHP)do not map remnant vegetation or
significant Regional Ecosystems on the subject land, the vegetation generally conforms to RE12.2.13,
mapped a short distance to the west.
The Noosa Plan has Mapped the area as Koala Habitat Area (although it is an isolate without koala food
trees), with no areas of Environmental Protection of Environmental Enhancement mapped.
DEHP provides the following vegetation description, comments and fire regime guidelines.
12.2.13 Description:
Open or dry heath. Characteristic shrubs include stunted Banksia aemula and AI/ocasuarina littoralis as well
as Xanthorrhoea johnsonii, Leptospermum semibaccatum, Phebalium woombye, Oil/wynia retorta
and
Caustis recurvata. Occurs on Pleistocene dunes.
OPTIMAL FIRE SEASON: Late summer to winter. INTENSITY: Moderate. INTERVAL: 8-15 years. STRATEGY:
Aim for a burn mosaic of 40-60%. Do not re-light areas remaining unburnt after a planned burn. Burn in
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 12
Page 20
association with surrounding ecosystems. ISSUES: Often contains obligate seed regenerating species and as
such, the application of frequent fire may reduce species richness if the intervals between fire are not
sufficient for plants to produce seed. Too frequent a fire frequency may result in a net loss of nutrients over
time from an already nutrient poor system. Spring burns (traditionally used in SEQ ecosystems) have an
associated risk due to changing weather conditions post-burn. The fire interval recommendation provides a
guide to burning frequency and should be adjusted according to the ’reading of country’ and observed
ecosystem health in relation to fire.
4.1 Fire History and Frequency
..," ..
;::;
Figure 8. Evidence of previous fire.
Evidence of previous fire in the area (at least 15 20 years ago) can be seen throughout the area in various
-
forms, however the last fire in the area was many years ago, judging from the:
1. Lichen development on old charred stumps.
2. Wound healing around the bases of B.aemula.
3. High level of fuel now accumulated.
4. More than one generation of Allocasuarina littoralis. With upright dead material yet to be burnt
(Lunt,1998).
This evidence suggests fire at least 15 -
20 years ago or more, which is beyond the upper end of the
desirable fire interval for this vegetation community.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 13
Page 21
The vegetation community clearly has an ecological need for fire, for conservation reasons. Safety considerations would also advocate the use offire in prescribed hazard-reduction burns. However the limited size of the area, absence of clear fire lines around the entire perimeter and other (higher)priorities for Council parks resources are likely to prevent routine controlled burns. The next fire is therefore likely to be an unplanned fire, with potential intensity dependant on prevailing fire weather conditions at the time. 5.0 Specific risk factors associated with the development proposal 5.1 Nature of activities anticipated on site The Noosa Plan requires Education Type 4 uses to function effectively during and immediately after bushfire events. In NSW such developments are treated as Special Fire Protection Purpose Developments and an elevated level of bushfire planning and design is specifically applied. Whilst Queensland planning requirements are less specific in this regard, it is suggested that Planning for bushfire protection (NSW RFS, 2006) provides appropriate guidance for planners. This includes such specific measures as radiant heat levels not to be experienced above 10kW/m2 by emergency services workers during worst case scenarios, and additional emphasis being placed on Asset Protection Zones, Fuel Monitoring and Management Programs, and Emergency Management. The Noosa FLC buildings include an administration/support facility and dining facility with covered deck, separate buildings devoted to sound, creating, knowledge, and quiet retreat, with a separate amenities building. No storage or handling of hazardous materials in bulk is envisaged. 5.2 Numbers of people likely to be present The proposed Noosa FLC will provide education facilities for approximately 80 pupils and 10 staff. During the daytime (when wildfire outbreaks are most likely) approximately 90 people may be expected to be at the complex, a substantially smaller number than associated with most standard schools. This translates to relatively greater ease of evacuation if and when required. Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 14
Page 22
6.0 Nature and Severity of Potential Bushfire Attack
6.1 Bushfire season and Fire Weather
The "typical fire season" in this area peaks between September and November. The predominant winds in
the area are south easterly, however during the fire season, hot gusty westerly winds of over 30 kph can be
expected, with Relative Humidity (RH)falling to under15%. Temperatures on these days can climb over
350(, and for two or three days a year, fire weather conditions equivalent to FDllevels of around 70 can be
anticipated. (Note that this is in contrast to the value of 40 which QFRS are currently using in the recently
revised AS3959 2009, although they have indicated an intent to review and change this value).
-
’,’ ,-,.. f,._,
’~_r-_J ’,f’.l’l
~r. T’~
’
~,?~ Lt.} ,,~~/..
_
:-f ...__
2,f
?i’ ( -~r1
I
~_~/-~ ; ;r.
r ~:>
~
.~"’,
-
~
I I i
~J -- -~( ’-"’:-"\
-
-
l
-1-’
i ~.-:-
~.. (’r~:"(’.- ’\
1 -
r~
r/J
It~
.
....1
~." ’)
;~_ r(’’’ ~t-J ~
)~.
,
L ~__ __ _ (j
IJ’
r . ~\.:" ............ r.~~~:’JI(
M...r~ ""
,)j --
}- (
r~~j _..
". __\,_. f
I ~~
~ ; -
~..:;...;, I
-
~~.~
~
~f:~~:Lj- Y’-~
-
.
_. r
.
L~
,}
t
I
+-
-~;.;;;;~.
r..J~. -’..!’ ,-.’
:. ore ._
Jt ..pf’.:
~~.._ -
....
~.
F’FDI
o ...........---
...- Oraft FFOI for ....40 ..--
~==tt1"tl:Z.r=:::....
A.S3959-2009 Research :’!W5(J
-~- _70
~
--
Figure 9. QFRS indications of a revision of "worst case" FDI values to FDI 70 for the area involved.
Given that the subject site is so to the coast with RH influences, and the fuel zone lies to its east (not
exacerbated by W/NW winds) it could be argued that the current value of FDI40 can be used for fire
modelling on the site.
6.2 Anticipated direction of bushfire attack
Unplanned "wildfire" attack could potentially come from the adjacent lot to the east, as a result of
accidental ignition or arson.
The area of intact fuel is limited and potential fire run lengths are restricted to less than GOm. As a
consequence unplanned fire would not achieve its full potential intensity possible for the fuel type present,
and from guidelines that have been used in NSW, a factor of 0.5 (50%of potential intensity) can be used.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 15
Page 23
,
I
J’
~,-’--( ~~
-~~
,i.:;::iii
ill.;:’-- ~~
Figure 10.Anticipated main directions of attack (Ember attack shown as dotted arrows).
Figure 10 above, shows the most likely attack to come from the east.
Bushfire attack comes in a number of forms: direct flame, radiant heat, embers, smoke and wind. Research
shows that over 80% of houses lost to bushfire in Australia can be attributed to ember attack, within 100m
of bushland.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 16
Page 24
Ignition of bu dlng.
by burning embers
and debrl. ...rrl.d by
the wind
Ignition 01 buildings
by h.at radlltlon
from thl fire
Ignitlon of bu dlngs by
dirtct tt.me contact
I,
Figure 11. Main Bushfire Attack mechanisms (Image courtesy of Ramsay & Rudolf, 2003)
6.3 Anticipated severity of bushfire attack
The fuel accumulation values used in this assessment are derived from the estimated values from Section 3
of this report. These values can be less than those attributed to "forest" in AS3959-2009.
Fire Scenario -
East FDI40 Method 1 AS39S9 -
ZOO9 FDI40
Method Z AS39S9-ZOO9 Scrub
Scrub @1S/ZOt/ha.Au Slope under vegetation Flat Flat
Flame width 30m.ROS over-ridden to SO% of maximum.
Fire Intensity (Byram,1959)
15500kW/m
Rate of Spread (Noble et ai, 1980)
2kph
Flame Height (modified Mc Arthur V equation, NSW RFS
2001) 6.56m
Flame Width 30m
Elevation of Receiver 2.4m
Radiant Heat generated BAL FZ within <10m of intact unmanaged
(View Factor Method see
-
graph below) vegetation
BAL 40 from 10 -
<13m
BAL 29 from 13 -
<19m
BAL 19 from 19 -
<27m
BAL 12.5 from 27 -
<100m
Table 3. Calculated values for potential bushfire characteristics, and methods used.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 17
Page 25
Potential Radiant Heat Flux
80
70
60
SO
1 Scrub Frat fDI40
N
E:
......
$ 40 limit-of BAl-40 Construction AS 3959-2DD9
x
lL
:x:.
a:: 30
20
_ _ _ _ _ _ ~ _ _ _ _ _ _ _ _ _
limitofBAL-12.5Construction
10
.0
45/:, ’]5
o 20 30 40 50 ,60
1!1 i
D stanoe from unmanagedvegetation,(metres)
t i Amenity
!
Knowledge I Create
!
Retreat
-"
Figure 12. Potential Radiant Heat Flux. (Source:View Factor Model, AS3959-2009)
Figure 12 is from fire modelled (estimated)calculations, based on fire weather conditions equivalent to a
Fire Danger Index of 40, and depicts a scenario where fuels have accumulated to their likely demonstrated
potential extent. The significance of these radiant heat flux levels is shown below in Table 4.
Figure 12 shows that site specific modelling (Method 2) has predicted significantly lower BAL values for the
buildings on this site than under Method 1 of AS3959-2009. A proposed non combustible radiant heat
barrier to a minimum 1.8m further reduces radiant heat exposure (green curve in Figure 12).
Based on the available setback, if AS3959-2009 was to be applied to these (Class 9b) buildings, the exposed
faces ofthe:
. Knowledge building would require BAL 40 construction.
. Retreat and Create buildings would require BAL 29 construction.
. Amenity building would require BAL 19 construction.
. Other buildings would require BAL 12.5 construction.
. (the shielded faces of buildings would be constructed to one BAL level lower, with the
exception of BAL 12.5 buildings, the whole of which should be constructed to BAL 12.5).
The 10kW/m2limit used in NSW for Special Fire Protection Purpose developments, can only be guaranteed
in areas more than 12.5m from intact vegetation, but so long as landscaping and construction on the
subject site do not lead to ignition on the site itself, most ofthe site would fall below 10kW/m2 radiant heat
exposure.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 18
Page 26
If available fuel is allowed to accumulate on the subject site, boardwalks and buildings could be impacted,
potentially leading to structural fire, and the loss of buildings. Landscaping is thus an important determinant
of whether buildings on site may be used as a viable local refuge point in the event of unplanned fire on the
adjacent eastern lot (Discussed in Section 7.5 -
Fire Fighting and Emergency Management Arrangements).
Figure 12 can be used out of a Duty of Care, to assess the tradeoffs between setback and appropriate
construction level, in order to give buildings a "fighting chance" of survival.
Radiant Hat Flux (kw/mZ) Uhly Effects
> 40 -
110 Flame Zone. Even the strongest toughened glass fails.
Latest technology in toughened glass may survive. Most will not. Tim ber ignites without pilot flame. Limit
29 -40 of BAL-40 Construction AS3959 -
2009.
Ignition of timbers witho ut piloted ignition (3 minutes exposure) during the passage of a bu shfire. Most
29 types of to ughened glass could fail. Limit of BAL-29 Construction AS3959 -
2009.
Screened float glass could fail during the passage of a bushfire.Limit of BAL-19 Construction AS3959-
19 2009.
Standard float glass could fail durin!! the passage of a bushfire. Lim it of BAL-12.5 Construction AS3959-
12.5 2009. Som e timbers can ignite with prolonged exposure and with pilot ignition sources leg embers)
Critical conditions. Firefighters not expected to operate in these conditions. Considered life threatening in
under a minute in protective equipment. Fabrics inside a building could ignite spontaneously with long
10 exposures.
7 Likely fatal to unprote cted persons afte r exposure of several minutes.
4.7 Extreme conditions. Finefighter in protective dothine;will feel pain after 60 seconds exposure.
3 Haz ardous conditions. Firefighters expected to 0perate for a short period (10 minutes).
2.1 Unprotected person will feel pain after 1 minute exposure -
non fatal.
i
Table 4. Significance of various RHF levels (Source: NSW RFS, 2006)
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 19
Page 27
7.0 Bushfire Protection Measures in Combination
"
Figure 13. Bushfire Planning Measures in Combination (Source: NSW RFS, 2006)
Figure 13, taken from Planning for Bushfire Protection (NSW Rural Fire Service, 2006) illustrates that there
are other factors and measures which need to be integrated to mutually support one another to provide
protection against bushfire.
Simply removing the hazard (bushland)is one possible way of removing risk to life and property, but this
approach is hardly desirable. The safety of life and property can be achieved whilst retaining the natural
amenity and value of bushland areas, provided these integrated bushfire protection measures are applied.
7.1 Building Construction and Design
Although not required under the BCA, construction of new buildings to the standard that would be required
of a Class 1, 2 or 3 building will reduce the likelihood of building loss to bushfire, and hence allow the
building and school to resume normal functionality immediately after bush fire.
Because of the limited setback available, if AS3959-2009 was to be applied to these (Class 9b) buildings, the
exposed faces of the:
. Knowledge building would require BAL 40 construction on its exposed eastern face and BAL
29 on shielded faces.
. Retreat and Create buildings would require BAL 29 construction on exposed faces and BAL
19 on shielded faces.
. Amenity building would require BAL 19 construction on exposed faces.
. Other buildings would require BAL 12.5 construction.
. (the shielded faces of buildings would be constructed to one BAL level lower, with the
exception of BAL 12.5 buildings, the whole of which should be constructed to BAL 12.5).
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 20
Page 28
7.2 Asset Protection Zones and Landscaping
Components of an Asset Protection Zone hazard
Inner protection area
~ I
Figure 14. Components of an Asset Protection Zone (APZ)
Asset protection zones are the most strategically valuable defence against radiant heat and flame, and to a
lesser extent embers.
The landscaping plan shall include the establishment and maintenance of an "Inner Protection Area" (IPA)of
a minimum of 10m out from any buildings, and maintained free of available fuel. Some landscaping plants
may be used in this area so long as they are selected for their low combustibility, by virtue of high moisture
content, low volatile oil content, high leaf mineral levels, large fleshy leaves, absence of shedding bark. They
should be placed so as to not provide either vertical or horizontal connectedness of plant material, or
contact with flammable parts of buildings.
An Outer Protection Area involves removal of the understorey so as to deprive an advancing firefront of its
fuel continuity, and thereby collapsing the fire front. In this case, we are recommending that the entire
subject lot is managed as an IPA.
The retention of plants identified in Drawings Number 12-186 LP-01 and LP-02 of the Vegetation
Management Plan (required by Council under Decision Notice MCU 12/0133) potentially risk creation of fuel
pockets close to flammable structures and parts of buildings. In order to mitigate this risk, it is
recommended that:
1. Non combustible mulches are used in landscaping.
2. Where native vegetative species are used, they should be selected from Appendix 1 (Native plants
of lesser combustibility) and be of species/ age that will rapidly reach around 3m in height, which
can be hedge trimmed, with dense foliage. Acmena spp and Syzigium spp provide a range of good
options. They serve to separate retained natives, and dampen or subdue potential fire behaviour.
3. Leaf litter should not be allowed to accumulate at ground level, and should be raked up from
gardens/under boardwalks and buildings and should be removed from site, particularly during the
fire season (August to February).
Radiant heat barriers (either man such as non combustible/colorbond or of low combustibility/fire
retardant vegetation) should be incorporated into APZ design as shown in Figure 15, to further reduce
exposure of buildings to radiant heat. Vegetative barriers can potentially become involved in fire if they are
permitted to dry out, and a key requirement (if the vegetative option is used) is to ensure that vegetation is
well watered and not suffering moisture stress, particularly throughout the fire season. The non
combustible option is recommended.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 21
Page 29
-)(~" --.,.,.
.
I .~.~ I",
,,’"
t
I’~!. t .~, :-,.....
t: :. ’: .~:~
.
. .
I
I’! .
.
l .
~-
~~’~~"
Figure 15. Radiant Heat Barrier to lessen BAl exposure
7.3 Access and Egress Management
The site is within 2km (by road) of the nearest Queensland Fire and Rescue Station (Noosa Heads Fire
Station, langura Street -
west along Eenie Creek Road).
Access/egress is restricted to the route provided by Giraween Court. Adequate turning space will exist in
Giraween Court and the FlC carpark, for emergency services vehicles.
Egress from the FlC precinct (in the event of structural fire or wildfire) is readily achieved along the footpath
heading west along the northern side of Giraween Court. The Noosa Aquatic Centre provides a large and
safe marshalling point, with expansive car park facilities, reached within 200m and without crossing any
roads. It is recommended that FlC Administrator engages the Noosa Aquatic Centre management in
discussions to plan an Assembly Area in anticipation of potential egress from the FlC site.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 22
Page 30
7.4 Water Supplies and Utilities
Emergency Services access to fire fighting water shall be provided by a hydrant installed at the western side
of the carpark, in accordance with AS2419.1-200S. Standard garden hose cocks and hoses (12mm)shall be
available on the exterior face of each building.
If gas supplies for the purposes of cooking are required in the proposed facility, and its installation and
maintenance shall be fully compliant with AS1S96 -
2002.
7.5 Fire Fighting and Emergency Management Arrangements
Hospitals, aged care facilities, mental health units and other similarly sensitive facilities, require special
measures for protection against wildfire; hence the use of the term "Special Fire Protection Purpose
Developments", as these developments are referred to in NSW and Victoria. Important elements for
bushfire management planning include provision of additional APZ area (so that emergency services staff
defending the facility, hospital staff and patients cannot be exposed to life threatening radiant heat levels)
and additional emphasis on Fire Fighting aDd Emergency Management.
The proposed new buildings are designed to withstand bushfire attack, and to provide a safe place of
refuge for occupants present at the time, however where time allows, the preference is for occupants to
relocate to the Noosa Aquatic Centre. An Emergency Response and Evacuation Plan for the FLC shall be
implemented by the FLC Administrator with Appendix 2 providing an initial template.
Preparedness for unplanned fire can be ramped up in direct response to forecasts of increasingly severe fire
weather conditions. The potential intensity of wildfire is directly proportional to the severity of fire weather,
which is expressed as the "Fire Danger Rating". This rating corresponds to certain Fire Danger Index (FDI)
values, as shown in Figure 16 below:
Figure 16 Fire Danger Rating and corresponding FDI values
-
QFRS communicates total fire ban days on ABC radio, and also publishes a four day forecast the FORI FDI on
a district basis, on the Rural Operations website at the following URL:
http://www.ruralfire.qld.gov.au/FDRG.html
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 23
Page 31
If Severe or Extreme fire weather conditions are forecast the FLC Administrator should ensure that:
1. the grounds are rechecked for tidiness and freedom from leaf litter and other fine available fuel.
2. the current Student List (and daily Absentee List) are ready on hand to be taken with staff and
students if an evacuation is required.
3. fire drills have been practised recently (in the past 6 mths). If not, it is recommended that a practice
fire drill is conducted, testing
a. "sheltering-in-place" (for adjacent bushfire, with insufficient time to evacuate),
b. evacuating to the Assembly Area at Noosa Aquatic Centre, roll calls, communication (with
fire authorities and reassuring concerned parents), receiving the "all clear" and returning to
site.
c. operating fire hose reels to extinguish small local/spot fires.
External "Assembly Areas" that are used for structural fire or bushfire should be at a sufficient distance to
avoid respiratory and other hazards. The Noosa Aquatic Centre is considered to be an appropriate Assembly
Area for fire within or adjacent to the FLC.
8.0 Assessment of proposal against The Noosa Plan (2011)
Performance Criteria /Specific Probable / Acceptable Solutions
Outcome
8.1 (04)The proposed use does not The use is sited on land that is determined as medium risk,
compromise the safety of people however mitigation measures outlined in this BMP are applied.
and property from bushfire.
8.2 (05)Community Uses, including Solution SS.3 is applied in that uses Incorporate several bushfire
Education Type 4 uses, are able to protection measures in combination, designed to enable
function effectively during and functionality during and immediately after bushfire events.
immediately after bushfire events.
8.3 (06)Public safety and the Solution 6.1 is applied in that hazardous materials are not
environment are not adversely manufactured or stored in bulk on the site.
affected by the detrimental impacts
of bushfire on hazardous materials
manufactured or stored in bulk.
8.4 (07)Uses and works are sited, Solution S7.1 is applied in that use is made of the existing grassy
designed and constructed to -
area adjacent to the "Create" building. Whilst setback from the
a) minimise the number of people property boundary is less than 10m, a non combustible radiant
and property subject to bushfire heat barrier shall be constructed to reduce BAL exposure and
risk; and complement construction levels, asset protection zone (IPA on
b) maximise the protection of site) and landscaping.
people and property during the
passage of a fire front.
8.5 (08)An adequate water supply The use is in an municipal water service area and access to
is provided for fire fighting hydrant supply points shall be available in accordance with
purposes. AS2419.1-200S.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 24
Page 32
8.6 (09/011)Firebreaks and fire The limited site area (0.5744ha)does not allow for or warrant this
access tracks infrastructure.
8.7 (012)Road network provides for Solutions S12.1 and 12.2 are applied through the existing road
safe and effective evacuation of infrastructure (Giraween Street) and a safe egress route is
users of premises and access by available to the Noosa Aquatic Centre in the event of evacuation.
Emergency services. Access for Emergency services across the subject site shall not be
impeded by obstacles including landscaping.
9.0 Recommendations
1. The proposed development shall have hydrants fully installed in accordance with AS2419.1-2005.
2. The Fire and Evacuation Plan for the Noosa FLC shall be implemented and practiced every 6 months,
or as a minimum, prior to the fire season each year (July/August). The Plan shall be reviewed at a
maximum interval of 5yrs, for efficacy and practicability.
3. A non combustible solid fence (eg.Colorbond) shall be constructed along the northern and eastern
boundaries of the property, to a height of L8m,to serve primarily as a radiant heat barrier.
4. An Asset Protection Zone of the entire subject lot, shall be established and maintained as an IPA, in
accordance with Section 7.2 of this report.
5. It is recommended that the consideration be given to constructing the proposed buildings as if they
were Class 1,2 or 3 buildings under the BCA/ AS3959-2009. For the most exposed building, this
translates to BAL 40 construction on the exposed eastern face of the building, and BAL 29 on the
protected faces of the buildings. Section 6.3 of this report provides BAL guidance for other proposed
buildings. Builders shall warrant that they have a copy of this Standard, and that it shall be used
consistently throughout the design and construction of any residential building.
6. It is recommended that when installed, air conditioners for the Support and Create buildings are
able to draw air from inside the building, assisting their function if air outside is contaminated with
smoke and toxins.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 25
Page 33
10.0 Summary
The proposed development places vulnerable people and important local infrastructure within close
proximity to potential wild fire. Ecological and conservation values present constraints to the separation
that is available between the fuel zone and vulnerable assets.
This report recommends measures that can be taken in the design and construction of the APZ and the
construction of buildings and radiant heat barriers to reduce the exposure of life and property and increase
their resilience.
Regular review of the Schools’ Emergency Management Plan (in particular the Fire and Evacuation Plan) is
crucial.
Provisions for access/egress and water supplies are addressed for potential use by emergency services.
This Plan demonstrates compliance with State Planning Policy 01/03 (Mitigating the Adverse Impacts of
Flood, Bushfire and Landslide), the Noosa Plan 2011, the Building Code of Australia and AS3959 -
2009
(Construction of buildings in bushfire prone areas. This Plan is consistent with the Sustainable Planning Act
(2009),the Vegetation Management Act (1999)and the Fire and Rescue Service Act (1990).
11.0 References
ABCB (2012),Building Code ofAustralia, Australian Building Codes Board, Canberra.
Building Fire Safety Regulation (2008),Queensland Government, Queensland.
Environmental Protection Act (1994),Queensland Government, Queensland.
Fire and Rescue Service Act (1990),Queensland Government, Queensland.
Queensland Government Department of Local Government and Plannfng (May 2003), State Planning Policy 01/03, Queensland.
Lunt, I. D. (1998),Allocasuarina (Casuarinaceae)invasion of an unburnt coastal woodland at Ocean Grove, Victoria: structural
changes, 1971-1996. Australian Journal of Botany 46:649-56.
NSW Rural Fire Service (2006),Planning for Bushfire Protection, NSW.
Ramsay, C. and Rudolph, L.. (2003),Landscape and Building Design for Bushfire Areas, CSIRO Publishing, Collingwood, Victoria.
Standards Australia (2005),AS 2419.1- 2005, Fire hydrant installations System design, installation and commissioning, Sydney,
-
NSW.
Standards Australia (2002),AS 1596 The storage and handling of LP Gas, Sydney, NSW.
Standards Australia (2002),AS 3745 Emergency control organization and procedures for buildings, structures and workplaces,
Sydney, NSW.
Standards Australia (2009),AS 3959 2009, Construction of buildings in bushfire-prone areas, Sydney, NSW.
-
Sustainable Planning Act (2009),Queensland Government, Queensland.
Vegetation Management Act (1999),Queensland Government, Queensland.
Webster, J. (2000),The Complete Bushfire Safety Book, Random House Australia, NSW.
Workplace Health and Safety Act (1995),Queensland Government, Queensland.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 26
Page 34
Appendix 1 Native Species suitable for
-
revegetation works.
Source: Bowden, J. (1999)Living with the environment in the Pine Rivers Shire, Pine Rivers Shire Council,
Queensland.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 27
Page 35
So
S. s.
S.
Oa
Wt.f ~.1;t $,
.$.1
fln
S,
0.’
Pt
Contlenl Op SA s.
U. .S,J. U"S. 1I, U~ lJ, S.~
U,.
OIlS.
0. o. SJ S.
()> U. U. Us U$ U.
:;., S3 So 50 50 So S" U& U~S;r. 0.. 1I$ 0- U.S, U.. 0" III 1I,
So ~ u
U, tI~
ROI.rdnc.
Fit. lm 1m Lrn ,I.J" ILrn IJIl
SI
t.m tm ..... un lm lm I,n 1m l.m u" 1.<11 1m Lon In. 1m !.I"Sl 1m LJu IJI’ II.. 1m I". tn’, lm Lou
"ETA-RONl
F
Form flOe liCe HOe HOe 1.ICe V II fI II II II 1-1 cO cO c() cO cO cO c() V V ...1 V II H f’ H H Ii H II
\Veo!I RuiJl Ru~h \Iftt Ru$l
rtte
Ilcny
hid
Iybrid Vi l ey Orchid d
Ikny Lilyng
ril tl
R. ,h Mltl Muj Mal
SruLlr:
Com nN Aneslcr lScurvy" Sn~\ -d Uu&" Natio,-c BulbineUly uol’ALilByI C’l: <Uy R.’ -’IyOt;’"(\C u.>lLoIy SpolI(tO NUlurnl yorU.c Orclud l’c, IOtdi KingOrclud Untl!SdJ)ldc,.Orh \VOJ1\OJ &:r-.unhl F~tUO\Ilh SwcetS.usp: Rtt~C",tMI".,JOgle ( Fine-ta J\t~n)f.Och\’e Ru,h
YUIU
dcmlt J
l
\1:.01
M:II M
II
url :I
n~r
\Vikl(i Nutive:Onscr
IName J(’latfd\~i’1e InjloYrlm ’Jar/I’d tris’kl/ mUf.’rQ{JIvUu IrtW.nyr$(l "r;~I’ipNltwuf{ Imlxi.~, ct)qJj(U rt:mJlt /1t()Ntl (;’il"~tfjr gm(’ltm .r(wt"iuf, IJlf’ /iJlritmftnrc;(l’!?lim IUJifolJ C)’I~U" 1(l’JIX.",q~U1 xl.rom(ytJnfl!riql., Ir’v~trl, jiJfoml v til1d,;fum l/wrl(, (",U/fltu rl(mra
(...)
(-)
(..) iSlrJld Jp.ylu t ),fum ,
l:Ul lr J;r X IfI j:i/t"
Sclenifc COl nl"i,"tnri Alfil’I Comnlt.I PlJ/li1 Pul la Ojoscmrt’~l!l)1’bCOr(IJ til!(’f{l Qulhifl D/aml/u OluH"fla Dl trJld DrymQP"’(1 Tflj LJflt ()lf ro/O}lt"lJ’i\hid: Dt’If TlJiw" ’DhtlnJ " 41, ) Dc!/l ruh 1l Or-nt/olium DmdrH!’biUlmfS ca(’ Ek.ftU/,I1-X GdWtN,J/}r;smn IJtli)’ rncwt Pl /yclTfUJI Sl1Ii:tCf .’lI Sml/ml )rh~C’{>n( mlfI(./mrlda/fm Lin’lt m ’",I/m l,Qtmfl Ult I.l’u 2inglbetC."9 ."’1in p,’" ,
la
~k o tlle
tI
rol,JI.1I
I’/f
()/’n (D. X
Ii
~,.
f~
hut hf1l1~
()rec,dIJHn~
boHl (!, I~f S. S~ 0"
S:l
S. S:a S:.
SII Su
0.. 0;1 S,.
U,Sa SaUs S.lJ> USS. U\SI
Jea’id :ut: ~ Jill
()c: c.ments Us Us U. Us Us Us Us Us Us
wl1dbr’.Ji~6uitble n3te5!
n
d:
Qp
:=$UCI~1 (
G r o u n d C ( ’ l V ; c O : . p y h i Heln.", Sl sa:
If)
tlit’ .
v"S! Loll
Plants
S, lIt1 l.. 1.111 1m till l.n, u. till Lo. Loll W, lnl
cOlUcol: 3lfdhint r’UfI itlY4!1iv
0..
ed
FIn!
SHa
saiL table:al txInicr. 1’l"Ol pruvec.l
Native Form SSS SS S II II 11 Jj II V H P
APENDICS ~10 ofwl’Kbcak/ire Ni
10
Ge.: :
due
St
’:
,u
==
er.M 5Uil:be
if not
b4l 1.u Gardens umwDflg ncaj>plc:.
)
Uty Pnhn PI
Retardnt ~tre.’!li warcomnls, lIrMJeslO)’ Smal ComnN.8e Pi~plc’.tm O"td.lc:,f’m>y fl\it."m $kndcrl’fnt RivcrU1t nril5),GUly CUJljcvo1Sc"I<:~A, Slinking Walkins
Herb; F’
.
b.1J1 Pf.
Must:;
Val ey
l in~ MUly
WI)’ Slick. I
tNYIROMST
l
Rivcrs for
fnrwiodb’C!\t/u periOth Plants I’olh )~
1;0:;
1
St Witl P R S
Vifti!; kM rJC:l1 Pil e
Fire V;;; tP to
(or
Wt. ~ lit
"r’:iTre; r-tm;
U ~ =
due
s u i l lubte
$hd:re
le
perb[f._ck)’ilnu Im’l,/i Pt’qfuriJ IJct".lifoU p’r’,/UflmItc~(hnJmi brl.ffimN.’Jtp}\I~’lh brtJwli, nlJW.!wthya
dry hl’rJI )’ /IJ
(.,
H
CPYI,hyltc
5hmb;
S
-=
fs.lo:u!
Lm;:
speCtc;:f Mlit blc
cr.
w
-=
\\tb
G V ~ b " O S I ’ E
flUtin
n~
( M
rQt
Sa. winu:,.
in
in
’k’
u
M O N C T Y U ’ J 0 1 S /"r
tlmgrp.-x
~: ~, : Fire-Rtadn Scl.IiNm. 1.mn;:IC’iul! l.J:pit1o.am MlJ(’rq;amlt ;\ga’I(.L:H! ClmJ)’f1t" Cord\’lmr Cwd)’ltr’ ;\ln",)ituc:_e OilQTmrcf’(l/pr\,f A/ur.n’tlG)",nu:.(mh)’1 1)’/lhi’m U
Oow.:r
oc: or
ItOl
m;,y
(..)
u
:mnlil
MIl(Il
mhm f’nt: r
Cr
mmt r:I(."t:JC P()Ilw,{
tmf (’).il.l
SlHdir
Artcit 1}1l
2
Page 36
154
lI
e TJl C
Cop ns Cop rUl Cop nceao 1.0<10 P_., 8" . $< _ Io#andt’i " ’ u m A
/ l K t
: r
1 I
i ou ’ l p PDI"f)tJ.UI ParlOnSi4 OtIr
/ 1 _ JI/yxIa lIydr C~1W 1o ApIa M PMudlr
lIV NQ .nb<’1I"’ ~".mis, Cal5pI_ P-flo,_
Ja
I1’f_u A~ ^ri>OoIcha. Tabtrl’W.w",oM IJanu _<I o",w’,<V#olai" ^- lIytfmc>o. (i’lIpmry",Psodtrmflw!IU n,lI’trf Groptcil)_ A. ,_ CatpWOIUS A_1)I(;Jn’UlONS ~
c a q l IQ
su
l.
WITH
fH’ SDf7nt_,’Ol _or", ,rudlu In,_.Jh (.)
juJmNldu p".iculoJ 1",.lob
tl/
pnI’ft()SI" ’,a Il", atD ,._,;!-) ptdie<l_ 1k0 lob ,wIablJ,. u!tdhmsplni, " <als", "._".
<p.
<Iff (.)
rG/
FNYt"OlHf Bower Newsp. Cori<y \line Pipe D<I
IWmond _Bush Nmow Southern MIJtbu.<It CUtl"e1’ OwnrNit Ptn)’WOl1 Pwn)’WOrI Pwnyort l.uYe"1owa’ Samfonl Scwkt PlaF" Conv H.
(.)
PINE
IN
S".mbhn,Cspcr N."eCspcr 1’omutc.bb<:1J Silu:rCas or
Beaul)’ PUleR Thin-!tafl)" S_Mil.V
\t,1k
V.,.
W u F l o w e r 8
V. .
5.,kpod Ic;d’Stlkpod Odwosta Bush ~mu Holy"h’lI
RIVERS V
SIr H
HGo
V V V V V V V V S V V S 55 S II
Go HGo Go
II H II 5S
HOo I’
SHIRL
1m 1m 1m I.. 1m 1m 1111 1m 1111 1m 1m 1m 1m 1m 1m 1m 1m 1m 1m 1111 1m 1m 1m 1m 1m
IJnSl FI
- U. U.
Sa So
0.
0.0 0.
Udlo 00U. U. Us 0.
So 5. So IhSo VISa SoU. U.
Sa
0. U. Us 0.
So Sa So So
U.o So
U.
So
U. U. 0.
Sa Sa UoSa U. U.S. UoSa
Sa
()a ~
Sa So
- C/4’r.JIDnlt 8’Y",a "’._ Iocr’Pir Mal"’ ~ POtTiJ.Uf4 Ab"oIr-,lH on_ J’nKltocurp Epocrid. l:Jf_’ Ii!>", JI, UI/."b, ’hblwm 1I,bn1 1 1-om. . Dar~o.1dsuaItw ~_. ApItof1JNUlM Lv_ PoIymn ConWJIlM CO. _ SOIU’Jd SIQ(’duSof"CMIH,.ia lfuoiUrdIJ E"dylt~M E".adUl ~ Ma)/OJI D~lIkJltomU CGSJiM Cdtir_ ScIeniIc
Ai’
.4t’Ql)pIu~N1~UMI,.XhamJl obIo,iflIirfolw tr"-am rUIlfngJm,i
lo
~ndlt’);
yp/Iu
c
Uipa """ laur/no fl{C uMJ
urptlS
fNMk", I ’fC1D liMOI’l doufJIl1 IUpml
abo!lia "._., robtf.li
DI<:-’, n10.rtl/fQcu"om, {lUMIa/is quiAqwf1 tomnlOS hlDC"oriJ c<hJslro oustrulh
c
",nu " l,C UJ
miu
plNDS/1’t)IJhk.
H_
(’I
(-)
fU,ltQ.un lt
.
ctClSQU~ CoNf.4leive N. lo"Uy!<pilI" SOU. m ANclAtuJywphI5. 1. , l-ehc1wod NalYC !-learn U’ucb:IT)^’" TWl.0" OGu1uinea ’IbuchGtvdinc.
Tm:
Sou.1x:m OwnV. K _ y W c d Jclybcon Seab!’1< ~Sompl . IknySal. Oralj<_ RtdOh", c.noH Rub)’
8u.~ Acalypha Nalyp10 H>dnap
" ’. f10wct
IkoatyGuShlwn)’cOJ_C:~, R.ghGula_ Daykt.~\Plwn
Flower
M. . S_B.r- cd A. ’ B-_ I’WM Onoce80x_ ~80._ s.Jt
8"’" B"’" Ikny
Sfl S S SIr SS S
SIr
S
SIr SIr V S 5S V S T V II V fonn
"m SIr VGo SGo So. so. so. so. So. SIr SIr SIr SIr
Go
Ifn I.n In. 1m 1m 1m 1m un 1m 1m 1m 1m 1m 1m 1m 1m 1m
1I:"MilAU’ ’’’’ 1m 1m 1m 1m 1m
S.SI 5.SI 5.51 $.$1 5.51 $. 1m 1m 1m 1m
FIt_
HAJI’l Il.. II, Us I~
I"’ ’ ,\,a’I, lJ. u.. U. U. 0. 00 00 0. U. 00 U. U. 00 Us 00
1;.0. lhoSo 00 0. 00 0.eM
LJ,S;, Uos. l ,~ 1J, ~
5.1lIy. ’ o.SaI)’~.1 Saly. ’ Sal 1 c. n.
". f),\ \01 .... Sa Sa Sa Sa 00 0. Sa Sa So
I"lM. \., So Sa Sa
"’"
lSS
Page 37
{.Jr.:"
S.I
n,l Sil SJI
I};,
Sa $;1 s. Pf I’( p( s.
," , . S.I S.l S;t~,,: S..
PI
0. 1’( 0,0,0.1’1’ O,Pf ( U.5., U. s. ~.’S,t s.t li"s;’, ,/.. ’h,~ 1 ~’~
eomn.:a. tl.. l);l UlI ()o U, U, U, U. 0, 0< Os C),I U" l1.. If.. ’1, liS 1i’~
Relrd JCt 1m Un I.. Un 1m Un 1m 1m LJ. I.. In. (n,1.111 lmSt IJn lJl’I 1.111 Un 1m 1,nl lilt 1m hn Int 1m
lM
fire
FOtm
srr S Srr S S srr V S S S S SS S{f’ srr srr sce sce S srr srr sn’ S l’ srr SIT’ ,. SSS S
.fjl1’
My"te Mlt \1I3 ~Iynle M)’rtlc
Wltc.Hnlct \ ’nuk
M
\tl ~I\)’e MUlou\I d MtUIC)f1\<!d Ironwod
la’T1.c,lInc:trBWolcMdh
U.1
Plunt
Com_H. NlUive PUYfl 1 N’ah\’t. Pin~I.o$l’Udt.
~pe tW.,ule J,f" " .\~,Ie M}nlt \1)’l1~ M}nle
Pleogy" Flat.-sltn1 Ydk>wPricly Blue\SIkylnkr:tot! S. ’t’ Prick!}B.c:on.-l
RO)
(.lSwm Sc.ly~I)’1c Th.:td-(;.".)\~tVd PhunM)’Jle Sm. CQOlo.!l
l.Id
nltr Iloh<lo ~1ount;1_U MIlk)’Srn.Ib Roo
iITC,;.rufla
(.)
(..)
(brlfM"mi}Nn\’e (..
tt,.
\V R
(-)
_,r"kI
(0)
hft’4fr’ lhmlfIlhft1(I04a mrto.il~(IJ" rrmaJmM
(-) t...)
htJ’({~llt(r(-))pJI.u’sl.rmtJ,;(
cI~:, II1/
himtl(’!fi ht’1f"WI’f ~lIr ut1 .fubst,j hOH’I",tlr
tlUMrd{ ,’U)tDlrns Ctlr1i(/mfo IUWbdtfJ rml u ml’r!i/"tI tJli foUu Jm~l/ ’(/ulmJiI (/’Jlmu/a ;i.\
’
.s
IJU~8t"li Jl4h:rf)’,/Ju
IJUM$(:tn}
l’fYIJ/\)t,~O" tn:’fliuJOIr Mll Jrt tiff.
bH
{lj/il t #
Name
Mt.’oispnlU<!-e Plr
flpt(lfm1
Sclentfic t.o,!’IU1<.f>:at Log’.rJl1Cft M!l1\’:k"t.e I’(ml {" JlJCIIlJs1l hisru ~tcl!.omO:’Je M~/a51"m’l MclhuX C! Tur Olt l)’It ~ntOS!~ iVurlu Awdu ACildn A(\’.If;1 \t lt/a Arflhu A~"Mrt/lf(m Monimb Wil i" lvilA tu opurnct:aEf’l IFnpul M,\’Opf)rIU1t :\-IMJ~.on1ptcr’aeml ",.ftir"’l RO/JflI M J{a/dIlN MyruK’tJ,l’-:If 1a ,\u(,’}AI1nIrM. .’( A’UflPi#I,)t(J.;~ml PlUi o.,ugl1Jd R/rotlm w
’I) ’U~
lt )’l i
_j
S.,
S’:I S.I Sa Sol ’ita S;I Oa Su S:o So S~, SJ s. $3
U.S lit U. s.
COImltnJ U, U, lJ, U’( U" U" U" OJ. (),(), (), 0. S:o 0.0.0. 0.0. 0.0.()o. 0.0.0.()o 0. (), U. U. U<t 0. U. VA
Retani ce un Un 1m Un Un 1m Un Un Un Un 1m lln llll 1m Un Un Un Ln, Ln, In. 1m 1m Un 1m Un Un 1m 1m Un un Un In! lJJ. 1m Un lm
Are
srr S{f’ S{f’ Sff’ T V SV V V S SS V S SSS SS
HCe liCe liCe liCe
H II II II H S S{f’ SIr S
FOtm s SS
APENDICS NliIT\)"tcrCno veCa~ilt. MlK’3fiUgI $I,")low;T Ekr~"ft)’ W"lyCI)’< Ot."’yCI, Slunt.e,’lf b.ntigPc!l SwGoc:.lknt
Name
Com on
h
OI
Odour Dlcodin&
Ilcn
10",
V"", ^ocit
Eye
Ua
Cilyc rlO S. . po
..
Cmbo rolu l-d "l’W F.1se C t Jlmon Uro\h AU)Irol
ing
go
HO\’ea HO\’e3 tnd
rul
Pe. 1’e-.1
I.l.\h
Sh.sgy lyl~
lIoUyl’c> Ne". ! PItl)’U"
"",,
ColC:U5 OU$h
Fk’. -cr Ff’.tnlo-wer _ Ilu8.1~ Co1eu’( Mint
F.1iJyf:1i) ScentN AP.nl’ SoulhcmSlhet’N:nlv Nl’i\’ O~ OI"yLl ,1
F!<)>.~r leur
Coe"’purJ!i,. 1l,ic.tIn 1 l kny
N\’l Scrub Qld NI"’~
l.)
f
(.)
(..)
t..)
Il
ENVIR
(1’.8tIW$ 8.n~t)I’,ry lWof ,nt:l.rdaf /.<vlso/.
(~) (...)
ltS
~>(tNUC61 alsr l fUel/mI -if ~a"delU pitwlosu (-)
"
o
T1V7orul {cJ/(lI
r a J n i / l u ’ t o
/
(Oo) (..)(-)
W phltH.,/{od’J IJrk,ius da"’"Ulanl
’ " i ! u l I . f
’lJ
l ’ i I r n
lH tli IOUfilk1
~ ’ , prl’t {o, ’scro 1 f J
linr:ons phoran l t p d ( lorius
. )
n.a
(omt-nl’Iu r-lfmd(J’/ m l 1 u t i f , I
rtbicmdl1 rt’l .f ,’iI(!:t }{(lr,q.if
f J i ! n m l " m o s i l . ’ f , / 4 atn/wlts
ln
(-)
Hilme
J
Cr.
"
) m o{O./HIP"’fi.}
/ a f r u s F . u l x m t c r . 1 C ~ t ) C : I l m t J U s } a G o d t l ’ a ~
.Ib
tI
l()’I f
Sdeoli!;c CrDtOl MflQ SJI Mal/Q"’ I! KHIU ;a EU/}Qmfn C,I’$I f.’nh~ Abrus ACHlj$ Glycine GI)’rlncr lIo~’(tJ 1 )\. " I IJi,e, Ken tHu o.r:J,lt1bwm Ox.)’luMc1lPu!, -wt’o P/lI’( Cfl PU"(lIiJ(, S~’IJ; ,tl W GOtj/’ma SNm"Seo<,ViI. StOClQ/U $1’dCir,J" 1’:I ,i;l:~t AjugPlt<cf’I/n~ (,ltIhU f’({lnm ,f PO,twlf’ tj L:ltra~"u.’ Ct)’.Leact, CIJ’plO<Xr:JY>
(
l<a
L<<u
Page 38
APPENDICES
...;;;;’
SCIeI1tiIIc:N_ Com_N.... F.... Ar1_ ~ SdonfitIt_ _N.... Form Ar1_ ~
-
RItoda"flua dlUfUcoltl R’b-f....MoII....- srr IIn U’SIt C llllum IfIlcrophytlUM SmoIJ.InfClonlhlum S 1m lit So
RIotxImHoQ .,.ilk.I, (-) S,noodJ Scrub T.."....11C S 1m Us $, bvxQ bI<<kl<ri Brown Coffcewood srr 1m LJ,s...
RIvJdomyn., psldioldt-, Nathoc Ou.an S 1m U. S. Morlnda DCJItifol ~ n)’Monnda V 1m u...su
SyrYfli- "1/_1 (.) l’owdcr.puffUlIy P;Uy S 1m U. S. MOI1NIo "","’Mid.. S_Monnda V 1m U~ SlI
PQ~"(J CIlUfrol;IfI.Ju Ptveua S 1m ,,,, So.
NYc:IlIj;l_ P",,"""III dnphMidtl Smoooh Psychocm S 1m ,I> So
Pisanll uleat4 Nllive SQupRYlllia V tm U. S. PJYChotno /( urotd., Hauy "’r<hocm S 1m U, S.
PsycltolrUl IInUfrondsWIUJ SmallPllydlocna S 1m U. Sa
~ RUndAll bnrlltalluQNJ NlbveOvdmia S 1m U. S.
ItUmuul./IIf slltpJki/ mm 5_J.....I"" V 1m U.~ RunduJ ~Itort(l(’t(l _.kofGonbtia S 1m Uss.
NoulDal OWl/a N...od Mock 01,.. S 1m U. S.
N(iI~/ Vt’nosa Vcincd Mod< 0..... $ 1m UsSa R__
Clow~1tlI br,,’isl)la (.) a........ s 1m U. S.
....sinllr.lWl. MiCT<<irnu mutrolllJICO (~, ’......LIme S 1m U, S.
Pa.U 10TtI -uroftllQ Red Pu,.(JOI1 Flowa- V 1m U. 00.... M"""Y" t1WJI,{oI,oIolQ (.) N.live Mwnya srr 1m U. S.
Pau’floro Iwrbe,’ NI Yellow """Ion Au..... V 1m Us 00.... P"’-bolo"", ._.,.(.) l’hebal..... S 1m 00
~- S.m"’-
f’,I’’’umiD bluNkt Sambucus QlUtl’ k-u Yellow EIdotbc:ny S 1m U. S.
(l"ptoJuu:ltya) NIU\c Pep::nM’nta Ii 1m Us Sa
Ptpuomut Itlr lryllu Nit’’’’r"pera..". II 1m Us Sa s.~
AI<<tryott CJ;Jr,tII’f:UJ (.) _B,nI’,Eye srr 1m WI> 00
Pit.....,.,..,.... A’7’~rQ ""cropA)lIa H Ows Coopno 5 1m U. Sa
CurllJbatul /1""’;$ DI""".rnd.1__ 1m U. S. C""""Pm _-..uN! (.) ........Ic:afTuck<n>O T !at u.s.00
C"riblJalu.t ptJJM:if1oru 0rluIJ. Thombusit Is.. U. S. CMpIlnIop.dl tn’tVto RUSIy T srr 1m U. Sa Oa
PlllOSporwn ~u,"’" Un.......L.aurd 1m U’I’Wb !i,o\" C""nlopSll M’ dsw{}#’Ih (.j OwsrfTudftoo S 1m Uj S.
11.,.,..11., o/UI. ,., W"I.lnflUhp S 1m O.s.
I’rot_ MUIl~ IUlfdo,cl4 Red...,.,. fill" T 1m U. Sa
Boww o"’luol,a Owvfllanloi.. $ OoPt
Banks., robur St"r;-atup 8d".. S OaPt Sapooi<eoo
Gf ’ill~u 1~/vplrylla W1t1JwnOreYillca S OoPt PIu~lrondla MY",(IfIJkkJ YdIowPlwn~_ srr 1m U. S.
Grn’,l/tu ’R .G_n’ o ’RobynOocUon’ S OoPt
Gm’fIIN JrnCN Pink SpidorAOW<I S OoPt Scn>phula_
Grn’illt ’SJu’rlq 1/(i’I4"’" O.’Shirley Howie’ S OoPt A.rt~mo fintbna/Wtt KoebbeU, II 1m 00
GrC’’1i11tu ’Sup’’’’’ O’Supetb’ S OoPt
11- /1"’.1..", fl.... S OaPt T"’’’’g.."la,...
11- ""’P’"’’ PutpleH_ S OoPt TtltVlf.OtIW IttrOJ:l)loidC’.J Noo\’CSpinxll HOc $. S<- o.
1..<tmIwrl/o {....101. (-) MQUr’III.... DeVIl $ OoPt
Lomutin JUl’ifolilJ Crinkle Du’" S OaPt Sobuat\’at
S/~It’VJrplU tlrt’flL’lifol (.) S 001’1 D.bou~D ".yopomtd~" Cork"ood srr 1m U. Sa
Snunr u.’,rulun Kon,proo AppI. S 1m V. So 0.
Rhil<.pI......._ Snum dttUM’C’SI"fIm C.) ~uIT)’Nlgh_ S 1m UII~
Bru&_IIJUU Z)ltuttlrrlifW Onon", MAn,..... srr lmSl Oa eo......1 SolanUM s.II!1I11t<<J411t (-) SIIIl N"h.shade S 1m l’, Sa
CUWfI!l IIJJ: l Yellow Mongrove srr lm$! Ooe.,....,
Rh’wphl}lT;t .Jtyllml S.iIIcdM.._ srr LmS< 00 (’~""I SltrCU’ (’rM
Brodw:h/llHI buN’llIu u.IleKumJOftl S 1m \h~()..
K_ Commn-SQlNO /rt;t#,." Scrub KUIllIJOO& S 1m t.. So (lo
floh.. ",.,..,’10114 PlnkRupbcIT)’ 5 lm 00
RIifIHu rru!/nf"d NItl,\’e Raspberry S 1m U. Sa Symploa>e<oo
Rubi6cf1te SwnpltJCIU ~wr/~/UI (.I Shtvbl:l)’ H_I..-ood w. II" 51
C llJunn copmJmoid" COI’l.uC.lIlw.m srr 1m U. OIlS.
Conlhlll". IoItJlJroPltyllum LMx<.leaCc..tlluU srr 1m U. Sa
lS8 liVING W1ftt THE f;HYU’ONM(.’" IN ~INt ’UY(RS S,"URf --- -
fiRE REfAROAN’ ~ATlVE. PLANTS 159
Page 39
16
CGmctl(s A<I Ad Ad s., S:IOU U. U. 1,1. LJ, 1.1. So. So Sa
Sa
0..
’!,-S.flt Pi’
"" II; ,’il
At
f
Hr\l
}t~"fl Aelardnce 1m 1,111 1m In. 1m .... ltrt 1m 1m 1m 1m 1m I," IJ. U" 1m 1m km 1\Il"A’!,1
’imnJI F1re
for ’1!tr"U
Gardens Jistorplan~ Form I’ I’ p V V T T T T T V v V V T srr srr V
Vine McfodinU$ PJfW (Ii,nhcr
Medium odiuon COirtmonHae
for
!lit
to
in
J’l lm C.""
P’ic:lbxtl lAwyer OIhb.1t, >nlm S."plS!).Il<kIIk,ub1-WIJrcVm p"*
TUf l
Il< <h
$
t\hlcr
Musk\od M.u~kwod C."’IY OuinoeT~ Mel1 &", ulfw:m Oimbing: WongaVir’IC: Vtl. _8t.\n White fltUbland cro\4lC:;tdT’ f
Plants Ll1i he
l ",l",
,"n ’:I!t(lfoXJi)$ (0.)
(~)
,
(.)
"MdJ.u cOJl r, o at:(flWJ!1QrU$ts fN"FIQmliJ
can lli.,
(",rclu
FIre-Rtadn (OIlWUlg Mo.\"()COTI’U.l-\rNSt’cu.eat tlfr,’Ri1{;Achm/()[,lrt:J U"{:.Ilt SrnU:IC’"ace H",x’gt)/"~ ICO’YWX),\"l ,\krHl~K’t1e j\hl1giuC’te i\I),~l;ut I)(J.$",’mlt AI1l0"I,lS’n/mU ,-\nrtQflO":K’ ;\lOC."Jrt:Ifchw/rulh MdqJimu Ml’i);\ru:ft1lkH."IC~: C<,pflonmU 1JIf.;lu:"CI "’Jr~"m’{1 C:ltS"I(.’-fiC ,fJr"’&lf ImH<’lir t (J.’(lU! \~;ml/i1I
pl:U1 .) t’lame ltI/d(lt,rmiN/~’j lIJ~frt,.1 Itlcr/ls ntlJ.fUm 1,;tlosmr Il /Il
lJarkl,./1 C(I,U;,’ (.’ulCi(UoJm1,l(tIl Ofl’I1:Ct. 1h’df/lmJ ~
i
Sden1 (’"lfIJ"’ $mj/{J\ .A4’lUd" pf
1,/uoI"
tho
S:I s. S. 5:. Sa
Oa S. s. S. s. S. So Su, O:t Sn Sa So
s. S. s.
U.O,. U.o. 00 00 1,1,0.
Coments U. U. (b Us Us U. Us 1I. U. U. U. U... U... U.. t1. S. Sa V, Sa So So So S/. S.
Refardne ln’ 1m lnl 1m In. In. .. I.’" 1m lno 1.111 1m 1m ln, lm "" 1m Iln W, ltrt 1m tn) 1m Inl ltrt 1m 1m I.m
Fire
SH
srr H H srr Sf!’Sf!’IIG: SG<: II " V V V V S F .11 II~ <F IF eJ! l’ eF eF
R
SS S
Fonn S
APENDICS ComnUBa SJendc-rRJC! Flower
D:l(thne Bu:.h
Serut, Corcho
’(
Spil\)Ch Nel i. Mulbcf .)’
lrOI’e:;.l Smol S<,~
Bu~h
N’l i vu \!lvCI-e:>r Lol y Unity CI)I)t Vile>. Purple
b
C
I " , l.ol y nlinc Viole.
NOI.Y1)l, Slendr J!", Sm;tl.k:fW~eVi
Vine Vine
W,’\1c:t W~h:r
1~pt)i:t
H:lil’)’ son A S , * : c n
u"’.
w o t Cmw’({ K i l g : ’ C ! . m l
m
eq
k ~ r J ! ’ c m ~ " c d C l h n b I S S U M " S t ~ h ( m 1 r o e h
rem
F ’ e m
F’dtPC’nl
Rocl
’rI R:l
(..)
f’lr(}/t."Jmf cl!um#,JtaO {fI(ltl nm"ilghatf7 ~C’lI"/af(,(lp,i.t\d’ltl"(~ 1"lIu/cof Jlr!fb1mdlih(’J~",osl."rx1fl(}’d IltumicflQ h{dt/y(.rd "If}’1t(Ur/:mulfctJ LlpItd flIrn,’ ILnr"mi,wl I~,rlxml r;gMuf IcW/Nltf’( bi/lmftr u,’t<rlN,m C(mjlt’I:,fJlpt’ri.f
(.)
(o.) /Mil
lltr
’Nl
Sd,l1IUcN.mo T"yml1’uctne I’/rtldu Nrl t.r Pil tlW UrhftJ"la ’liIm,OC1: C(Jrd"mu UrljC’IJw:Ul(c/J"fmUI .JtH()$’I~1 IN/mtnl, \’crhe.l1Kt:iC! C,t/I;:arptJ Clrf)(JI’/unlN ClmxJrk/ln f)hylt, t:udl( VTtJl~.e Cuymrflt Ctyr’lft( C(1\"(Yum C"lIJt.$ \Vinler",W(a’mfMia l’1f!UJ)cIWn:s (hltJfd~UA’$I,lei Asp/flUm A.\j}Ifnr’l1 TtXlf’d l;t)ypndI:"Cl’1c O"rMlPtl,jft,i(l/.J PI )’( r P{lf\’,ritm IJj’rtO!l1f Pyrm,/n
(.)
/h,
iWi J [lu
lct:le ltfll
f
amra l
~"t"l Vi VIoI" Vil la
Page 40
"-;:-
APPENDICES
SdeoIIIIc H.... toownoo...... f’orm FnRetar_ Ctm_
_...... eoo.-...... f’orm Flre___ c-.to
-
M,,_
DIOSpyrf)S. UflSIroJis BIaCkI’lum T 1m Ut/Wb
M1OfNJf’NM UCIIMU1tlJlWIf C-BooI SIT 1m Wb IN
DIOIPYros !l<" 1IOUI Scaly Ebooy T 1m lit/Wb
DiOJp}fW .1Uba<", I-) Red.rrw.... Ebooy T 1m U.
MJni_
Rupo.." """"’-/ Mullon~ T 1m U.
.:-1100......
(l1U INK/’a)"""" H Qu<<mIMd lAwd T 1m U.
M,,_
PoIyullJuu nt/lt/w",.a Canary 8a:ch T 1m U. ""IfItQSMlli
(SIHlIllwulttiu) O<d<LiUyl’lJly T 1m lIl/Wh
EupMrbia<toe l<<uptfYlflUllff Itu.mllt S.lkyMynJo srr 1m U.
Clot’u1lon ulUlrole nn"...._ srr 1m V. 101,,,,,,,,,,,,,, I/1IUIUIolfilko (-)PInI. MynJo T 1m U.
Cmton odrronye/uo;Jn Tho;k.""’.... Crooooo SIT 1m U. RIoodumNa ,*_fU Brown MIUd_ T 1m U</Wh
Cf’OIOIf flUWIII11 Quc<nslInd ao-dla SIT 1m U.
5r-Y11"’" 100II,..."""" (-) ~R_..ppIo r 1m U.
CrotOn .I"~/O:iN$ Who.. Crocon T 1m Us
0I<0m0e
..,-
Nou/Qm ./(JI """....Mod< Qt..., SIT 1m 0,
Ety’’’,.,NI ’Y~rtrllo &1’,Wln,QnIT..., T 1m Ad De NOId""" w.., O LIIIp \1odcOlovc SIT 1m UI/Wb
NOI~Joca /Ncrotarpo ""’va Mode Olive Sir 1m
11"""’00_ Or/Wb
"tT’tHlndJa lHvalvtJ eu.ta- T 1m Wb
I’ItJ"""""’_
H""’__fIo..... "’..,VC"""""""" T 1m U. Ad
LIIumc;cat
PiI,osponmt NllduJOff,Utf Muck 000ntIe T 1m III/Wb
CrypUXUfYQ bldt..,II, Yellow"_" T 1m Wb
C’>Plocaryo ""blfU Thidc-Iao{lauod T 1m Wb -
Crypt""ur", "k,opIo,lIa _lA",d T 1m Wb
8.ct.n,1o _"., (-) I....,.a.t_ T 1m Wb
CIJIHotorya Irrplinrnu _’nLaurd T 1m Wb G,tyllka "’_(-) T 1m U. Pr
Crypll}Crll’yfJ mpl ..,,’u wu H<<bb<u.-1ri4 ,."",ml,’1iD (,)Red 1IoJope1/\.. T lm U. Ad Pr
pfA~’U Horry6mwnlauod T I", Wb
LiNroal<a arlNxurms (-J TiooL SIT lm U, Pr
1oI~ I.tqnfoho Queensland Nut T lm Wb
M.llacoo<
MU<tJdiJmitmofolia Marooc:hy N.. T In. \Vb
O""vnw,ylIQ.s Crow-,..""", T IJn U</Wb MUl’flfia t~troplty(1a Roo’"SheA II..... /\01 T 1m Wb
S)’~"’ ~/w"JuloSUM SCtnItcu. ROK"ood SIT 1m U. Tmllllo yoon’UlItR S,_ "", T lm U.
7W’r pflMSUtlS
cr "","’0") Na.uve Wo:h.llurl T 1m U. Rubbl"t""Ae
CtWk)llH’rm~tff pwt,~"’QJJIm C<<""",""",,m V 1m 50
\1~tbptorn.at’tW lIodxblUo"la ~(1lifl iJ GoIdcrI.w. T 1m U>lWh
S’~pNUfJU JOPtlll’la hI’
duc"’Olnr lVonc V 1m 50000
Rununcullc:at
CI,ntalU ,~iIftNk:t _V"", V IJn 50
\1J~M
AC(1t’1 lIulucoccupu "dory WuIIe T lm Wb/1’( R_
ArlMIO InlJ’lf’J W"’. Wood T 1m Wb/1’(
rtltllycluo tpnfOl’altJ C..... Aspen SIT 1m ’’’,Wh
AeOC"Ju IIWluno.rylOff Or.ckwuod T 1m Wb/1’( Iocr""",,"’" pavnjlom SolI Acronyd srr Lm I’,
,k<<io n"ci,,,.tU41 Wlnle SIT 1m Wb/1’( UU’TOCltntJ UII.1trV/u -....... S lm LIllo
Pflrurrludt",tmn prU;noSM’" SvurJ T 1m Ur/Wb
Sapl-
M~
AlttfrYOII ",Mal., Akcuy<J<O T lm Wh ,t..,.. ,II
FIrIlJ CtNrHtUl C-.San.lpopcr A. T 1m VI/Wb
fiN
Fk:,u’ If~rl ..Sandpap<r A. T 1m Ur/Wb <IIfflryI>n 1Vlx:o""",,,, WiIdQumce T 1m Wh
".;CIU poJJlO ..Sondpap<r 11& T 1m U",","
IJKttyon subtktuuJ.u HoUy-IcofBord’,Eye T 1m Wh
5nvhll,-, b"#w,, un
Iolfftry<Hr"-"""’" ff..i:ry Btrd’IEye T 1m WII
(S p<nJuJ"",,) Whalebone Tn:e lm V!l/Wb Arytt’D tbm.Ju lIo...IcofC_ T I", Wb
261 lIYIfr4Q WITH tHE (""VI"O~"’E~1 IN ’IN! Plll/l’l’ SHUll!
FIRE AfJAAOAHl HI\IIVt P1M.h 263
Page 41
APPEHDlces
SclenUnc Hame CommonNamo Form F1re R<lard.lICo Comments ScienllllcName CommonHame Form FiJI’ etardance CommnnlS
RO<cThm:arlnd T 1m Wb 1-’!tb"eU:uiutc:u!
A’1’UU d ’lJf;(IJIQ
PiuecJ C>>ger.1 T "" IVh F/n,(dJaria ilhllc:a V
ArJ/c.ra lort-olu," Suwkjo<k 1111 S,
$..,II,le"f’I k..oo T 1m Wh
C"IJtltl/{lltds paf1’ifQIi4
CtIJHmfopsi,f .tllirl J’Onu (..j Wtdge.lc:lf’lkcroo T "n O./lVh 1\lI1d:l~tC’t!tf
ll<<Ml:lIl Tud;(.~roo T 1111 \Vh Fr()’t’lntlt iJ f’X((1M OlmbinSP...",_
CIIJNmrol’Sl..Y IlJI1ltJlIl’lIa (..) V lm s..
Ikdrll~ T 1m tI<fWh Fr~yt nrllin ~C(1nd,.n$ ClIml>..,I’lI.Od:ul", V "" Sa
E!(lI(flJlm:h)’J ff.f!rf
Whll.T.nWIll T 1m Wb
EldfWJfm:hyJ X)’l arpu
T 1m \Vh SIllUllc~e
(}Ut’tXI J"I!m gloltrQ WiJ(IQui..."
u ilkrtmil I",’chdla (-) ’FiI)C>I<.rTuckc:roo T 1m Wb fllpogpnlm, album M,i,e Supplr:jo<~ V till S3
R~ J"’~Jr~rNj, T 1m Wb R [HJ&t)fullt bm’ifollum SuWlef’ld< V
Mil(’h()(’l,rpIIJ uWlruli1 "n Sa
T rl!ima U!trat StrubTtol< T 1m \VI> Ripogomm1 dlJcolo, Prickly Suppl,jod< V 1m 5.,
R1J’1(JgDnum ,..1sr.y(IJ""" I IlIiry SuWlcjo<t V lr. S..
S:IJ)QI1K:1.’!.le
-n,i".!eafMUll’t srr 1m Us S:1 1)f(.’01"1.EDONS
NlJllrlrm,dh~ dklftat’Cu
Plullrh,mt-lll, CfJtlnij’t)(iJ, S...U-bfI~lIm srr 1m U< S:,
Allill.:al’dllH.’tUt!
.
Sln&anXl ;K("3C
,I EurouhuJUJfolMta Ili,""",,,,,,,,) " 1m Wb
NatlvePlul11 l’ 1m UI RhoolJ.\flhiJi’r/I rh4olll/’clIIlI DI:<p Y"U",,’..ood T
CuilllJ)’lia mOlltJ11.,rIJ "n Wb
,I Annonnctar
S}1"1.-...e
UulTlI"",’wQ<lil srr 1m tI, Mtl iQrum l~irfl"4Ifdl
Sympl(KiI~ Ihn’flituii
(Rlhiwt’lflri1fia I,) Zig.."/.:Ig ViO Y 1m SlL
I’ll’JUlX)(’IWT1::s
,\rwx:ynnt.’ntt
Cy1Uhe::lccae Ab.u",jd tOlUfriCtll Quin Troe T 1m Wb
C"(lt}i(iI uUJf,UUS R<logh T~ fCm IF Lnl U. MdQJi1U1S lKUtif1;:wUi .\Jcr3ng’oUT:I V 1m So
IF 1m U.
C)"/hffl """pm Comn...T_ I’ M<lj)Jnu.r au.nrali:t Soudtan Mdodinu.t V 1m So
IF lm U. ParJtJ".riu ~uclJlrp(()phJII(1
CJ’tUhta Itid/"tmihmil I’n<kly’T"",fcm C’’’’’P1oo V Un s. O.
Pllr~~((1 fuh’ FIIt1’)’Sill.po<l V lIn s.
POr!f ;Al IOf1"" fllfO N nlxm SiJItpod V lrn Sa
Are-Retardant Plants for Large Gardens, Acreage Blocks. Parks anlt Par.wm:rl" Imilo/I’d MOnkey VI". V "" So
PartlNlSitl jJ;amin MOAAlO)’Ropc- V tin Sn Oa
Fatnis
Pan/Jlmh ~,t’{U(/lW \~I\ldSifkO(ll.l V lJl’ S.O:1
PatJOf1J n wnrrifOJiI ""rnlt$,tl.pod V " ,,",
1’hc rollt\\I;jng pt:mls c:n be u~,.d tn tII~lition 10 the 1i~~ or pbntJ lor"urtutt afld nw:d um ~-:tnl,"
,\rC(Ucrne
SclenlilleH.... CommonUame. Form FlioRetard.... CommenIs Calamu4i tnuellt!ri uw~crCMc V ’n So
(;YMNOSI...:ru.t~ ,\r.nUut.’t’fle
C"I,tmI mll’, (’t’plwlf)oorf)’S Ounbmgr~taJt V IJn Sa
^ruuc~ m:em:! Paly.,clt)$ ~itJj tU Cel"’}’\’.)Od .T 1m ’VblM 0..
QklK,url T 1m pt’.re:o.’lI s..
,,~(IIMl nJl",.,rlt t..)
T In. pf...~ill I’1J1)ltlu.’f Itwrl’fJj’J 1’tlt~llec<bt T
,\(l.IlItO’;U bllh~1l1il (.J U"~’ Pi"" IJn Ad OIl So
T ".. Pi.~’\1II
J’ulU:ar;1I c,mllftJ.l;"umu 1J000Pin
I"""""’p"",oe ^:odfl)fmI ~
Urownor Plum Piue T lm t’f.n:\.1n Mnr_fdt’lJIlJ ( CommonMiu..WrY V ’-’1) ’&.
Pl1ttOt’urpm tl",,,s .itra/u
MONOCOTYUillONS ^11,cr~lkml:l’:Keae
DlqJlmoluJru u rnmtlfll ScxJo:e’wO(Jd T IJn WI>
j\.....,....(P.Im:..l
V 1m S:IO..
C{JTanms mut.lIl’rl Law)erCW~ Vine
264 I.JVItIG WiTH TIlE ENYt ONYEN1 IN PINE RIVERS SHIRE FIRE RETAAOAHT N.I\TlY’C PlAN rs 265
Page 42
APPENDICES
---
-"’- ScionCIftc_ -- Fom> Rn_ ComnooftIS
Sdo<dIIIc N... c.n_N,... Fom> Ar......_ ComnooftIS
...",...,
D,ssiU(lrl lNtIo,/UOfl/U lJonccwood T 1m Wh
Arittn_ DryptCluastrala.lit:tt YellowTul", T 1m Wh
Cn:y"’’’’*"’’’’ T LtnSl ()# 0"’\141 ExOCOftUrUl a,.,l/oelia T .....51
"v,U’""jU marino MiIl<7~1:wI_ ^tf(’I~1
ocOt’N"a dolloc:1t7aM Scrubl’oi_T"" T 1m WI!
Bu~ ClocMd,... ftrd ",nd{ a-T... T 1m WI!
Cam..wood T 1m Wb GloclUdltHf J’umutranNnt 8uuon.ood T Wh
CctJHJrlUl’t aIUlMGJ’CUm 1m
MQlloou di’srolor Ydlow~ T lm Wb
Coc<olplnu..:... Mol/DlId plullptNltJf.. RtdKan.... T 1m Wh
NIUlve ....burnum T 1m Wb
C n", InUrtJliun# (.)
ClcsaJpuua V 1m Sa t._
Cu~J4Jputi(l bomlUt
I_PndJe V... V .... Sa A bliKi.tJ Blood V.. V Lm
C"~w1(’lnIQ ’fCtHtct:l""" ’fYllI’~"U SaC);>
Coo1cy I’ncI<lcV"", V 1m Sa CaJlalfO$fW~ 1IU.l1TU1,. 0__ T 1m Wb
(""VlII,llfla :JNbtTOfHn,
lk"fS flfWJlWo ........Dmis V 1m Sa
~ Erythritta sp /.My,..C....l eo.t_ T lm AdD<
SI>IT C’1unbct V I," Sa
C,ku,na olUlr jJ U)lhriWil ._nil,. Bau.....C<nlT.... T 1m AdO.
lArJeSuoffV"", V 1m Sa Nu(uMJ ,18U1l1ta V 1m Sa
CdIJJIrIU IMbJP/~"tld 8....,._
l....JclU’rltll" borbulu
Kn V" V 1m Sa t~
(1/’{’f’ONUI"" b )
Scolopta bn.unli FI_ T 1m Wb
CU__
Culddlntu polt;(’ulfJJD Rooe-IcaIM...... T 1m Wb tll_
T 1m Wb
Ctn"OfW(altllft fl(WlDlum (-) Coachwood FI"tdcrsw QlUltYJhl c-.Ash T 1m Wb
Red Car:obocI1 T 1m Wb Flllltdtrftll btlflKflUlM IIcnlldf. Ash T 1m Wb
~ rou bt"tltaJlU’
P.Jf!udOl4’f~tnm "n U Plittdn-SfO t:
uta I..oopol<1 Ash T 1m Wb
M..... T 1m Wb FI ldtTSlU srltntt T
lucltff<<tupO ItO ~CfBumpy Ash 1m Wb
Sc/ti!’ ’Ota WhIlcOm:h T 1M I.o/Wb FI,nd_a """""xy14 Yd...._ T 1m Wb
~ ’’’’’’’"’’’’’’’’
T 1m Wb C".-IIII_
OIOSP}""/..001/_ ~Ebo7 Chum.mod T 1m Wb
’l7l11eE.boay T 1m Wb pOlNJ/Jl’" CMlU,,~1J B""",IIoocb T 1m Wb
OIO$pytYJ.t ~,.tamnu
Eh..._ 1-
OW,. T 1m Wb CryptlKtJTYl1 trylltroxyllHl T 1m Wb
C""’", d"Itof_ (-) Pi~^",
Elv",a "",." ""’U Koda T 1m MOo C’7lIl0cun0 ~)’PfJ’IH)d Ra..(n,,’~ T 1m Wb
Crypt<<""" __Idll CcoIooIa I.aftl T lm Wb
~ Cryptotarro IIffCrOM~f M""",... T 1m Wb
Ewnundo~ T 1m Wb
6JmC!’Curpw t’UMUrW’ Cryptocorya obmYJ/O ~T_ T 1m Wb
81.. Qu>.odooJ T 1m Wb EttdJulIJru ",wllm Mllel,.... WJdnut T lm Wb
I’HlCurfHU ,rtmdiJ
While Quandonc T 1m Wb "nd’andra pollou T Wb
61oN1curpw Urtlltll ’’’’11- lm
""’"Quondoo, T 1m Wb 6It1uN/I’o SIt,,", t-) ILvd eo.twood T 1m Wb
EkNocarpuJ obohJtN.r
\baden’, B""" T 1m Wb tr,rnsu
SltJIINO uwrral,s NtoltLH Gn:yIloll)<Oum 1 1m Wb
S/f’lJMU .,fltl/b, y.IIowC_ T "" Wb "’eol,ts~o dt lklto WItde Bolly Gum T 1m UtIWb
Esaol_ ~bkame
T 1m Wb H~bfst".u Itltld CcaonT....
QII’’’fml" ","don’; C"’y__ T 1m Wb
La,,,nar pa! nu H NcwfolkloHi_ T 1m Wb
&~
-l/t"tli’N.rJJ.l IMVllI;; (-) PIrlI<Otcny T 1m Wb Md_
r 1m Wb
&II",h,u l""Ph,,,. (8 ""’)Scrub Oloodwood ftlMt: fHJ nUull"
B,Id.,.’,Q I’XlJtlQIO Sauhhll’1bork T 1m Wb (P.,....Jocur_ .,ddula, I_C<dor T 1m W~
Lochlwdt’,Ironbut T 1m Wb T
nddia Iticltlturd", Dylcuylum fl’ ROIl’i(.VI>’OQd 1m Wh
Ctoo.n/lHl alls.,,"’" 8ritlk"’’OOeJ T lm Wb
FIRE REtAADANT NATW( l.tAHf!’l 267
LIVING wITH fH( EHy,AOHWt-Nt IN Pfl’lE "lYEAI SHIRE
- -
266
The text continues on page 43.
Used in these records
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.