MEMORANDUM
-..
BLIGH TANNER
CONSUL11NG ENGINEERS
To: Fulton Trotter Level 9, 269 Wickham St
PO Box 612 Fortitude Valley
ATT: Mark Kalinowski QLD 4006, Australia
T +61 7 3251 8555
CC: Michael Edrich -
Craven Ovenden F +61 73251 8599
Leon Rowlands -
Sunshine Coast Council [email protected]
www.blightanner.com.au
Date: ast May 2013 ABN 32061 537666
From: Alan Hoban
Pages: 5 in total.
RE: Noosa Flexi Learning Centre -
Stormwater Runoff
SUMMARY
This memo provides further information to support the Site Based Stormwater Management Plan
for the Noosa Flexi Learning Centre (Bligh Tanner ath August 2012). It further describes how the
site minimises ground-level impervious areas and seeks to mimic the pre-development hydrology
of the site. This memo has been prepared for the purposes of:
1. Demonstrating that the site does not need a formalised stormwater connection to the
street.
2. Demonstrating that the site has no effective impervious area for the purposes of
calculating Infrastructure Charges, based on Council’s definition.
APPLICATION STATUS
Please note that there is a current negotiated decision notice lodged in relation to this
development application.
DESCRIPTION OF STRATEGY
In order to avoid affecting the vegetation communities of the Girraween Nature Reserve through
increased wetness, the site seeks to avoid the generation of stormwater runoff by avoiding, to the
extent practicable, any ground level impervious areas. This is consistent with the low-impact
design intent of the site, and also plays a key role in reducing upfront and ongoing costs to the
school, and to Council, associated with the provision of stormwater infrastructure.
The occurrences and magnitude of surface runoff events from the site are reduced as a result of
the proposed strategy due to the detention and reuse of runoff.
In the rare occurrences when surface runoff is generated, it will discharge across the front
boundary of the site via overland flow to the existing kerb and channel, as it currently does,
without causing any nuisance conditions.
An overview of the strategy is presented in Figure 1 below.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.