Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463
Plans and drawings: the text below has words only, no drawings.
Very large file (76.1 MB): may take a few minutes to open.
Bligh Tanner Page 2 of6
Current State
..
Runoff
{.
"
’II.
1.8 MUyr
(270 Us peak)
Noosa Flexi-Learning Centre Development
precipitation
8.9 MUyr
..
Runoff
1.3 MUyr
(220Us peak)
Figure 1: Overview of the low-impact stormwater strategy.
Tf:le site currently has high infiltration rates
Percolation testing on the site was carried out in September 2012 by Soil Surveys. The field test
method employed in this investigation, ie. Constant Head Test, was carried out in accordance
with AS 1547-2000, Appendix 4.1 F. At the test location, a 100mm diameter borehole was drilled to
a depth of 500mm. The test hole was then filled to a depth of 250mm, the well permeameter was
put in place and the test commenced. When the fall became constant, ie. 10% or less change
between successive readings, or flow eased, the test was completed. Readings were taken at 30
second intervals. At four locations across the site, saturated infiltration rates of 4.0, 4.2, 4.6 and
3.9 m/day were recorded, or an average rate of 170 mm/hr.
High infiltration rates are preserved in the design
. For 95% of the site, ground-level permeability is maintained.
. 68% of the site is free of structures, and significant amount of the site will remain
untouched by construction activities.
. 25% of the site is roofs, and most of the buildings are lightweight structures which sit on
raised piers, preserving ground-level permeability beneath them. Buildings are connected
via raised boardwalks rather than concrete pathways;
o 40% of roofs drain to tanks
o 40% of that water is used, primarily for toilet flushing (accounting for about a 0.4
MLlyr reduction in runoff volumes).
o All surplus roof water discharges to infiltration trenches beneath buildings (the
infiltration trenches have a 100 mm extended detention, are filled with clean
washed gravels, and have been incorporated into the structural design of the
building footings)
.
Only 5% of the site consists on slab-on-ground construction. This was necessary to
provide for the Sound building (for acoustics), and part of the Create building sits on a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.