Council archive · source document
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463
Plans and drawings: the text below has words only, no drawings.
Very large file (76.1 MB): may take a few minutes to open.
If Severe or Extreme fire weather conditions are forecast the FLC Administrator should ensure that:
1. the grounds are rechecked for tidiness and freedom from leaf litter and other fine available fuel.
2. the current Student List (and daily Absentee List) are ready on hand to be taken with staff and
students if an evacuation is required.
3. fire drills have been practised recently (in the past 6 mths). If not, it is recommended that a practice
fire drill is conducted, testing
a. "sheltering-in-place" (for adjacent bushfire, with insufficient time to evacuate),
b. evacuating to the Assembly Area at Noosa Aquatic Centre, roll calls, communication (with
fire authorities and reassuring concerned parents), receiving the "all clear" and returning to
site.
c. operating fire hose reels to extinguish small local/spot fires.
External "Assembly Areas" that are used for structural fire or bushfire should be at a sufficient distance to
avoid respiratory and other hazards. The Noosa Aquatic Centre is considered to be an appropriate Assembly
Area for fire within or adjacent to the FLC.
8.0 Assessment of proposal against The Noosa Plan (2011)
Performance Criteria /Specific Probable / Acceptable Solutions
Outcome
8.1 (04)The proposed use does not The use is sited on land that is determined as medium risk,
compromise the safety of people however mitigation measures outlined in this BMP are applied.
and property from bushfire.
8.2 (05)Community Uses, including Solution SS.3 is applied in that uses Incorporate several bushfire
Education Type 4 uses, are able to protection measures in combination, designed to enable
function effectively during and functionality during and immediately after bushfire events.
immediately after bushfire events.
8.3 (06)Public safety and the Solution 6.1 is applied in that hazardous materials are not
environment are not adversely manufactured or stored in bulk on the site.
affected by the detrimental impacts
of bushfire on hazardous materials
manufactured or stored in bulk.
8.4 (07)Uses and works are sited, Solution S7.1 is applied in that use is made of the existing grassy
designed and constructed to -
area adjacent to the "Create" building. Whilst setback from the
a) minimise the number of people property boundary is less than 10m, a non combustible radiant
and property subject to bushfire heat barrier shall be constructed to reduce BAL exposure and
risk; and complement construction levels, asset protection zone (IPA on
b) maximise the protection of site) and landscaping.
people and property during the
passage of a fire front.
8.5 (08)An adequate water supply The use is in an municipal water service area and access to
is provided for fire fighting hydrant supply points shall be available in accordance with
purposes. AS2419.1-200S.
Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013 Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.