Skip to the record
The only place to find full transcripts.

Council archive · source document

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463

of 92

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (76.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
8.6 (09/011)Firebreaks and fire                 The limited site area (0.5744ha)does not allow for or warrant this
access tracks                                   infrastructure.
8.7 (012)Road network provides for              Solutions S12.1 and 12.2 are applied through the existing road
safe and effective evacuation of                infrastructure (Giraween Street) and a safe egress route is
users of   premises and access by               available to the Noosa Aquatic Centre in the event of evacuation.

Emergency services.                             Access for Emergency services across the subject site shall not be

                                                impeded by obstacles including landscaping.




9.0       Recommendations

     1.   The proposed development shall have hydrants fully installed in accordance with AS2419.1-2005.


     2.   The Fire and Evacuation Plan for the Noosa FLC shall be implemented and practiced every 6 months,
          or as a minimum,      prior to the fire season each year (July/August). The Plan shall be reviewed at a
           maximum interval of 5yrs, for efficacy and practicability.


    3.    A non combustible solid fence (eg.Colorbond) shall be constructed along the northern and eastern
          boundaries of the property, to a height of L8m,to serve primarily as a radiant heat barrier.


    4.    An Asset Protection Zone of the entire subject lot, shall be established and maintained as an IPA, in

          accordance with Section 7.2 of this report.


    5.    It is recommended that the consideration be given to constructing the proposed buildings as if they

          were Class   1,2 or 3 buildings under the BCA/ AS3959-2009. For the most exposed building, this
          translates to BAL 40 construction on the exposed eastern face of the building, and BAL 29 on the

          protected faces of the buildings. Section 6.3 of this report provides BAL guidance for other proposed
          buildings. Builders shall warrant that they have a copy of this Standard, and that it shall be used
          consistently throughout the design and construction of any residential building.

    6.    It is recommended that when installed, air conditioners for the Support and Create buildings are
          able to draw air from inside the building, assisting their function if air outside is contaminated with
          smoke and toxins.




Report compiled by Bushfire Risk Reducers for Fulton Trotter Architects, April 2013                Page 25

Used in these records

About this file

File size
76.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13_0463.pdf · 76.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.