Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463
Plans and drawings: the text below has words only, no drawings.
Very large file (76.1 MB): may take a few minutes to open.
,---
)0, .
~~\’2
/
EXTERNAL CATCHMENT 0.3 Ha I
LEGEND
PROPOSED SOAKAGE PIT REFER TO STRUCTURAL
~
-
.
DRAWINGS FOR DETAILED INTERACTION OF
NOTE DRAINAGE PIT AND STRUCTURAL ELEMENTS
~ER TO STRUCTURAL DRAWINGS FOR DETAILED
INTERACTION OF DRAINAGE PIT AND STRUCTURAL ELEMENTS PROPOSED CARPARK
CONTRACTOR SHALL UNDERTAKE ALL WORKS IN PROXIMITY TO
(’/’,~ --c
2.
EXISTING SERVICES AND INFRASTRUCTURE IN ACCORDANCE o 0 PROPOSED STRUCTURAL ELEMENTS REFER TO -
\ \ ~ f I~ ’I
-....... .
-....... WITH THE RELEVANT UTILITY/AUTHORITY POLICIES AND o 0 STRUCTURAL DRAWINGS FOR DETAILS
-....... PROCEDURES
’;, III I
I ~
\
\ Ii
III LOT BOUNDARY
\
\
\1111 \
I
I \ ~ I PROPOSED DETENTION AREA FOR MINOR FLOW
I \ \ II f
n
II
GIRRAWEEN COURT
TSTING FOOTPAT
I
I
I
\11
~ IF
\
\1
I
I
Il
I ---
R.L. 32.5
I I I I
I I
I
\I I
I
II I
I
Iii ,f I
\ I
II II ---
,I EXISTING SURFACE
I
"
\ 1/ III ’’)-
~
\ I
~ATUM R.L. 32.~
\ tj l.
./"
-j
If
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
/I "f
\ I? I ./ (..t SECTION A
I
\
\1/ / I I
I
/
/
VER SCALE 1:10 (AI)
HOR SCALE 1:100 (AI)
t I I
/
l_L/ MAINTAINING PERMEABILITY OF SITE SOILS
~
/
/
)
/ 1. THE CONTRACTOR MUST READ AND BE FAMILIAR WITH THE STORMWATER MANAGEMENT PLAN (BLIGH
TANNER PTY LTO, SITE BASED STORMWATER MANAGEMENT PLAN,JOB NO. 2012.167.600, 8 AUGUST
OVERLAND FLOW AND STORMWATER DISCHARGE
1. THE SITE SEEKS TO AVOID THE GENERATION OF STORMWATER RUNOFF BY AVOIDING, TO THE EXTENT
I IP , / 2012), WHICH CONTAINS IMPORTANT INFORMATION ON THE PURPOSE AND INTENT OF THE
I II /
/ PRACTICABLE, ANY GROUND LEVEL IMPERVIOUS AREAS.
STORMWATER MANAGEMENT STRATEGY FOR THE SITE.
J 2. THE OCCURRENCES AND MAGNITUDE OF SURFACE RUNOFF EVENTS FROM THE SITE ARE REDUCED
/
I ill II I 2. PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN
ACCORDANCE WITH ASI547-200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT
AS A RESULT OF RETENTION OF PERVIOUS SURFACES, AND THE DETENTION, INFILTRATION AND
) REUSE OF RUNOFF.
.
I 1/1 ( I /
I
LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION
ZONES. POST-CONSTRUCTION INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE
3. PREDEVELOPMENT SURFACE RUNOFF IS ESTIMATED AT 1.8 MLNR, REDUCING TO 1.3 MLNR POST
DEVELOPMENT. PEAK DISCHARGE IS EXPECTED TO REDUCE FROM 270 US TO 220 US.
/
/ I’I /I LOCATIONS, AND RESULTS ARE TO BE WITHIN 25%OF EXISTING RATES. RESULTS ARE TO BE
\ JI f~ I \
\
3.
SUBMITIED TO THE SUPERINTENDENT.
THE NATURAL INFILTRATION RATE OF THE SITE IS TO BE MAINTAINED IN ALL LOCATIONS. THIS IS
4.
5.
THESE ESTIMATES ARE CONSERVATIVE AS THEY DO NOT ACCOUNT FOR THE LANDSCAPE
DEPRESSION AT THE FRONT OF THE SITE.
SHEET FLOW ACROSS THE FOOTPATH IN THE LOT FRONTAGE IS EXPECTED TO BE RARE AND OF
I II,d \
I
IMPORTANT TO SUPPORT THE STORMWATER MANAGEMENT STRATEGY FOR THE SITE. THE ONLY
EXCEPTIONS TO THIS ARE:
SHORT DURATION, AS THE SITE SOILS HAVE AN INFILTRATION RATE OF 170 MM’HR WHICH IS GREATER
THAN THE 100YR ARI26 MIN RAINFALL INTENSITY OF 163 MMlHR. FOR A FLOW OF 220 US, THE FLOW
\ III I a. BUILDING FOOTINGS
DEPTH SHOULD TO NOT EXCEED A DEPTH OF 0.05 M, VELOCITY OF 0.3 MIS OR VELOCITY DEPTH
I b. BUILDINGS WHICH ARE SLAB-ON GROUND CONSTRUCTION.
PRODUCT OF 0.01 M’/S. BASED ON QUDM2013, THE LIKELIHOOD OF THIS IS CONSIDERED ’POSSIBLE’
\ :11 II c. THE CONCRETE CROSSOVER AND THE DISABLED CAPRPARKING BAY AND ITS CONCRETE
AND THE CONSEQUENCE IS CONSIDERED VERY MINOR’, LEADING TO A LOW RISK RATING. THE RISK
\ SURROUND WHICH WILL HAVE IMPERMEABLE SURFACES.
1II, II II; 4. THE CONTRACTOR IS TO SUBMIT DETAILED WORK METHOD STATEMENTS TO THE SUPERINTENDENT
6.
WILL BE LOWER THAN EXISTING CONDITIONS.
THE REQUIREMENT FOR A LAWFUL POINT OF DISCHARGE IS MET BY AVOIDING ANY INCREASE IN
II11 II .
:1111// FOR APPROVAL THAT CLEARLY DOCUMENT HOW THE INFILTRATION RATE OF SITE SCILS WILL BE
PRESERVED. THIS WILL INCLUDE DETAILS ABOUT:
STORMWATER DISCHARGE, AND ALLOWING ANY OVERLAND FLOWS TO PASS ACROSS THE
’/fll/’ ’/11 ALLOTMENT FRONTAGE AS SHEET FLOW INTO THE ROAD RESERVE AS IT OOES IN ITS CURRENT,
/1 a. HOW THE SITE WILL BE ACCESSED AND HOW POTENTIAL COMPACTION FROM VEHICLE AND
Ii II I’ll III//’(
/ ,
UNDEVELOPED STATE. NO FORMAL CONNECTION TO THE PIPED DRAINAGE SYSTEM, NOR KERB AND
I PLANT MOVEMENT WILL BE MANAGED
I II CHANNEL DRAINAGE SYSTEM, IS NECESSARY.
l’ II IIY/III/II’ b. HOW THE INFILTRATlON SYSTEMS BENEATH BUILDINGS WILL BE CONSTRUCTED, AND
PROTECTED FROM CONSTRUCTION DEBRIS
I
I
/
!
l’l/II"
I,’II Ii’
c. HOW LIQUID, SLURRY AND FINE PARTICULAR MATERIALS WILL BE HANDLED
d. RECTIFICATION MEASURES TO RESTORE PRE-DEVELOPMENT INFILTRATION RATES WHERE
II Y/I;’/I/I,’ NECESSARY.
;1//’l"
II/’l/
~ 11’l/ PROPOSED STRUCTURAL ELEMENT -
~
~
;f
1/ REFER TO STRUCTURAL DRAWINGS
FOR DETAILS
~ ~\ llN 2
z SOAKAGE PIT AREA’S
f \ BATTER MAX ~
E
~ PROPOSED ROOF MIN REQUIRED SOAKAGE
o BUILDING NAME
AREA(m’) AREA(m’) (MIN 10%)
~ RETREAT 271 27
NOTE
~ tTHis DRAWING TO BE READ IN CONJUNCTION
AMENITIES 69 6.9
WITH STANDARD NOTES ON COOl
i o
. .
..... ,
:.,
" KNOWLEDGE 122 22.2 2. THIS DRAWING TO BE READ IN CONJUNCTION
:;; WITH ALL OTHER CONSULTANTS DRAWINGS
o "
~ ......,
~. ! :~ 95 9.5
..
.".. SOUND
S _.~ ~
"
....
:.;,:,’. ’.~.. ~ .~. !.,;’:::: EAT 100 10
01 0....
SCALE 1:10 0.2 0.3
f ~ NO FILTER CLOTH TO GRAVEL DRAINAGE TO BE 2-5mm
- SUPPORT 221 22.1
! ’
_
-
~
GIRRAWEEN COURT BE USED TO BASE OR
SIDES OF TRENCH
CLEAN, WASHED NO FINES GRAVEL
COVERED WALKWAY 169 16.9
SCALE 1:25
, , ,
500
I , , ,
l000mm
, I
-
--
SCALE 1:100 ...
i NOT FOR ONSTRUCTION
-
CREATE 351 35.1
TYPICAL DRAINAGE TRENCH SECTION
SCALE 1:200 8m
SCALE 1’25
~ REV DATE DESCRIPTION DESlGN ORA.... CHECKED APPROVED OPEa PROJECT
NOOSA FLC DRAWNGTlTLE
STORMWATER LAYOUT PLAN SCAlES
A 25-09-2012 PREUMINARY ISSUE PS PS 1:250 @A1
I
~
~J BLIGH TANNER
a.. CONSULTING ENGINEERS
B
C
17.{)5-2013
13-00-2013
FOR REVIEW
OPERATIONAL WORKS
PS
PS
PS
PS
CR
CR
CR
CR
LOCATION
2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD ARCHITECT JOB NO
FULTON TROTIER 2012.164.200
~ LEVEL 9, 269 ’MCKHAM STREET, PO BOX 612
QRAWNGNO REVISION
1
FORTITUDE VALLEY OLD 4006 AUSTRAliA CLIENT ASSOCIATE CONSULTANT
T 07 3251 8555 F 07 3251 8599 FULTON TROTIER
C400 C
ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS (GRAPHIC,ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING)WlTHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRI CTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 - Application Plans, Bushfire Management Plan and Fire and Evac Plan - OPW13/0463Related documentApplication case desk ↗
About this file
- File size
- 76.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.