In light of the above, it is requested that:-

+ Condition 41 be amended to reflect the updated management plan and the
required additional changes as outlined in amended Condition 42 (refer comment
below). Given that operational works approval has been issued it is requested
that a new ‘trigger’ be included for the submission of an amended management
plan. It is further requested that any amendment to the document be able to
comprise an annexure to the current endorsed document

+ Condition 42 be amended to both: recognise the fulfilment of previously required
amendments and the further amendments to the management plan necessitated
by the proposed changes to the Conservation Residential allotments and current
planning requirements pertaining to koala ropes.

Condition 43 and Condition 44

43. The development shall be undertaken in accordance with the Landscape
Management Plan prepared by EDAW Gillespies and dated October 2004 and
as may be amended by these conditions. An amended Landscape
Management Plan incorporating the required amendments shall be lodged for
approval prior to issue of a Development Permit for Operational Works.

44, The following corrections and amendments shall be incorporated into the
Landscape Management Plan:

An amended Landscape Management Plan has previously been provided to Council
reflecting the requirements of these conditions. In correspondence dated 29
November 2005, Council endorsed “Landscape Management Plan; Issue H dated
August 2005 prepared by Edaw Gillespies’. Further (minor) amendments will be
required to this document by virtue of proposed changes to the Conservation
Residential allotments.

In light of the above, it is requested that:-

» Condition 43 be amended to reflect the updated management plan and the
required additional changes as outlined in amended Condition 44 (refer comment
below). Given that operational works approval has been issued it is requested
that a new ‘trigger’ be included for the submission of an amended management
plan. It is further requested that any amendment to the document be able to
comprise an annexure to the current endorsed document

+ Condition 44 be amended to both: recognise the fulfilment of previously required
amendments and the further amendments to the management plan necessitated
by the proposed changes to the Conservation Residential allotments.

Condition 49 and Condition 50

49. A Stormwater Management Plan for the site including revegetation and
remediation of all water treatment areas including swales and bioretention
systems shall be prepared to the reasonable satisfaction of Council. The
Stormwater Management Plan shall be generally in accordance with WBM's
Report of 30/3/03.

Page 8 of 10

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.