23616 DA - Change a Development Approval [As Published] · 132003.221132.4
50. The developer shall comply with the Stormwater Management Plan and the operational stage components of the Stormwater Management Plan shall be referenced in the community management statements for all group housing developments over the site. It is requested that the content of these conditions be consolidated into one condition given the proposal to delete the group housing component from the Conservation Residential allotments. Condition 60 60. Following development of the site, the vegetation in the gullies shall be monitored annually by a suitably qualified person (terrestrial ecologist) for three (3) years so as to detect any adverse effect due to rainwater tanks harvesting water that would normally flow into the gullies and sustain the vegetation. Monitoring of the vegetative conditions of the gullies shall include maintaining summer and winter photographic records at several key locations (at least 3 per gully) in each gully, which will be maintained for the duration of the monitoring period. The sites chosen for monitoring, shall be representative of the major vegetation species present in the gully, and also of those species which may be prone to changes in the hydrological regime of the gully. Details of site inspections, including photographic records shall be included in a half yearly report to be maintained by the site’s Body Corporate. These reports will be forwarded to Council. If adverse effects are evident, the water harvesting rates by the rainwater tanks shall be modified to overcome or other appropriate contingency measures undertaken to rectify the problems. Given the proposed changes to the Conservation Residential precinct allotments, a Body Corporate will no longer be in place for this land, and the referenced land is proposed to comprise Public Open Space. As such, amendments to water harvesting techniques in terms of rainwater tanks will not be feasible and alternative measures will need to be undertaken in instances where adverse effects are evidenced in the monitoring programme. It is requested that this condition be amended to reflect same. It is further requested that an alternate monitoring period be included aligning with the final off maintenance period of the relevant area / stage. This will provide both Council and the applicant with a definitive trigger for final compliance with this condition. Condition 65 65. The Lot Reconfiguration for the residential areas will be in accordance with the following Plans by PMM Group and as may be amended by these conditions: 65.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1 to 4; and 65.2 Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2 March 2004. It is requested that this condition be amended to require the submission of amended plans reflecting the proposed changes to the Conservation Residential allotments. Page 9 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.