Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

-13-

 

Plan:

Sediment and Erosion Control

45.37. Detailed staged Sediment and Erosion Control Plans are to be prepared for the site*
and shall be prepared to the reasonable satisfaction of Council and in accordance
with the Institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil
and Sediment Control’ (June 1996) and in particular using Checklist No. 3 from that
document. The sediment and erosion contro! plans shall cover all development on
site (during the construction, establishment and operational phases) including
rehabilitation and remediation.

46.38. The Sediment and Erosion Control Plans will deal with the staging of the
development generally in accordance with W8M's Report 'Lensworth Lake Doonella —
Stormwater and Water Quality Management Plan — Version 2, Revision 3' of 30/3/03.

4739. The Sediment and Erosion Control Plans shall also include the Public Open Space
area and shall:

47439.1. Identify existing erosion problems, and

 

47:2,:39.2. Specify appropriate remedial! treatments.

48.40. The residential precincts shall be designed to incorporate, within their boundaries all
the necessary sediment and erosion contro! devices.

 

Stormwater Management Plan

49-41. A Stormwater Management Plan for the site including revegetation and remediations - - -
of all water treatment areas including swales and bioretention systems shall be
prepared to the reasonable satisfaction of Council. The Stormwater Management
Plan shall be generally in accordance with WBM's Report of 30/3/03.

The developer shall comply with the Stormwater Management Plan. wore

50-The-developer-shalt-comply_with the Stormwater Management Plan-and the-operationale - - -
stage-compenents-of the-Stermwater Management Plan-shall_be-referenced-in_the
community management -statementstorall group-heusing developments-over the site,

5442. Key water quality objectives to be reflected in the Stormwater Management Plan are
the protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastem
creek and within the receiving waters of Lake Doonella and the Noosa River, as well
as primary contact recreational standards within the receiving waters. Appropriate
water quality standards to be adopted are those as specified by Brisbane City Council
(in conjunction with the South East Queensland Regional Water Quality Management
Strategy).

 

 
 
   

- 7 Formatted: Bullets and
Numbering

Formatted: Bullets and
Numbering

 
 

Formatted: Indent: Left: 1
cm

Formatted: Bullets and
Numbering

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.