-14- §2.43. Stormwater Management - MUSIC modelling; Prior to the completion of the final stormwater management plan and the civil design drawings for operational works, any stormwater management assessments utilising the CRC for catchment hydrology's MUSIC modelling system must be corrected for a possible error in the assessment of bio-retention system efficiencies and performance in removal of Nutrients, as recently notified by the CRC. Empirical calculations such as the Brisbane City Council spreadsheet method shall be use to adjust the MUSIC model and to demonstrate that realistic removal efficiencies are being used. Alternatively, once a 'patch' is available from the CRC, this corrected version of the software can be used, but, again, cross checking with empirical calculations is required. The error in the bioretention routine will result in the need for additional water quality treatment measures. Initia! assessments indicate that MUSIC is over predicting removal by as much as twice what should be occurring.’ If these checks indicate that the bioretention devices require entarging, the applicant shail remove lots, if necessary, from the development in order to accommodate the devices without affecting the public and private open space areas. If the system requires amending, an amended report is to be submitted to Council for checking. 53.44, Monthly reports on monitoring, incidents, corrective action and plan updates are*~ ~~ Nemeetat Bullets and required to be submitted to Council. These reports are to be submitted in a form acceptable to Council and are to highlight any non-standard results. 84-45. Any stormwater outlet to the gullies on the site are to be stabilised with appropriate energy dissipation and local armouring. Regular monitoring of creek erosion is required with appropriate corrective action specified to ensure a stable creek system. All work to be undertaken to minimise impacts on the Environmental Values of the creek system. 55-46. The residential precincts shall be designed to incorporate, within their boundaries, all the necessary stormwater and water quality control devices associated with the development. 56.47, The applicant will ensure that all necessary overland flowpaths for Q100 events are provided on site and covered by an easement where they traverse private property. Water Quality 5248. The Developer is to install water quality control devices generally in accordance withs - - - the Stormwater Management Plan. Detailed staging plans and specifications, based Numbering on and generally in accordance with the Plan are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. Drainage 58.49. The Developer is to complete the drainage works progressively in conjunction withe - - - development of the site and generally in accordance with the approved Stormwater Numbering Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Pian, the EMP and these Conditions, are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. 59-50. All drainage works as required by the Drainage Plan are to be provided by the developer at its own cost.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.