Skip to the record
Every meeting, every word.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

-18-

 

78,69. Prior to endorsement of the Plan of Survey for each Stage, a State Survey Mark+-  - { Formatted: Bullets and
shall be provided within the Stage. It shall be fevelled and located to the requirements Numbering
of the Manager - Land Development. A ‘Form 6° shall be submitted for Council's
records.

Each State or other Permanent Survey Mark shall be installed clear of overhead
vegetation, making it suitable for Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered Surveyor.

Contributions

79:70. The applicant shall pay to Council a contribution toward the cost of upgrading thes - - - { Formatted: Bullets and
intersection of the new road and Beckmans Road (this contribution is $64,075, at Numbering
December 2002, which will be adjusted by CPI current at the date of payment). If the
intersection at Beckmans Road requires upgrading prior to Council's planned
construction date of these works, the developer shail undertake the necessary works
at its own cost instead of making the contribution.

Dedications
80.71. The public open space areas, apart from the area adjacent Beckmans Road, ands - - - | Formatted: Bullets and
the area adjacent the Conservation Residential allotments and wildlife corridor shall Numbering

be dedicated to the Crown prior to the sealing of the first completed Stage in the
Staging Plan of the development. The public open space area adjacent Beckmans
Road and wildlife corridor shall be dedicated to the Crown prior to the sealing of
Stage C in the Staging Plan of Development. The public open space area adjacent
the Conservation Residential allotments shall be dedicated to the Crown upon
completion of the vegetation monitoring required by Condition 51. The public open
space will be in the condition required by the Open Space Management Plan.

Headworks
84.72, For the residential component, contributions shall be paid to Council in accordances - - - { Formatted: Bullets and
with Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks Numbering

Contributions and Sewerage Headworks Contributions respectively and at the rates
applicable at the time of payment.

An estimate only of the contribution rates as of December 2004 under the current
policies is as follows:-

Stage A
Water Supply $285,909

Sewerage $258,488
TOTAL $544,397
Stage B

Water Supply $237,429
Sewerage $207,979

TOTAL $445,408

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.