-19- Stage C Water Supply $208,527 Sewerage $181,239 TOTAL $389,766 Stage D Water Supply $17,093 Sewerage $14,856 TOTAL $31,949 With regard to Stage D, the future development of the Forest Cluster Precinct will attract further contributions that will be assessed at the time of the future applications. Headworks contributions shall be paid prior to Council endorsement of the Plan of Survey for each Stage of the reconfiguration. Roads 82.73. All roads shall be constructed generally in accordance with the layout indicated one - - - Plan of Development prepared by PMM, Drawing Number 4740-56b dated 21 June Numbering 2004 and the conditions contained in this approval. 83-74. The road to the east that will connect to Swanbourne Way ultimately shall have a 20 metre wide road reserve between the entry road and Lot 6 on RP 80412 and can reduce to 16 metre wide road reserve along the eastern frontage of proposed lots 124 and 125. This road shall have an 11 metre wide pavement (kerb to kerb) for its full length. 84.75. All new roads will be required to comply with Council requirements for carriage widths. The road design may not be strictly in accordance with Council's Engineering Standards but this is because of the required incorporation of swales, vegetation retention and pedestrian/bikeway paths and will be to the satisfaction of Council. 85.76. The access to the new school shall be in accordance with the approved drawings in Development Permit 23468 DA. This roundabout will also service the contemporary parcels on the east of the development. Council may consider a separate egress point from the school site if Australian Standards requirements for sight distance and a traffic loads analysis indicates that roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April 2003 have enough capacity to cater for the increase in traffic generated by this modification. 86.77. The developer will also be required to undertake the necessary modifications to the existing school’s access and car parking in accordance with Eraland Consulting Pty Ltd Drawing Nos. 01691-1 Amdt D, 01691-2 Amdt E and 01691-3 Amdt D Dated July 2003. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about programming of construction.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.