96-86. The developer will also be required to pay a contribution towards the construction of
the bikeway link to the Lake Entrance Boulevard Network. The amount of the
contribution shall be calculated at the rate current at the date of payment, subject to
CPI changes. The contributions payable for each Stage (prior to endorsement of the
Plan of Survey for that Stage) at December 2004 are:

Stage A - $21,944;
Stage B - $17,456;
Stage C - $15,461; and
Stage D - $1,247.

With regard to Stage D, the future development of the Forest Cluster Precinct will
attract further contributions that will be assessed at the time of the future applications.

Sewer

96:87. The sewer network shall be generally in accordance with the approved ‘Sewerage - - -

Reticulation Master Plan’ - Drawing 01691-130B by Eraland Consulting.

9788. Design for a sewerage system to connect all new lots within the site to Council's
existing sewerage reticulation system shall be to the standards and requirements set
out in Council's Engineering Design Standards. {f the design requires the construction
of a pump station and a rising main, the connection point to Council's existing system
will be nominated by the Manager - Land Development.

98.89. Detailed design drawings and calculations shall be submitted with an application for
a Development Permit for Operational Works in respect of water or sewer works. To
avoid conflict with other underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.

99.90. All connections to sewer system shall be carried out either by Council or by a
Council approved Contractor and at no cost to Council. Any connection to a water
main shall be undertaken by Council.

Water

400-91. The water supply network shall be generally in accordance with the<-- -

approved ‘Water Supply Master Plan’ - Drawing 01691-140C by Eraland Consulting.

404-92. An application for a Development Permit for Operational Works for services
shall be obtained prior to commencement of works.

492-93. A reticulated water supply system shall be provided to connect to Council's
existing systems, including a metered water connection to the property boundary of
each proposed new lot within the site. All fees for the supply of water meters shall be
paid to the Council.

403.94. Fire hydrants are to be provided throughout the development in accordance
with Council and Queensland Fire Service standards.

4.04.95. Provision shall to be made in all parks locations for a water connection and
should conform to the recommendations of the Bushfire Management Plans. Under-
toad service conduits shall be provided to ensure a connection is available.

Formatted: Bullets and
Numbering

Formatted: Bullets and
Numbering

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.