Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
-20- 8778. Access to each lot shall be constructed to the standards and requirements of the Council. 88.79. The following frontage works shall be constructed across all road frontages within the site:- 88479.1. Construction of new kerb; 88.2.79.2. Vehicular access to each lot; 88.3:79.3. Associated stormwater drainage, generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02.; 88.4.79.4. New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 88-5-79.5. Hot mix correction to existing pavement as required; 88.6.79.6. Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the footpath alignment. 88:7,79.7. The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works. 89:80, Alterations to lot sizes, number of lots and layout may be required following thes -- - issue of a Development Permit for Operational Works in respect of the internal roadworks design. 99.81. The developer will construct industrial strength crossovers to two parcels at the end of the proposed cul-de-sacs to enable the largest service vehicle to do a three point turn and leave the street in a forward direction. This will be included in an operational works application. Bikeways/Pedestrian Paths 9482, The developer will construct a path along the Beckmans Road frontage of existings - - - Lot 7. The Beckmans Road and new road bikeways should be constructed generally as indicated on Eppell Olsen & Partners Drawing No 3866-003 Issue A dated October 2002. The bikeway on the Beckmans Road frontage may need to be aligned within the open space area but any alignment would require vegetation retention. 92.83. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed Lots 109 -110 to the northern constructed end of Swanbourne Way in the form of a path and timber bridge 2 metres wide. 93:84. Internally (that is the area of the development north of Plan 3866-003) the bikeway network should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03 with the exception of bikes being allowed in the open space area except the Swanbourne Way crossing. The pedestrian paths indicated in the open space on the plan will need to have their alignment and need agreed to in the Open Space Management Plan. 94.85. The developer will also construct a bikeway within the site along the road that allows connection to the new road linkage, through the parcel to the east, to Swanbourne Way required by this permit. Formatted: Bullets and Numbering Formatted: Bullets and Numbering
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.