23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

-20-

 

8778. Access to each lot shall be constructed to the standards and requirements of the

Council.
88.79. The following frontage works shall be constructed across all road frontages within

the site:-

88479.1. Construction of new kerb;

88.2.79.2. Vehicular access to each lot;

88.3:79.3. Associated stormwater drainage, generally in accordance with
WBM's Report of 2/10/02 and as subsequently modified in their letter to Council
of 14/11/02.;

88.4.79.4. New stormwater management to correct the current problem of
stormwater discharge from the road reserve to the Noosa Primary School;

88-5-79.5. Hot mix correction to existing pavement as required;

88.6.79.6. Concrete bikeways/footpaths. The Developer is advised to contact

Council to obtain the footpath alignment.

88:7,79.7. The remaining footpath area shall be formed, topsoiled and turfed,
and planted with trees.

A Development Permit for Operational Works shall be obtained prior to undertaking
these works.

89:80, Alterations to lot sizes, number of lots and layout may be required following thes -- -

issue of a Development Permit for Operational Works in respect of the internal
roadworks design.

99.81. The developer will construct industrial strength crossovers to two parcels at the end
of the proposed cul-de-sacs to enable the largest service vehicle to do a three point
turn and leave the street in a forward direction. This will be included in an operational
works application.

Bikeways/Pedestrian Paths

9482, The developer will construct a path along the Beckmans Road frontage of existings - - -

Lot 7. The Beckmans Road and new road bikeways should be constructed generally
as indicated on Eppell Olsen & Partners Drawing No 3866-003 Issue A dated October
2002. The bikeway on the Beckmans Road frontage may need to be aligned within
the open space area but any alignment would require vegetation retention.

92.83. The developer will construct a pedestrian/bikeway linkage in the vicinity of proposed
Lots 109 -110 to the northern constructed end of Swanbourne Way in the form of a
path and timber bridge 2 metres wide.

93:84. Internally (that is the area of the development north of Plan 3866-003) the bikeway
network should be as indicated on Plan 6812-39 by PMM Group dated 13/02/03 with
the exception of bikes being allowed in the open space area except the Swanbourne
Way crossing. The pedestrian paths indicated in the open space on the plan will need
to have their alignment and need agreed to in the Open Space Management Plan.

94.85. The developer will also construct a bikeway within the site along the road that allows
connection to the new road linkage, through the parcel to the east, to Swanbourne
Way required by this permit.

Formatted: Bullets and
Numbering

Formatted: Bullets and
Numbering

 

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.