-23- 443-104. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works, which shall be submitted in conjunction with an application for a Development Permit for Operational Works. In this regard a DXF/OWG file an GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any application for Operational Works. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au ). 444.105. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council’s records. The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. General 445.106. All Class 1, Class 2 and Class 3 pest plants declared under the Lands - -- Protection (Pest and Stock Route Management) Act 2002 are to be controlled on the Numbering site prior to Council endorsement of the plan of survey. In this context “controlled” shall mean, for class 1 and 2 pests, completely eradicated. For class 3 pests it shall mean removal of the plants where they threaten environmentally significant areas of the site such as riparian zones and areas of natural vegetation. Where class 3 plants are removed as a result of this condition and there is not sufficient natural regeneration of native species, the areas shall be replanted with endemic native species so that a sustainable natural ecosystem is restored. Council's Conservation Management Supervisor will not inspect the site until 30 days after the weed treatment and replanting is complete. 446-107. The following steps shall be undertaken prior to commencement of any* ~~~ construction:- 446-4:107.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of intention to commence works. 446-2-107.2. The Principal Contractor or any of his subcontractors shall not undertake any works unless each contractor has public liability insurance in the sum of $10,000,000 and copies of current public liability insurance policies are submitted to Council's inspector. 446:3-107.3. The Principal Contractor shall nominate a site representative and give a telephone number that can reach the site representative at any time during a 24-hour day. 116.4.107.4. _ The site representative shall arrange to meet on-site with Council's Inspector to obtain Council's requirements for construction of access. 446-5-107.5. All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Department of Transport (Main Roads Division) Roadworks Signing Guide.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.