444108. Prior to excavating any material to be used for fill on this site, a Development
Permit for Operational Works shall have been obtained for the site from which the
excavated material is taken. A soil report shall be submitted with the application
certifying that the material is free of acid sulphate soils and other deleterious
materials.

448-109. The transportation of all materials to and from the site shall be undertaken in
a manner such that no particulate matter escapes onto a public road. All vehicles
carrying materials either to or from the site shall be covered to prevent materials
including dust being windblown from the vehicle.

449-110. A program of works is to be submitted at the Prestart meeting detailing the
construction schedule and proposed environmental protection measures.

Where the program is changed for any reason whatsoever, a copy of the revised
program shall be submitted to Council's Works Inspector within seven (7) days.

420.111. For the following classes of work associated with development, a+---
Development Permit for Operational Works must be obtained prior to commencement
of works relating to that class of work. The application may combine any or all of
these classes of work:

420-4-111.1. Site Civil Works;
420-2-111.2. _ Roadworks;
420-3-111.3. Stormwater Drainage;
420-4-111.4. _ Frontage works;

420-5-111.5.___ Sewer reticulation including new mains, relocations, diversions, pump
stations and rising mains;

420-6-111.6. Water reticulation;
420-4111.7. Site Filling;
429-8-111.8. _ Excavation of materials to fill another site; and
420:9-111.9. Landscaping.

424.112. Operational works shall be carried out in a manner that prevents:
424-4+112.1. Pollution of a waterway;
424-2,112.2. _ Dust/sand nuisance to residents in the vicinity;
424:3-112.3. Transfer of dirt and debris onto a public road;

424.4.112.4. Excessive noise (less than 1.5 Dba above ambient measured at the
lot boundaries);

424-5-112.5. Excessive traffic delays (less than 5 minute delays); and

424:6:112.6. _ Diminution of neighbourhood amenity (long term parking of
employees vehicles, parking of construction equipment etc.).

422-113. A traffic management plan shall be submitted in conjunction with a
Development Permit for Operational Works involving road or drainage works. The
plan shall address all phases of construction to be undertaken on site.

Formatted: Bullets and
Numbering

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.