Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
water quality protection; ground water protection: air quality protection; acid sulphate soil management; storage and handling of hazardous substances: noise and vibration management; waste management; cultural heritage management; visual amenity protection; bushfire control; © environmental emergencies; © community liaison. 60-56. The Developer shall comply with development. eBM all dn-a foranygroup-housing-development overthe-site, the EMP during Sediment and Erosion Control Plan §1:57.Detailed staged Sediment and Erosion Control Plans are to be prepared for the site and shall be prepared to the reasonable satisfaction of Council and in accordance with the institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Contro!’ (June 1996) and in particular using Checklist No.3 from that document. The sediment and erosion control plans shall cover all development on site (during the construction, establishment and operational phases) including rehabilitation and remediation. 62:58. The Sediment and Erosion Control Plans will deal with the staging of the development generally in accordance with WBM’s Report ‘Lensworth Lake Doonella — Provision of further Stormwater and Water Quality Advice — Version 2' of 2/10/02. 63-59. The Sediment and Erosion Control Plans shall also include the Public pen Space area and shall: 63-459. 1. identify existing erosion problems, and 63.2.59.2. Specify appropriate remedial treatments. §460.The residential precincts and the school site shall be designed to incorporate, within their boundaries all the necessary sediment and erosion control devices. Stormwater Management Plan §§-61.A Stormwater Management Plan for the site including revegetation and remediation shall be prepared to the reasonable satisfaction of Council. The Stormwater Management Plan shall be generally in accordance with WBM’s Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02. The developer shall comply with the Stormwater Management Plan. -14- * 7-7” 7 Formatted: Bullets and Numbering *-- >" 7 Formatted: Bullets and Numbering * 7-7”) Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering *) Formatted: Bullets and Numbering **— > 7 Formatted: Bullets and Numbering *- 7" ~ 4 Formatted: indent: Left: 1 cm eee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.