Skip to the record
Accept no substitutions.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

water quality protection;
ground water protection:
air quality protection;
acid sulphate soil management;

storage and handling of hazardous substances:
noise and vibration management;

waste management;

cultural heritage management;

visual amenity protection;

bushfire control;

© environmental emergencies;
© community liaison.

60-56. The Developer shall comply with

development. eBM all dn-a
foranygroup-housing-development overthe-site,

the EMP during

Sediment and Erosion Control Plan

§1:57.Detailed staged Sediment and Erosion Control Plans are to be prepared for the site
and shall be prepared to the reasonable satisfaction of Council and in accordance with
the institution of Engineers Australia ‘Engineering Guidelines for Queensland Soil and
Sediment Contro!’ (June 1996) and in particular using Checklist No.3 from that
document. The sediment and erosion control plans shall cover all development on site
(during the construction, establishment and operational phases) including rehabilitation
and remediation.

62:58. The Sediment and Erosion Control Plans will deal with the staging of the development
generally in accordance with WBM’s Report ‘Lensworth Lake Doonella — Provision of
further Stormwater and Water Quality Advice — Version 2' of 2/10/02.

63-59. The Sediment and Erosion Control Plans shall also include the Public pen Space area
and shall:
63-459. 1. identify existing erosion problems, and

63.2.59.2. Specify appropriate remedial treatments.

§460.The residential precincts and the school site shall be designed to incorporate, within
their boundaries all the necessary sediment and erosion control devices.

Stormwater Management Plan

§§-61.A Stormwater Management Plan for the site including revegetation and remediation
shall be prepared to the reasonable satisfaction of Council. The Stormwater
Management Plan shall be generally in accordance with WBM’s Report of 2/10/02 and
as subsequently modified in their letter to Council of 14/11/02.

The developer shall comply with the Stormwater Management Plan.

-14-

 

* 7-7” 7 Formatted: Bullets and
Numbering

*-- >" 7 Formatted: Bullets and
Numbering

* 7-7”) Formatted: Bullets and
Numbering

Formatted: Bullets and
Numbering

Formatted: Bullets and
Numbering

*) Formatted: Bullets and
Numbering

**— > 7 Formatted: Bullets and
Numbering

*- 7" ~ 4 Formatted: indent: Left: 1
cm

  
  

eee

   
  

 

 

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.