Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

* >>> 1 Formatted: Bullets and
FA vt Numbering
82.62. The Stormwater Management Plan shail take into account matters specified in section « - - - (Formatted: Bullets and
19.4 of the Environmental Protection (Water) Policy 1997. Numbering

 

68-63.Key water quality objectives to be reflected in the Stormwater Management Plan are « - - - -{ Formatted: Bullets and
the protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastern Numbering
creek and within the receiving waters of Lake Doonella and the Noosa River, as well as
primary contact recreational standards within the receiving waters. Appropriate water
quality standards to be adopted are those as specified by Brisbane City Council (in
conjunction with the South East Queensland Regional Water Quality Management

Strategy).

69.64. The Stormwater Management Plan for the site shall address: + ~~~ Formatted: Bullets and
69:+.64.1.___——Construction, establishment and operational phases. enee mre Ballet ana
69-2-64.2. The establishment and operational phases for the project, atleast = +- ~_ Murbering

Formatted: Bullets and

two per year event and three monthly campaign based water quality monitoring Numbering

within the gullies of the site, in the two creeks and in the receiving waters for:

 

69:2-4.64.2.1. Tota! Nitrogen Formatted: Bullets and
Numbering
69,2-2.64.2.2. Total Phosphorus Formatted: Bullets and
. a Numbering
69.2:3-64.2.3. Suspended Solids & Turbidity Formatted: Bullets and
Numbering
69:2-4.64.2.4. PH
OO Formatted: Bullets and
60:2.6.64.2.5. Salinity Numbering
Formatted: Bullets and
69.2.6.64.2.6. Temperature __ (Aumbering
Formatted: Bullets and
69.2-764.2.7. Dissolved Oxygen Numbering
Formatted: Bullets and
68-28-64 .2.8. Trash & gross pollutants Numbering
. . . Formatted: Bullets and
69.2:9:64.2.9. Algae count and identification Numbering

. Formatted: Bullets and
69-2-40-64.2.10. _ Faecal coliforms Numbering

The developer shall continue monitoring for a period of 3 years from completion of the Formatted: Bullets and
final stage of construction. 9

 

 

69.3 For the establishment and operational phases the developer is to undertake
inspections for erosion and deposition, and build up of trash and gross
pollutants, and other water pollution. These inspections will be carried out after
significant rainfall events, and on a three monthly campaign basis for a period of
three years from completion of the final stage of construction.

69.4 For the construction phase at least two per year event and monthly campaign
based water quality monitoring shall be undertaken for:

o Suspended Solids & Turbidity

o Temperature

-18-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.