74-Fera year in-which the-rainfalis the median of wetter than average years or the median of- - - - { Formatted: Bullets and
saity the bed i eh i Numbering

   
  

 
  
 

recharge} of the-satchments-of the three significant gullies. onthe-site- will not ehange
6 8%-frem-theirp conditientaking4 nsidera olimne

Acid Sulphate Soils Management Plan

75.69.An Acid Sulphate Soils (ASS) Management Plan must be provided for any excavation « - - -

#6-70.The staging of the Lot Reconfiguration for the residential areas will be in accordance « - - - { Formatted: Bullets and
with the Plan titled “Staging Plan” by PMM Group — Reference 4740-57 and dated 21 Numbering

#471. This Preliminary Approval for material change of use of premises and reconfigure a lot < - - -

#8-72.The developer must obtain all of the other Development Permits referred to in the

79:73.Security in the form of a cash bond or trading bank guarantee to the sum of $400,000 + - - - { Formatted: Bullets and
must be submitted, to secure performance of all conditions of this approval, prior to the Numbering

Formatted: Bullets and
works undertaken in areas of the site below 5m AHD. The Management Plan must Numbering

outline all proposed ASS Investigation and management procedures, which are to be
undertaken in accordance with State Planning Policy 2/02 “Planning and Managing
Development Involving Acid Sulphate Soils”.

Staging

January 2003.

Currency

Formatted: Bullets and
lapses if:~ Numbering

#44711. the use or erection of a building or other structure associated with thes - - - { Formatted: Bullets and
use, has not commenced by 6 February 2007, unless application is made and Numbering

approved by “Council for an extension; or

#42.71.2. the use of any premises pursuant to the Preliminary Approval + ---- Formatted: Bullets and
ceases. Numbering

General

*- ~~ 4 Formatted: Bullets and
Decision Notice, prior to obtaining a Development Permit for Building Works. Numbering

 

issue of a Development Permit for Operational Works. The cash bond or trading bank
guarantee will be reduced to $100,000 upon completion of all construction works
(except building construction) and the balance will be returned-en-satisfactery

   
 

ef-enforeing-performance-ofthis-permit following acceptance of development works off-
maintenance by Council:

 

Plan Sealing and Easements

   
    

80.74.For the purpose of these conditions, the following definitions apply:- eee
Numbering
80-4,74.1. A Plan of Survey means the plan for the reconfiguration of a lot a7 -e

required to be endorsed by Council pursuant to S3.7.1 of the Integrated Planning
Act 1997.

Formatted: Bullets and
Numbering

 

-47-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.