Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
o Salinity o Trash & gross pollutants o Dissolved Oxygen In addition to the above, inspections for erosion and deposition, and build up of trash and gross pollutants should be carried out on a weekly basis during the construction period and corrective measures implemented. 69.5 An operational phase Water Quality Management Plan shall be prepared to address water treatment device water quality maintenance requirements for stormwater management measures and devices, contingency measures for aquatic plant growth, loss of vegetation in swales and filter strips, pollution response and algal blooms and should include a mosquito management strategy. The plan shall demonstrate compliance with the water quality objectives set and a no worsening over the existing pre-development situation in the site gullies, Cranks Creek, the eastern creek and in Lake Doonella and the Noosa River. 69.6 Responsibilities are to be clearly delineated. 69.7 Non-compliance with prescribed water quality standards should trigger the implementation of measures/further testing to rectify. 69.8 Monthly reports on monitoring, incidents, corrective action and plan updates are required to be submitted to Council. These reports are to be submitted in a form acceptable to Council and are to highlight any non-standard results. 69.9 Any stormwater outlet to the gullies on the site are to be stabilised with appropriate energy dissipation and local armouring. Regular monitoring of creek erosion is required with appropriate corrective action specified to ensure a stable creek system, All work to be undertaken to minimise impacts on the Environmental Values of the creek system. 70:65.The residential precincts and the secondary school precinct shall be designed to tree incorporate, within their boundaries, all the necessary stormwater and water quality control devices associated with the development. Water Quality 44,66. The Developer is to install water quality control devices generally in accordance with + - - - the Stormwater Management Plan. Detailed staging plans and specifications, based on and generally in accordance with the Plan are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works, Drainage #2,67.The Developer is to complete the drainage works progressively in conjunction with treed development of the site and generally in accordance with the approved Stormwater Management Plan. Detailed drainage plans and specifications, based on and generally in accordance with the approved Drainage Plan, the EMP and these Conditions, are to be prepared and submitted (after consultation with officers of the Council) with the relevant applications for operational works. #3:68.All drainage works as required by the Drainage Plan are to be provided by the t--- developer at its own cost. . Water-Cycle-Management -16- Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering Formatted: Bullets and Numbering
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.