23616 DA - Change a Development Approval [As Published] · 132003.221132.4
must betaken- dewn 2 minimum ef 4m below a line ofinfluence-measuredtm-in-the
designed-by-a-registered.practicing- Geotechnical Engineerand submitted-with-any
‘ation f D 2 for Building VA :
96-83.Prior to endorsement of the Plan of Survey for each Stage, a State Survey Mark shail + - - - { Formatted: Bullets and
be provided within the Stage. It shall be levelled and iocated to the requirements of the Numbering
Manager — Land Development. A ‘Form 6' shall be submitted for Council's records.
Each State or other Permanent Survey Mark shall be installed clear of overhead
vegetation, making it suitable for Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered Surveyor.
91.1 Prior to the issue of further approvals on the site, the developer shall pay to Council a
contribution toward the cost of upgrading the intersection of the new road and
Beckmans Road (this contribution is $64,075, at December 2002, which will be
adjusted by CPI current at the date of payment) and contribute toward the major road
network in the coastal region, in accordance with Council's Braft-Coastal Major Road
Network Infrastructure Charges Plan dated March 2002 at the rate current at the date
of payment. This-willbe-inthe-form-of an-infrastructure-agreement between the
develeperand Gouncil.
the intersection-and- Beckmans Read-requiring-upgrading priorto-Couneil's-planned
canstruction-date-of these works, in-requiring the developer to-undertake the necessary
*-- 7 4 Formatted: Bullets and
Numbering
Dedications
92. The open space area shall be dedicated to the Crown prior to the sealing of the first
completed Stage in the Staging Plan of the development. The public open space will
be in the condition required by the Open Space Management Plan.
Headworks
93. For the residential component, contributions shall be paid to Council in accordance with
Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks
Contributions and Sewerage Headworks Contributions respectively and at the rates
applicable at the time of payment.
An estimate only of the contribution rates as of December 2002 under the current
policies is as follows:-
Water Supply $749,171
Sewage $592,025
TOTAL $1,341,196
Headworks contributions shall be paid prior to Council endorsement of the Plan of
Survey for each Stage of the reconfiguration. Each additional a lot shall be assessed
as a dwelling house and each group title dwelling as being a dwelling unit (3 Bed).
94. For the Secondary School site, headworks will be calculated in accordance with
Planning Scheme Policies PSP 28 and PSP 30 on Water Supply Headworks
Contributions and Sewage Headworks Contributions respectively, and required in the
-419-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.