23616 DA - Change a Development Approval [As Published] · 132003.221132.4
95. 96. 97. 98. 99. 100. 101. assessment of an application for the Material Change in Use and payable prior to any Operational Works Approvals. Roads All roads shall be constructed generally in accordance with the layout indicated on Plan of Development prepared by PMM, Drawing 4740-56b dated 21 January 2003 (as amended by condition 2) and the conditions contained in this preliminary approval. All new roads will be required to comply with Council requirements for carriage widths. The road design may not be strictly in accordance with Council's Engineering Standards but this is because the required incorporation of swales, vegetation retention and pedestrian/bikeway paths and will be to the satisfaction of Council. There will be the capacity for an eastern road link to Swanboume Way through the adjacent property. The access to the new school should be converted to one point, which is an arm ona four-leg roundabout on the new road. This roundabout will also service the contemporary parcels on the east of the development and the layout will be modified on the Plan of Development to accommodate this change. Council may consider a separated egress point from the school site is Australian Standards requirements for sight distance and a traffic loads analysis indicates that roundabout 4 on Eraland Consulting Pty Ltd Drawing No. 01691-100 dated April 2003 have enough capacity to cater for the increase in traffic generated by this modification. The developer will also be required to undertake the necessary modifications to the existing school's access and car parking in accordance with Eppell Olsen & Partners Drawing No. 3866-003 Issue A dated October 2002. The developer will have to construct the new road on an alignment that allows the school access to be constructed in accordance with this plan and will also construct the modified car park and access at the existing school. Discussion is to be held with Queensland Education about detailed design and programming of construction. Access to each lot shail be constructed to the standards and requirements of the Council. The following frontage works shall be constructed across all road frontages within the site:- 101.1.Construction of new kerb and channel; 101.2.Vehicular access to each lot; 101.3.Associated stormwater drainage, generally in accordance with WBM's Report of 2/10/02 and as subsequently modified in their letter to Council of 14/11/02.; 101.4.New stormwater management to correct the current problem of stormwater discharge from the road reserve to the Noosa Primary School; 101.5.Hot mix correction to existing pavement as required; 101.6.Concrete bikeways/footpaths. The Developer is advised to contact Council to obtain the footpath alignment. 101.7.The remaining footpath area shall be formed, topsoiled and turfed, and planted with trees. A Development Permit for Operational Works shall be obtained prior to undertaking these works.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.