Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
The changes sought are intended to streamline processes and requirements applicable to subsequent and consequential development. They are in no way intended to undermine the environmental values that underpin the project. The changes outlined below are generally in accordance, but advance upon, those amendments outlined in our letter (c/- Conics (Sunshine Coast) Pty Ltd) of May 2008. In correspondence dated 27 May 2008 (refer attached), Council indicated a generally acceptance of the proposed amendments. Please see below for a summary of the requested changes. A track changes document has been prepared highlighting proposed conditional amendments for your perusal and ease of reference. A copy of this document is attached. Condition 2 2. An amended Plan of Development shall be provided to Council within one month of Council's approval revising: 21 the ‘Key Development Requirements’ consistent with the approved Plan of Development issued with the Development Approval 22402 DA and conditions of same: 2.2 the ‘Key Development Requirements’ to incorporate the specific acoustic measures for allotments 159-171, 174 — 181 as required by condition 4. An amended plan of development has previously been provided to Council reflecting the changes outlined above. As part of the current request to change the development approval and conditions additional amendments will be required to accommodate the proposed amendments to the Conservation Residential allotments. It is requested that this condition be amended accordingly. Condition 5 5. All Dwelling houses and Dwelling units shall be designed and constructed to accord with the Residential Design Guidelines prepared by PMM Group and stamped approved, Amended Residential Design Guidelines shall be provided to Council prior to approval of Operational Works and include the following amendments:- 5.7 No dwelling house (including garage/carport) shall be located within 6 metres of the front boundary, unless approval is given otherwise by Council. 5.2 All. buildings (which does not include swimming pools or other structures that do not present a fire hazard) located on allotments adjoining either private open space or public open space shall be located in accordance with the setback requirements contained in the Fire Management Plan. 5.3 The Energy Efficiency criteria shall include the requirement for all dwelling houses to have a solar hot water system. 5.4 A provision shall be included requiring all pools constructed to be fitted with a rope to allow for a Koala to exit the pool. 5.5 Rainwater harvesting provisions shail be included for Forest Cluster Precinct, including a rainwater tank of 15kL. Page 2 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.