Skip to the record
Every meeting, every word.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

149.

150.

151.

The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation
permits and/or any other approvals required under any other Act.

Prior to commencement of work relating to a Development Permit for Operational
Works, the Applicant shall sign a written undertaking to be responsible for the full coast
of repairs to road pavement, footpath, kerb and gutter or any other Council property
damaged as a result of construction of proposed development.

if any person acting under this permit damages any Council property or facilities (such
as underground drainage, water supply and sewerage), through any cause whatsoever
in the course of directly or indirectly carrying out development, that person shall
forthwith notify manager ~ Land Development and shall forthwith rectify that damage at
its cost and to the satisfaction of the Manager — Land Development. Alternatively, the
applicant may request the Council to carry out the rectification works.

Any damage to water main shall be reflected by Council. Any damage to sewer main
shall be undertaken by either Council or a Council approved contractor.

In all cases, Council reserves the right to carry out rectification works in an emergency
and where no reasonable attempt has been made to complete the rectification works
as part of the development.

All cost incurred by Council in any rectification works shall be repaid to Council prior to
the endorsement of the Plan of Survey.

Portable Long Service Leave

Prior to the issue of a Development Permit for Operational Work, the applicant shall
comply with the requirements of the Building and Construction Industry (Portable Long
Service Leave) Act 1991. In this regard, a statutory declaration outlining the cost
building and construction works, as defined $73.(1) of the Act, shall be submitted in
conjunction with an application for Operational Works. If payment of the levy is
required, the approved forms as outlined in s77.(1), must also be sighted by the
assessment manger.

-27-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.