Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
143. 144. 145. 146. 147, 148. Designs that concentrate stormwater onto adjoining land shail require separate formal approval from the owner of the land or relevant Government Authority. Such approval shall be submitted with the design in conjunction with an application for a Development Permit for Operational Works. The design plans detailing surface levels, which shall be controlled across the site of the development to create a major storm event overland flow path system to cater for the 1:100 year design storm, shall be submitted in conjunction with the Development Permit for Operational Works. Any overland flow from external catchments shall be accepted and incorporated in the major event surface flow drainage system through the site. Overland flows shall be discharged in a safe manner and the product of velocity time depth shall not exceed 0.4m’/sec. The design plans are to show how stormwater runoff within and from the site is to be controlled both during construction and permanently. The plans are to indicate measures to be taken to prevent erosion and the export of sediment from the site and will embrace the principals set out in the Institution of Engineers Australia Engineering Guidelines for Queensland Soil Erosion and Sediment Control, June 1996. Designs shall also incorporate the principal of “no net increase” in nutrients and other pollutants from the developed site. This may require the provision of a drainage system that allows first flush (first 12mm of rainfall) to be collected and treated prior to release into the drainage system. An easement for drainage in favour of Council shall be created over the full length and width of major storm event surface flow paths within the site at no cost to Council. A dealing number for registration of the easement shall be obtained from the Land Titles Office before occupation of the site. Minimum floor level freeboard of 0.5 m shall be provided for habitable and storage areas above the top water level of the stormwater overland flows. Details of any proposed estate entrance signage shall be submitted in conjunction with an application for a Development Permit for Operational Works for either roadwork’s or landscaping. A $1500 fee shall accompany the application, The design shall conform to Councils "Signage Policy ~ Development Estate Entrance”. The proposed names of new roads (public and private) and parks shall be lodged with the application for a Development Permit for Operational Works. 148.1.Names are to be selected from any of the following categories:- 148.2.Easily pronounced words of Murri Languages. 148.3.Names or words of local significance or historical interest. 148.4. Flora, fauna, industry, topographical, geological’ and similar’ features and terms relative to the district. 148.5.Sumames of persons of merit or historical significance. (Personal names should be avoided), 148.6. Approval will not be given to a name that is the same or similar to the name of another road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that are not easily pronounced, or may cause confusion to emergency services are to be avoided. 148.7.All street signs on new roads (public and private) and parks shall be erected prior to works being accepted on maintenance. +26 -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.