All easements required on downstream properties draining the site either by way of
underground drainage or overland flowpaths shall be obtained and proof of registration
of the easements shall be submitted with the Plan of Survey.

No building or other structure shall be constructed or encroach over an easement. Any
building or structure within proximity of an easement or Council's or any other public
utility's underground infrastructure must have its foundations designed so that no
surcharge loads are imposed upon such underground infrastructure. Foundations
must be taken down a minimum of im below a line of influence measured 1m in the
direction of the foundation from the centreline of the closest underground service and
along the natural angle of repose of the foundation soil type(s).

Plans, and supportive documents, detailing these proposed foundations shall be
designed by a registered practising Geotechnical Engineer and submitted with any
application for any Development Permit for Building Works.

Registered easements are to be provided on the Plan of Survey over all sewage mains
within private property. Easements are to be equivalent in width to twice the depth to
invert level of the sewer at the deepest point within the allotment. Easements are to be
provided parallel to and centred over the water main, with a minimum width of 3.0
metres.

Registered easements are to be provided on the Plan of Survey over all water mains
within private property. Easements are to be equivalent in width to twice the depth to
invert level of the water main at the deepest point within the allotment, Easements are
to be provided parallel to and centred over the water main, with a minimum width of 3.0
metres.

Prior to endorsement of the Plan of Survey, a State Survey Mark shall be provided
within the site. It shall be levelled and located to the requirements of the Manager —
Land Development. A “Form 6” shall be submitted for Council's records.

Each State or other Permanent Survey Mark shall be installed clear of overhead
vegetation, making it suitable for Global Positioning Equipment, and accurately
connected to at least one real property corner by a registered surveyor.

Engineering Works

Prior to undertaking any excavation, the person acting on this permit shall contact
public utility service providers to ascertain the location of their underground services.

For the following classes of work associated with development, a Development Permit
for Operational W orks must be obtained prior to commencement of works relating to
that class of work. The application may combine any or all of these classes of work:-

15.1. Site Civil Works

15.2, Roadworks

15.3. Stormwater Drainage
15.4. Frontage Works

15.5. Sewer reticulation including new mains, relocations, diversions, pump stations
and rising mains

15.6. Water reticulation

-29-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.