Council archive · source document
23616 DA - Change a Development Approval [As Published] · 132003.221132.4
16. 17. 18. 19. 20. 21. 22. 23. 15.7. Site filling 15.8. Excavation of materials to fill another site 15.9. Landscaping The person acting on this permit shall apply and obtain for all other necessary permits including crane permits, road opening permits, hoarding permits, footpath occupation permits and/or any other approvals required under any other Act. Prior to commencement of work relating to a Development Permit for Operational Works, the Applicant shall sign a written undertaking to be responsible for the full cost of repairs to road pavement, footpath, kerb and gutter, or other Council property damaged as a result of construction of the proposed development. \f any person acting under this permit damages any Council property or facilities (such as underground drainage, water supply and sewage), through any cause whatsoever in the course of, directly or indirectly carrying out development, that person shall forthwith notify the Manager — Land Development and shall forthwith rectify that damage at its cost and to the satisfaction of the Manager — Land Development. Alternatively, the Applicant may request the Council to carry out the rectification works. Any damage to a water main shall be rectified by Council. Any damage to a sewer shall be undertaken by either Council or a Council approved contractor. In all cases, Council reserves the right to carry out rectification works in an emergency and where no reasonable attempt has been made to complete the rectification works as part of the development. All costs incurred by Council in any rectification works shall be repaid to Council prior to the endorsement of the Plan of Survey. A suitably qualified Register Professional Engineer, specialising in hydraulics shall prepare engineering drawings and specifications for stormwater designs and shall be submitted in conjunction with an application for a Development Permit for Operational Works. All designs for engineering works involving the construction of pavements, kerb and channel, vehicular access, footpaths, turnouts, stormwater drainage, water supply or sewerage reticulation shall be prepared generally in accordance with the requirements of Council's Engineering Design Standards, shall reference where applicable to Council's Standard Drawings and shall incorporate best engineering practice. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and specifications for all engineering works, which shal! be submitted in conjunction with an application for a Development Permit for Operational Works. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining properties to the reasonable satisfaction of the Manager — Land Development. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regards to the drainage scheme. The stormwater discharge from the site shall be designed such that there is no net increase in the rate of discharge as a result of the development for storm events up to 100 year ARI at the receiving waters. Tabulated hydrologic and hydraulic calculations that demonstrate the adequacy or otherwise of the existing site stormwater drainage system shail be submitted in - 30 -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.