Skip to the record
Accept no imitations.

Council archive · source document

23616 DA - Change a Development Approval [As Published] · 132003.221132.4

of 94

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

65.
66.

67.

68.

69.

Prior to Council engaging a consultant, quotations will be obtained in accordance with
Council's Purchasing Policy and the Applicant will be advised of the amount of the
quotation.

Power, Telecommunications and Street Lighting
All lots to be connected to underground power and telecommunications.
An underground electricity service shall be provided to each lot if not already provided.

In this regard, an approved ENERGEX Electrical Design Consultant shall work in
conjunction with Council's Manager — Works Support to prepare detailed designs of the
electrical proposal.

The detailed designs shalt then be submitted to ENERGEX for approval and a copy of
their approval submitted to Council in conjunction with a “Certificate of Electricity
Supply for Proposed Subdivisions’ (prepared by an approved ENERGEX Electrical
Design Consultant) prior to Council endorsing the Plan of Survey.

Any agreement with ENERGEX or an approved ENERGEX Electrical Design
Consultant shall be wholly at the applicant's expense and shall not entail a financial
encumbrance on future purchasers of the proposed lots.

Street lighting and pathway lighting throughout the subdivision shall be provided in
accordance with Council's Engineering Design Standards, section 11.3.3 and to the
satisfaction of Council.

The requirements for TELECOMMUNICATION services shall be satisfied in relation to
any existing services that currently traverse the site and for the provision of new
telephone services to the proposed lots. In this regard written confirmation from an
approved telecommunication agency shall be submitted to the Council prior to Council
endorsing the Plan of Survey.

Portable Long Service Leave

Prior to the issue of a Development Permit for Operational Works, the applicant shall
comply with the requirements of the Building and Construction Industry (Portable Long
Service Leave) Act 1991. In this regard, a statutory declaration outlining the cost of
building and construction works, as defined in s73.(1) of the Act, shall be submitted in
Conjunction with an application for Operational Works. If payment of the levy is
required, the approved forms as outlined in s77.(1), must also be sighted by the
assessment manager.

-37-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.