65. 66. 67. 68. 69. Prior to Council engaging a consultant, quotations will be obtained in accordance with Council's Purchasing Policy and the Applicant will be advised of the amount of the quotation. Power, Telecommunications and Street Lighting All lots to be connected to underground power and telecommunications. An underground electricity service shall be provided to each lot if not already provided. In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction with Council's Manager — Works Support to prepare detailed designs of the electrical proposal. The detailed designs shalt then be submitted to ENERGEX for approval and a copy of their approval submitted to Council in conjunction with a “Certificate of Electricity Supply for Proposed Subdivisions’ (prepared by an approved ENERGEX Electrical Design Consultant) prior to Council endorsing the Plan of Survey. Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall be wholly at the applicant's expense and shall not entail a financial encumbrance on future purchasers of the proposed lots. Street lighting and pathway lighting throughout the subdivision shall be provided in accordance with Council's Engineering Design Standards, section 11.3.3 and to the satisfaction of Council. The requirements for TELECOMMUNICATION services shall be satisfied in relation to any existing services that currently traverse the site and for the provision of new telephone services to the proposed lots. In this regard written confirmation from an approved telecommunication agency shall be submitted to the Council prior to Council endorsing the Plan of Survey. Portable Long Service Leave Prior to the issue of a Development Permit for Operational Works, the applicant shall comply with the requirements of the Building and Construction Industry (Portable Long Service Leave) Act 1991. In this regard, a statutory declaration outlining the cost of building and construction works, as defined in s73.(1) of the Act, shall be submitted in Conjunction with an application for Operational Works. If payment of the levy is required, the approved forms as outlined in s77.(1), must also be sighted by the assessment manager. -37-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23616 DA - Change a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.