60.

61.

62.

63.

64,

approved plans and conditions and in accordance with best industry practice under
their supervision.

General

Prior to commencement of any operational works arising out of this permit, security in
the sum of $70,000 must be lodged with Noosa Council, to secure performance of all
conditions of this permit. The security shall be in the form of cash or unconditional
trading bank guarantee acceptable to the Manager ~ Land Development.

The security will be returned upon satisfactory performance of all the conditions of this
permit and any other related development permits for operational works, less any costs
incurred by Council in ensuring compliance with these conditions or for any additional
inspections incurred for substandard work or work undertaken not in accordance with
this permit.

To protect the environment against siltation/sediment export or soil erosion as a result
of this development, an erosion and sediment control plan shall be submitted in
conjunction with any Development Permit for Operational Works. Site control
measures such as silt fencing, controlled gravel access to the site and controlled
disposal of waste, may be necessary.

All physical site control measures shall be installed and maintained until all Operational
works have been completed and accepted on maintenance. The erosion and sediment
control plan must be adhered to at all times.

Any alteration of a public utility or other facilities necessitated by the development of
the land or associated construction works either internal or external to the site shall be
at no cost to Council.

The proposed names of new roads (public and private) and parks shall be lodged with
the application for a Development Permit for Operational Works.

Names are to be selected from any of the following categories:-
63.1. Easily pronounced words of Murri languages.
63.2. Names or words of local significance or historical interest.

63.3. Flora, fauna, industry, topographical, geological and similar features and terms
relative to the district.

63.4. Sumames of persons of merit or historical significance. (Personal names should
be avoided.)

Approval will not be given to a name that is the same or similar to the name of another
road in the Shire, or of a road in close proximity in a neighbouring Shire. Names that
are not easily pronounced, or may cause confusion to emergency services are to be
avoided.

All street signs on new roads (public and private) and parks shall be erected prior to
works being accepted on maintenance.

Should Council require further assessment of a technical report submitted in support of
this application, the applicant may first seek the report's author to provide such further
assessment. Should Council still require an independent assessment of that technical
report, the Applicant shall pay all Council's reasonable costs associated with that
assessment within 28 days of invoice or prior to endorsement of the Plan of Survey
whichever first occurs.

-36-

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23616 DA - Change a Development Approval [As Published].pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.