Information Request - MCU23/0070 (as published)
Issue – Waste Storage Area
It is unclear if the proposed ‘Refuse’ area is of a sufficient size to service the proposed
development.
Information Required
11. Provide additional information regarding the proposed waste management requirement
for the whole of the development.
12. If required, amend the proposal plans to include a waste storage area of a sufficient size
to service the whole of the development.
Issue – Stormwater Drainage
The submitted documentation does not include sufficient information for Council to assess
how stormwater generated by the development will be controlled, collected, and discharged.
• It is unclear what the proposed structure downstream from the proposed detention tank
is and how it will integrate into the proposed drainage system (indicated by a blue
circle).
• It is unclear how the proposed detention tank overflows during events up to, and
including, a 1% AEP event (volume, discharge rate).
• It is unclear how the infiltration outlet of the detention tank will operate. Given the large
catchment area of the detention tank, Council is concerned the soil may become
oversaturated and the filtration rate of the soil will reduce which may adversely affect
the overall drainage system and the structural elements of the development.
• It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP
event. Council recognise that this field inlet serves both the overflow from the detention
tank and a small catchment area. Council is concerned that during events up to, and
including, a 1% AEP event this pit may surcharge and direct additional runoff on to the
footpath in the road reserve.
• The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a
discharge rate higher than 25 l/s during a 1% AEP event.
Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be
prepared by a suitably qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to
demonstrate that the stormwater system is conceptually functional.
Issue – Driveway Access
The submitted documentation does not contain sufficient information for Council to assess the
proposed driveway.
Information Required
14. Provide additional detail on the proposed driveway and crossover. The detail must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
Queensland) and include, but not be limited to:
a. dimensions, levels and grade of the access driveway; and
b. demonstrate that a B99 vehicle will not scrape or bottom out while entering or exiting
the driveway.
Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Information Request - MCU23/0070 (as published)Related documentApplication case desk ↗
About this file
- File size
- 252 KB (small file)
- File type
No other editions are linked here.