Skip to the record
For the highest quality transcripts.

Council archive · source document

Information Request - MCU23/0070 (as published)

of 6

Text shows just the words. Original shows the document exactly as it was published.

Issue – Earth works
An earthworks plan has not been provided and therefore it is unclear the extent of earthworks
required to be carried out for the proposed development.
Information Required
15.   Provide an Earthworks Plan demonstrating the extent of the proposed earthworks
      required to carry out the proposed works. The additional plan must be prepared by a
      suitably qualified person (RPEQ – Registered Professional Engineer of Queensland)
      and include, but not be limited to:
      a. the extent and volume of cut and fill; and
      b. demonstrate the proposed earthworks will not adversely affect any structures within
         the adjoining properties; and
      c. demonstrate that all retaining structures, both temporary and permanent, both above
         and below ground, will be contained entirely within the subject site.


Issue – Carpark Turnaround Bay
TTM’s Traffic Engineering Report states that the Parking Aisle Extension, although not
compliant with the standard 1 metre extension, meets the performance outcome of its intended
use. Insufficient information has been provided demonstrating a B99 vehicle can manoeuvre
the turnaround bay and exit the site in a forward gear.
Information Required
16.   Provide additional detail demonstrating that the turnaround bay at the end of the aisle is
      sufficient to allow B99 vehicles to manoeuvre the site and exit in a forward gear. The
      additional detail must be prepared by a suitably qualified person (RPEQ) and include,
      but not be limited to:
      a. assume proposed carparks R2, R3 and R5 are occupied.
3.    DUE DATE FOR RESPONSE TO INFORMATION REQUEST

The due date for providing the requested information is 14 September 2023. Email your
response to [email protected]. Please advise Council of your response to this
information request in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4.    OTHER DETAILS

You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.

Yours faithfully


Tara Norley
Development Planner




                                                                                        Page 6 of 6

Used in these records

About this file

File size
252 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Information Request - MCU23_0070 (as published).pdf · 252 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.