Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                   CALIBRE CONSULTING




 14.114 Carpark Design and Layout


 Specific Outcomes                     Probable Solutions                        Proposed Measures
                                       (if code assessable)
                                       Resident carparking is not located in
                                       the road reserve or between the
                                       residential or business building and
                                       the principal street frontage.




 O17                                   No solution provided                      Refer to Drawing set provided in this
                                                                                 Report (No. B14158.W-02A dated
 Car parking areas are landscaped
                                                                                 December 2014).
 to—
 a) provide shade;
 b) maximise infiltration of
 stormwater run-off;
 c) define parking areas;
 d) reduce direct visibility of car
 parking areas from external
 viewpoints;
 e) soften views of hardstand areas

 O18                                   No solution provided                      Calibre Consulting has provided a
                                                                                 Traffic Impact Assessment Report No.
 Development with the potential to                                               B14158ER01 (December 2014).
 generate significant traffic and
 parking impacts gives appropriate
 consideration to transport and land
 use issues23.




Table 7-2: Division 14: Earthworks

Table 14-52 Earthworks

 14.120 Effects of Works
                                       Acceptable Solutions (if self-
 Specific Outcomes                     assessable)                               Proposed Measures
                                       Probable Solutions
                                       (if code assessable)
 Drainage:
 O1                                    S1.1
 Finished surface levels ensure land   The finished surface gradient of any      Preliminary design indicates that
 is free draining.                     filled or excavated area is within the    finished surface levels will be in
                                       range 0.5% to 1.5% and drains to          accordance with required grade range.
                                       Council’s stormwater infrastructure
                                       where available or where stormwater
                                       infrastructure is not available, toward
                                       the street.
 Hydraulics:




B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 7
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.