Original source · versioned page text
Appendix F - engineering report
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.
CALIBRE CONSULTING
14.145 Strategic Transport Network
Specific Outcomes Probable Solutions Proposed Measures
(if code assessable)
Traffic generation from the Where the development leads to the Calibre Consulting has provided a
development is considered in a need to increase transport Traffic Impact Assessment Report No.
localised and a Shire wide context infrastructure in the Shire, the B14158ER01 (December 2014).
to ensure that: development contributes to the
(a) the transport network has the transport network in accordance with
capacity to safely and the requirements of Infrastructure
efficiently accommodate Charges Plans (ICP); and where
projected movements; and/or developments requires infrastructure
(b) the development includes not included in the ICP, the
measure to upgrade the development upgrades the
transport network to meet the infrastructure at no cost to Council.
imposed demands.
O2 The street network has high S2.1 Road planning and Calibre Consulting has provided a
development design facilitates as Traffic Impact Assessment Report No.
street connectivity, both within
many pedestrian and cycle B14158ER01 (December 2014),
the development and to the movements as possible and
surrounding local area. please refer for details.
provides for future connectivity and
integration with adjoining sites;
AND
S2.2 Arterial and sub-arterial roads
are designed so they can operate
with high volumes of traffic during
peak times;
AND
S2.3 Collector and local streets are
provided to support short trips for
local traffic moving in and between
neighbourhoods. Local traffic is
channelled towards collector
streets to ensure that traffic
volumes on local street are kept
low;
AND
S2.4 Collector and local streets are
designed to discourage through
traffic;
AND
S2.5 A collector street is provided
parallel to arterials particularly
where they pass through town
centres;
AND
S2.6 Appropriate width of road and
verge is provided to allow streets to
perform their designated functions
in the street network; AND
S2.7 A network of local streets
focused towards an activity centre
or school is provided for safe and
efficient pedestrian and bike
access to the school, safe
conditions for school buses,
setdown facilities, with on-site
parking where practical;
AND
S2.8 Passive surveillance is
maximised by designing streets to
B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS CIVIL ENGINEERING REPORT | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.