Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix F - engineering report

Attached to the e-mail MCU15/0111 & REC15/0031 Development Application F - Engineering report Email 7 of 8.

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                    CALIBRE CONSULTING




 14.145 Strategic Transport Network
 Specific Outcomes                     Probable Solutions                          Proposed Measures
                                       (if code assessable)
                                         enable development to front all
                                         streets and roads, including
                                         arterials;
                                         AND
                                         S2.9 Streets near Public
                                         Passenger Transport facilities are
                                         orientated to optimise the walkable
                                         catchments within 800 metres
                                         walking distance;
                                         AND
                                         S2.10 The street network has no
                                         more than 15 percent of lots
                                         fronting cul-de-sacs. The maximum
                                         cul-de-sac length is 120 m; AND
                                         S2.11 Street stubs to adjacent
                                         future development areas are
                                         provided at spacings of 200 m or
                                         closer to enable future street
                                         connections to be made;
                                         AND
                                         S2.12 Street block lengths are not
                                         more than 240 m long, and
                                         predominantly around 150-180 m
                                         long. Street block lengths are
                                         generally shorter closer to town
                                         and neighbourhood centres;
                                         AND
                                         S2.13 Direct, safe and attractive
                                         pedestrian and cycle routes are
                                         provided within and through the
                                         development and connect to bus
                                         stops.
 O3 Development is designed:           S3.1 Higher density development is          The development has a network of
 (a) to    encourage     travel   by   concentrated along public transport         pedestrian paths within the site that
     community transport, walking      Routes; AND                                 link to external pathways.
     and cycling rather than by car;   S3.2 There is provision for bus routes
     and                               through development sites;
                                       AND
 (b) to maximise accessibility via
                                       S3.3 Bus routes are located to
     existing     and        planned
                                       maximise patronage catchment and to
     community transport facilities.
                                       consider personal safety, lighting and
                                       traffic management;
                                       AND
                                       S3.4 At least 90 percent of all residents
                                       are located within 400 metres of an
                                       existing or planned bus route;
                                       AND
                                       S3.5 Pedestrian and cycle movement
                                       is provided within local streets to and
                                       through development;
                                       AND
                                       S3.6 Attractive and safe pedestrian
                                       and cycle connections are provided
                                       with shade trees, graded walking and
                                       cycle paths and lighting;
                                       AND
                                       S3.7      Buildings    and    pedestrian
                                       entrances are oriented to the street;



B14158.W | COOROY RETIREMENT COMMUNITY | PALM LAKE RESORTS                                   CIVIL ENGINEERING REPORT | 14
Log in to download the original file

Appendix F - engineering report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.