Planning Report
Development is designed Area as shown on Flood Hazard
and sited to ensure risk to Overlay Map in Schedule 2,
people and property from the finished floor level of
flooding is avoided or habitable rooms is at least
minimised. 300 millimetres above the
Defined flood event (DFE).
Where the DFE has not been
AO16.2 N/A
modelled for the area, the
finished floor level of
habitable rooms is at least
500 millimetres
above the highest recorded
flood.
PO17 Underground car parking No acceptable outcome N/A
areas are designed to drain provided
and function safely during a
flood event and power
failure.
PO18 Major electricity AO18.1 Development including any The proposed dwelling has
infrastructure & substations: sensitive land uses is at least: been sited at least 50m from a
transmission substation, 10m
(a) 50 metres from a from any other substation and
Development is sufficiently transmission substation; 30m from a transmission line
separated from major (b) 10 metres from any other easement.
electricity infrastructure and substation; and
substations to minimise the
likelihood of nuisance or (c) 30 metres from a
complaint. transmission line
easement.
Habitable buildings are not The subject site is not subject to
AO18.2 located within an easement for a any easements.
distribution line.
PO19 Development is located and AO19 Noise emissions do not exceed There is no adjoining or nearby
designed to avoid or 5db(A) above background noise infrastructure that will cause
minimise noise nuisance level internal to a habitable noise pollution or nuisance to
from the use of building measured in the dwelling.
infrastructure. accordance with AS1055.
PO20 Wherever practicable AO20 Where adjoining substations or N/A
habitable buildings are major electricity infrastructure,
orientated to avoid direct habitable buildings are
overlooking of major orientated so that the majority of
electricity infrastructure or outdoor living areas and
substations. windows of habitable rooms face
away from the infrastructure.
PO21 Earthworks and Drainage: AO21 Filling other than accessways: Filling is ensured to not extend
more than 3m around the main
(a) does not extend more building, will not exceed 500m2
Earthworks and drainage than the equivalent of 3 and will not impact local
operational works do not metres around the main drainage on adjoining
directly, indirectly or building, measured from properties. No filling is proposed
cumulatively cause the outer walls of the for the dwelling.
adverse building;
impacts external to the
(b) is limited to a maximum
development site by:
of 500m2; and
(a) causing ponding of
(c) does not impact on the
water on the site or
local drainage of adjoining
nearby land;
properties.
(b) increasing
22 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.