a. Ensures the design and The dwelling has been
a. Minimizing the total
siting limits the loss of sited in the proposed
footprint within which all location to utilize the
activities, building, vegetation to the
existing cleared area.
structures driveways and smallest extent By doing so clearing
other works are possible; will be minimized to
contained; b. Protects and retains preserve the ecological
ecological values and value of the area.
b. Locating development in
existing cleared areas or ecosystem processes
areas of low ecological to the greatest extent
value over other areas to possible within and
the greatest extent adjacent to the site;
possible; and c. Provides measures to Vegetation has been
allow for safe maintained to
c. Incorporating siting and
movement of fauna approximately 80% of
design measures to
through the site; and the subject site to
protect and retain ensure safe movement
ecological values and d. Provides suitable habitat of fauna is maintained.
ecosystem processes replacement and
within or adjacent to the replanting in
development site; and accordance with PSP3
Ecological Assessment
d. Where adverse impacts
Guidelines.
have been minimized, any
residual impacts on
ecological values are AO3.2 Habitat trees, recruitment A protected plan
compensated for through habitat trees, and roosting, survey report and
suitable habitat breeding and feeding areas are vegetation
replacement and protected for native fauna management report
replanting on site in the habitat. has been prepared to
first instance or in a way ensure vegetation is
that results in a net gain maintained in an
appropriate manner.
and enhancement of the
overall habitat values of
Noosa Shire.
PO4 AO4.1 Vegetation is protected from
Development provides for
disturbance of damage from Throughout the
effective measures during construction of the
construction and operation to construction and operation
dwelling vegetation will
protect ecological values activities by: be protected to ensure
including: a. Clearly marking trees to vegetation is not
a. Avoiding disturbance to or be retained with further disturbed.
clearing of vegetation in flagging tape;
and within the vicinity of b. Installing protective
the site; fencing around the
pipeline of the
b. Managing habitat
vegetation and avoid
disturbance and physical
filling and excavating in
harm to fauna from noise,
these fenced areas;
vibration, dust, light,
dewatering or excavating; c. Ensuring stockpiling,
and storage and vehicle
parking occurs outside
c. Avoiding clearing in areas
the identified
where erosion or slippage
vegetation areas; and
could occur.
d. Using low impact
construction
techniques around
vegetation.
26 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.