Original source · versioned page text
Planning Report
AO4.2 Vegetation which is capable of Vegetation will be
forming or contributing to a retained to
approximately 80% of
buffer between different land
the site to ensure the
uses or a buffer against visual amenity,
pollution, light spillage or noise pollution, light spillage
is retained. and noise is retained.
The existing vegetation
will act as a
Lighting associated with
AO4.3 screen/buffer in
development: ensuring these
a. Does not contribute an measures are
unacceptable level of maintained.
illuminance (greater than 1
lux) for light sensitive Lighting associated
species within or at the with the dwelling will
be incorporated to
boundary of an
ensure an acceptable
ecologically important level of illuminance is
area; and maintained.
b. Does not contribute to an
unacceptable level of
illuminance on landward
horizons along coastal
areas and known marine
turtle nesting beaches.
Clearing of vegetation does not The dwelling is located
AO4.4 involve clearing that may outside the landslide
overlay and is
cause or contribute to hillslope
therefore highly
erosion, bank erosion, or
unlikely to cause or
slippage. contribute to hillslope
erosion, bank erosion,
or slippage.
Connectivity
PO5 Development is designed AO5 Development is designed and
and operated to maintain The dwelling has been
operated to maintain ecological sited in the proposed
and enhance connectivity linkages and maximise opportunity location to utilize the
between and across for connectivity and the movement existing cleared area.
ecologically important areas of fauna by: By doing so clearing
and connecting habitat and will be minimized to
support unimpeded and safe a. Ensuring protection of wildlife
preserve the ecological
movement of terrestrial and refuges; linkages and maximise
aquatic fauna. the opportunity for
b. Maintaining vegetation in
patches of the greatest connectivity for the
movement of fauna.
possible size and within the
Vegetation will be
smallest possible edge-to- retained to
area ratio; approximately 80% of
c. Enhancing connectivity the site to ensure the
ecological value of the
through planning and
site is maintained.
rehabilitation works, including Connectivity through
across property boundaries, planning has been
to areas of national park, state carefully considered
forest or reserve; and has been
designed to ensure
d. Avoiding the creation of fauna has safe
physical barriers and safety movement through
hazards (such as roads, property boundaries.
pedestrian access and
instream structure) along and
27 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.