                  Bligh Tanner Consulting Engineers                                                                         Page 1
                  Noosa Flexi Learning Centre Stormwater Management Plan
                  August 2012



                  1 INTRODUCTION
                  This stormwater management plan has been prepared in accordance with the requirements
                  for Site Based Stormwater Management Plans as outlined in the Urban Stormwater Planning
                  Guidelines (DERM 2010) as referenced under the State Planning Policy 4/10 Healthy
                  Waters.

                  It described the stormwater strategy for the site and considers erosion and sediment control,
                  stormwater management (water quality and hydrology), and flooding, and has been prepared
                  to support a Development Application for the site. Key details about the site are listed in
                  Table 1 below.

                  The Noosa Flexi-Learning Centre aims to create a welcoming and distinctly un-institutional
                  learning environment for disenfranchised and disengaged youth in the Noosa Region. The
                  design response is to create a beach-house style environment which minimises its impact on
                  the site, as well as on the planet’s resources.

                  The young people that will use the centre are approaching life with few privileges. By
                  creating a learning environment that embodies great sustainability features, the design team
                  hopes to provide accelerated opportunities for them to understand and interact with the types
                  of environmental knowledge that we believe will be important to the world they are inheriting.
                  Such learning opportunities can help build their pride, self-confidence and a sense of
                  purpose.

                  The stormwater management strategy helps create such a place by:
                     • Preserving the natural hydrology across most of the site by building on piers, and
                         minimizing soil compaction during construction.
                     • Harvesting rainwater and using a prominent elevated rainwater tank that both
                         symbolizes the responsible use of water and reduces the electricity needed for
                         pumping.


                  Table 1 Key site information

                  Submission date                                 August 2012
                  Developer’s name                                Edmund Rice Education and the Flexible
                                                                  Learning Centre Network
                  Principal Consultant                            Fulton Trotter Architects
                  Consultant’s name                               Bligh Tanner Consulting Engineers
                  Current and proposed land use of                The site is currently vacant. The
                  development site                                proposed use is for a Flexible Learning
                                                                  Centre.
                  Description of site location                    The site is on Girraween Crt, Sunshine
                                                                  Beach Qld, opposite the Sunshine Beach
                                                                  High School and adjacent to Tennis
                                                                  Noosa. The site has recently been
                                                                  subdivided from the parent Lot 3 on
                                                                  RP887636 (at the time of writing the plan
                                                                  hasn’t been sealed).
                  Coordinates                                     26°24’25”S
                                                                  153°06’06”
                  Reference to associated documents.              Fulton trotter Architectural Drawings
                                                                  DA-01 to DA-06




                                                                                                        Print Date: 2 March 2020, 2:19 PM

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Storm Water management plan.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.