Council archive · source document
Storm Water management plan · MCU12/0133.03
Plans and drawings: the text below has words only, no drawings.
Noosa Council documents
Bligh Tanner Consulting Engineers Page 2
Noosa Flexi Learning Centre Stormwater Management Plan
August 2012
1.1 Locality Plan
The site location is shown in Figure 1 below.
Noosa Flexi-
Learning
Centre
Noosa Heads
Sunshine Beach
Coastal waters and
the Coral Sea
Sensitive to
changes in water
quality
Sunrise Beach
Noosa National
Park/Girraween
Nature Reserve:
Environmentally
sensitive healthland
which is particularly
sensitive to increased
wetting near
stormwater outfalls
and high nutrient
levels, leading to weed
infestations and
Burgess Creek
changes in the
vegetation community Increases in peak
flows could
exacerbate erosion
Castaways
Beach
Figure 1 Locality Plan showing the site in relation to relevant receiving environments
1.2 Site Characteristics
The site is approximately 0.5 hectares. It is on free-draining sandy soils (as described in
Section 1.6).
The rear, northern end of the site is at RL 34.1 m grading to RL 32.5 m at the southern
boundary, a grade of about 1.6%. A raised mount to the south east of the site rises to RL35
M. The lowest point of the site is at the south western corner, at RL 32.27 m.
It is currently vegetated with endemic dunal species, including Banksia spp. and
Xanthorrhoea spp.
Print Date: 2 March 2020, 2:19 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Storm Water management plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.