Engineering Drawings
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
GENERAL NOTES:
1. NOT ALL SERVICES HAVE NECESSARILY BEEN RECORDED AND
SHOWN ON THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO
LIAISE WITH THE RELEVANT SERVICE AUTHORITY PRIOR TO
COMMENCEMENT OF CONSTRUCTION TO DETERMINE THE LOCATION
AND LEVEL OF ALL EXISTING SERVICE UTILITIES. THE CONTRACTOR
SHALL BEAR THE COST OF ANY DAMAGE TO EXISTING SERVICES. LEGEND:
2. THE CONTRACTOR SHALL OBTAIN ALL AS-CONSTRUCTED SURVEY FINISHED SURFACE CONTOURS
FOR ROADWORKS, DRAINAGE WORKS, SERVICE CONDUITS ETC. EXISTING SURFACE CONTOURS
PRIOR TO BACKFILLING. ALL SURVEY TO BE CARRIED OUT BY A
LICENCED SURVEYOR TO THE REQUIREMENTS OF THE SHIRE
ENGINEER. PROPOSED CONCRETE DRIVEWAY.
3. SURFACE LEVELS SHOWN ARE INTERPOLATED FROM A SPOT LEVEL
SURVEY, THEREFORE DESIGN LEVELS BASED ON THIS INFORMATION PROPOSED CONCRETE FOOTPATH.
MAY BE VARIED BY THE SUPERINTENDENT ON SITE.
PROPOSED BIO BASIN
ROADWORKS NOTES: \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \
BIN STORE ABOVE
\
PATH ABOVE
\
REFER LANDSCAPE DWGS
PROPOSED DRAINAGE NETWORK
\
REFER LANDSCAPE ARCHITECTS DWGS
1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH IPWEAQ &
\
\
\
NOOSA SHIRE COUNCIL STANDARDS.
\
W100 PROPOSED 100Ø WATER MAIN
\
REFER LANDSCAPE ARCHITECTS DWGS
\
\
\
W EXISTING WATER MAIN
\
2. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
\
REFER LANDSCAPE ARCHITECTS DWGS
\
\
LANDSCAPE ARCHITECT'S DESIGN DRAWINGS. EXISTING SEWER MAIN
\
PATH ABOVE
S
\
\
STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE STORE
\
Unit 12 Unit 11 Unit 10 Unit 9 Unit 8 Unit 7 Unit 6 Unit 5 Unit 4 Unit 3 Unit 2 Unit 1
\
13.3m3 13.3m3 13.3m3 13.3m3 13.3m3 13.3m3 13.3m3 13.3m3 13.3m3 13.11m3 13.3m3 13.3m3
E EXISTING ELECTRICITY
\
3. SEDIMENTATION CONTROL DEVICES TO BE PROVIDED IN ACCORDANCE
PATH ABOVE
// // // // // // // // // //
\
spoon drain spoon drain
\
\
WITH THE ENVIRONMENTAL MANAGEMENT PLAN, AS SPECIFIED IN
\
BLIND ISLE BLIND ISLE
\
\
DWGS ES01 & ES02 & AS DIRECTED ON SITE BY SUPERINTENDENT. P25 P16 P7 P1
\
UNIT 11 UNIT 6 UNIT 1 UNIT 1
\
\
\
\
\
4. ROAD PAVEMENTS TO BE COMPACTED TO ACHIEVE A MINIMUM DRY P26 P17 P8 P2
\
spoon drain
UNIT 12 UNIT 7 UNIT 2 UNIT 2
\
DENSITY RATIO (M.D.D.R.) OF 100% STD.
\
\
\
\
\
WATER SUB-METER WATER SUB-METER
ASSEMBLY P27 P18 P9 ASSEMBLY D.P
\
Visitor UNIT 8 UNIT 3
5. ALL CONDUITS TO BE IDENTIFIED BY BRASS PLAQUES ON KERB AND
\
MBP 1
\
\
8 8
CHANNEL AS PER IPWEAQ STANDARD DRAWING R-0160 U.N.O.
Total rise: 1.450
Riser: 0.181
9 9
Tread width: 0.250
\
Tread width: 0.250
Riser: 0.180
Total rise: 1.440
7 7
MBP 2
10 10
6 6
\
11 11
P19 P10
8
5 5
Tread width: 0.250
12 12
Tread width: 0.250
\
Total rise: 1.450
4 4
Total rise: See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Engineering Drawings.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.